Browse by Faculties
Monograph
Renovating and upgrading customers’s house and related work in Simpang Ampat, Pulau Pinang area / Nuramirah Samsuddin. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The construction of flat slab / Nurfarah Hanim Mohammad Fadzil. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Purchaser materials for construction works / Nurin Afrina Muhammad Ruslan. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Property management: building manager’s obligations / Nurmishael Amalia Kamaruizam. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The quotation process at project Giatmara / Nursyakirah Shamsudin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building plan approval process at Majlis Perbandaran Taiping / Nursyazlia Ahmad Fauzi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building plan approval process / Nurul 'Adilah Abdul Aziz. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
The construction works of elevated water tank at Taman Abad, Tebrau, Johor / Nurul Aimi Ajlaa Md.Hasrin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Renovation inspection process at the clovers, Penang / Nurul Aimuni Athirah Mohd Shafie. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Periodical building inspection under Act 133 at Summit Subang USJ / Nurul Ain Aisyah Zulkifli. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The using of computerises maintenance management information system (CIMMS) in facility management at Bangunan Persekutuan Persiaran Jubli Emas Kangar, Perlis / Nurul Ainaa Afifah Ahmad Basri. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Supervision quality control of renovation house at no 1309, Taman Tunku Sarina, Bandar Darul Aman, Jitra, Kedah / Nurul Amerah Mohamad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Pad foundation construction / Nurul Amirah Nasyarah Che Zailan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Process of house defect inspection during DLP for high rise building: case study at Troika Residence / Nurul Aqeesya Abdul Aziz. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Brickwork / Nurul Asyura Md Zaini. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building condition assessment (BCA) for typical strata residential unit / Nurul Atikah Dzulkefli. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building condition assessment at Pejabat Daerah Yan / Nurul Atikah Ibrahim. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building maintenance work / Nurul Faiezah Mohd Zamili. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Defect inspection for house construction / Nurul Fatin Idayu Azman. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Renovation and maintenance project at Pertubuhan Peladang kawasan Padang Rengas fertilizer store / Nurul Hanis Azmi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The procuder of renovation project / Nurul Hidayah Mohd Noor. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The construction of mainline works at Sungai Besi - Ulu Kelang Highway (SUKE) privatization project / Nurul Izzah Balqish Yusnee. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Procedure of reporting the building defects / Nurul Izzah Mohd Azli. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Installation of RC column / Nurul Izzati Abd Rahim. (2020) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Construction management / Nurul Izzati Md Mazlin. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Maintenance and practical work for air-conditioning system at Ixora Hotel / Nurul Nabila Azhar. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building inspection for defect liability period at Setia ECO Glades Cyberjaya / Nurul Najah Nasrul. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Construction of a blower room at PJA 229, Indah Water Konsortium Sdn Bhd / Nurul Najihah Rohaizat. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Mangrove piling at Gunung Lang / Nurul Rabiatul Adawiah Yahaya. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Process of interlocking brickwork for wall at Perla Apartment Project / Nurul Syafinaz Nasfi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building approval procedure / Nurul Syafiqah Mohamad Rosidi. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Slab construction process for bungalow project in Tumpat, Kelantan / Siti Arisa Syafika Azman. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Tendering / Nurul Syamimi Hana Ngaini. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Renovation works of dewan serbaguna at Kompleks Belia dan Sukan Negeri Terengganu / Nurul Yasarah Mohamad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Plan approval process / Nurulain Abd Ghani. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Permits application process for construction at Majlis Perbandaran Taiping (MPT) / Nurul Athirah Ibrahim. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Construction process of beam and slab in Kompleks Belia dan Sukan Negeri Terengganu / Nurulhidayah Mohamad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building plan approval process: two storey terrace house at Taman Beauty, Mukim Simpang, Taiping, Perak / Nurulhuda Mohamad Anizan. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Rural roads maintenance at Kampung Tepi Alor, Mukim Naga, Kedah / Rashdan Munir Badrul. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Road maintenance / Puteri Nur Aidaliyana Amirruddin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Construction of Sewerage Pipeline Netwok at Jalan Mamanda 11 to Jalan Kabus, Ampang / Putri Nadila Emylia Suri. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Renovation works of Johor State Town and Country Planning Office at Bangunan Dato' Mohamad Salleh Perang, Kota Iskandar / Rahima Farisya Abd Rahim. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Personal Protective Equipment (PPE) at port / Razeen Rafiqi Nordin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
A study of Sewege Treatment Plants (STP) 1 at UiTM Merbok / Nurul Najwa Suhadah Ismail. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Extension of time for construction works at Sekolah Kebangsaan Kedaik, Rompin, Pahang / Seri Nuraliah Adzmi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The IBS construction for Perumahan Rakyat Termiskin (PPRT) single storey houses in Chemor, Perak Darul Ridzuan / Sharifah Nurin Afiqah Syed Razali. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Tebder process for construction project / Siti Humairah Azahari. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Process of submission approval for street lighting / Siti Maisarah Mohd Som. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Handling the process of installation, testing and commissioning of the extra low voltage (ELV) – access control system at manufacturing industries, Batu Kawan, Penang / Siti Nadiah Othman Foad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Bricklaying wall construction / Siti Nur Aishah Abdul Razak. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
A case study of precast drawing and construction at Starbucks, Discovery Park (Gamuda Cove), Tanjung 12, Selangor / Siti Nur Farzana Mohamad Fazali. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The stage and work process of Interior Housing Design / Siti Nurfarhanim Hanaffi. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Architectural design and defects of traditional house of Dato’ Mursyid Diraja Haji Abdul Rahman Bin Abdullah (surau) / Siti Nursalimi Mohamad Ruslee. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Infrastructural authority submission for multipurpose hall at Bandar Baru Permas, Johor Bahru, according to Act 133, MSMA2, ms1228:1991, mwa & span / Siti Rabiatul Adawiyah Mohd Adnan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Fire protection system at TNB Pasir Gudang / Siti Syahlizah Zainal. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Menaik taraf Pasar Taiping, Perak / Syahfi Irfan Syahril. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Maintenance & services work (roof renovation) / Syakir Aiman Samsuri. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The construction process of pre-cast concrete piling / Syamimi Mohamad Suhaimy. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Installation method of floor finishes for a unit of semi-D single storey house / Syazwana Qistina Abdul Aziz. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Pile cap construction for Klinik Kesihatan (Type 3) (KK3 Kepala Batas, Kedah) / Tengku Ammar Hakim Tengku Mahusin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building structural work for concrete slab & column / Umairah Fuad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The process of CCC approval / Wan Muhammad Syahmi Thaqif Wan Muhamad Subri. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Maintenance works at SMK Landas / Wan Nor Hakimah Wan Abu Bakar. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
House renovation / Wan Nur Alfira Wan Mohamed Razali. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Construction and maintenance of public facilities: bus stop / Wan Nur Alfira Wan Mohamed Razali. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Requirement for implementation of Rainwater Harvesting System (RWHS) for issuance of certificate of completion and compliance (CCC) / Zairul Azri Zuhairi. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Office renovation / Zikry Aiman Zulkefli. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Laporan latihan amali: penyeliaan di tapak bina / Mohamad Shahrul Nizam Mat Isa. (1996) Industrial Training. UNSPECIFIED. (Unpublished)
Autoclaved Aerated Concrete (AAC) blocks for wall element at Pejabat Kesihatan Daerah Jeli, Kelantan / Alif Ikmal Mat Izman. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of starken Autoclaved Aerated Concrete (AAC) block wall / A'fif Rusydan Othman. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of ground floor slab for administration building, Sakj Lebai Mohd Yaakob, Ayer Baloi, Pontian, Johor / Siti Nur Azirah Bachok. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The production of on site precast concrete components for Industrialised Building System / Muhamad Asyraf Hakeem Dzulkafli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Procurement of roller shutter for Masjid Kota Kemuning, Seksyen 31 Shah Alam / Mohammad Zulfazdley Mohd Zulkifli Cheng. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of pad foundation / 'Ainaa 'Arifah Awang Omar. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The addition of admixture into concrete for the construction of roof slab / Nur Aini Jamaludin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of car porch steel structure / Muhammad Danish Haykal Mohd Tarmizi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of additional roof truss steel structure for covered carpark / Natrah Munirah Rosli. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Workplace safety inspection at project site of renovation and maintenance work / Ahmad Azrul Ikhwan Juhar Arifin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of pad footing / Ahmad Danial Ahmad Tarmiji. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Gabion wall installation at Akademi Binaan Malaysia Wilayah Utara Sintok, Kedah / Anis Sofea Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Process of road maintenance works / Muhammad Alif Mokhtar. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building maintenance project at Menara Tabung Haji, JB / Zhimiya Muhammad. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Piling works of reinforced concrete pile / 'Ayuni Nadhirah Mohamad Yamin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Quality control of Sekolah Agama Kebangsaan Johor (SAKJ) project / Farah Aina Mohd Zam. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Superstructures work of housing / Mohamad Nurfakhrul Azizi Mohd Zalani. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction method of superstructure for terrace house / Wan Nurul Izzah Wan Ibrahim. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Use of UAC concrete wall panels as Industrialised Building System in school project at Putrajaya / Syafiq Najmuddin Jamali. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of residential housing using shear wall method / Nursyarnini Izma Shaari. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of the precast U-drainage / Mohamad Farhan Mohd Ayob. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Upgrading of road safety infrastructure (divider) / Nur Liely Syafiqah Khairuddin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Introduction to epoxy waterproofing method / Nur Yasmin Adibah Ronizam. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The defects in housing project / Fatin Sabiha Abdullah. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The extension of time of Kajang 2 commuter station / Siti Aisyah Afifah Zulkifli. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Earthwork and piling works / Nik Ahmad Bakri Mohd Iburadi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Defect list at semi-D housing project / Muhammad Izzat Farhan Mustapa. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Light weight concrete panel wall / Badrul Hisham Mohd Zamri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
A case study of building defects at Bank Negara Malaysia (lower ground 1) / Nur Syamira Zamri. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Defect of floor tiling / Muhammad Akram Hafiy Ahmad Sabri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Concrete frame structure of block 11 and block 12 of Academic Building for Faculty of Geoscience and Petroleum Engineering at University Teknologi Petronas Seri Iskandar Perak / Siti Fatin Najihah Samsul Bahari. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
RC pile and pile cap construction / Nur Zulaikha Mohd Razip. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Defects works at KL Traders Square Gombak / Nor Najwa Abd Rahman. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation process of reinforced concrete square pile for toll Plaza Complex Damansara - Shah Alam / Noraisya Mis Suan. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
RC column and beam construction / Noor Ismanajwa Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of staircase using aluminium formwork at Impiana Sky Residensi, Bukit Jalil / Muhamad Imran Nor Halim. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Preparation of bill of quantities / Mohamad Aiman Hafiz Jamil. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Internal cold water supply system of office building at chemical factory / Maizatul Hanisah Lani. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method and procedure of pile load test in PTD 182919, Bukit lndah, Iskandar Puteri, Johor / Nur Erisha Emalin Alwi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Type of tiles and their application in building / Muhammad Zahid Zainol. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Progress payment claims / Nurul Ain Ayuhibullah. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Tiles installation at 3-storey bungalow / Nurfarhana Ahmad Fauzi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of pile cap / Nur Syahira Liyana Mohd Ghazali. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method construction of pile cap / Nurul Afiqah Natasha Yahaya. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The uses of Technical Material Sheet (TMS) for the maintenance of a government office building in Putrajaya / Nurul Izzati Shamsul Bahri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Defects in construction / Putri Saghirah Nur Mohamed Nasri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Maintenance in residential building / Nurul Nabila Husna Zulkifli. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Total quality management for site supervision / Muhammad Aiman Abd Jaafar. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Passenger lift installation in Academic Complex at Sultan Azlan Shah Campus, Universiti Pendidikan Sultan Idris, Tanjong Malim, Perak Darul Ridzuan / Nur Anati Husna Norisham. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of road at Desa Bangau Parit, 28000 Temerloh, Pahang Darul Makmur / Nur Hidayah Rahim. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Roof trusses / Muhammad Safuan Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of precast column and beam (Industrialised Building System) / Nur Syakira Huda Radzi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
2-storey terrace house structure construction / Rabiah Nashamirah Abd Rahman. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Renovation work for a house / Mohd Shafiq Helmi Mohamad Sharif. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of billboard type gantry structures at KM 12.50 Elite Highway / Aina Awatif Kamarul Azizi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Brickwall installation / Aqilah Abdullah. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of floor and wall finishes for bathroom at Apple 99 Hotel / Siti Noor Aida Samsuri. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method construction of raft foundation / Mohammad Faqhrul Adzmi Khairuddin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of pile cap for double storey house renovation / Khairul Azhar Zainul Rashid. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Defect studies during defect liability period / Muhammad Aliff Imran Suardi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method construction of pre-bore spun pile / Nor Sharfieza Nor Shamsul. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Beam, slab and shear wall construction / Muhammad Abdillah Mohamad Nor. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of fire door and high security lockset at IPK Perlis project / Ahmad Syahidi Bokhri. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of finishes in a unit of high rise condominiums of the Henge, Kepong Kuala Lumpur / Muhammad Faiz Zakaria. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of steel framing system for Project Pembangunan Program Khas Perumahan Perwira Negeri Perak (PKPPNP) bagi Daerah Manjung, Negeri Perak / Nurinfarzana Syafiqah Salpian. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction for structure of single storey terrace house (Slabs, ground beam, roof beam and columns) / Muhammad lrfan Syarqawi Sulaiman. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of drainage / Muhammad Azmil Rosli. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building defect management: a case study at The Havre, Bukit Jalil / Muhamad Afiq Hakim Shamsul Anuar. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Compliance of documents in draft for authorities approval / Enaz Amani Ezali. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method construction of retaining wall for onsite storm water detention pond (OSD Pond) / Izzah Nur Imanina Ahmad Safawi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Plasterboard gypsum ceiling finishes at Tijani Ukay, Ampang / Muhammad Fakhrul Fu'ad Amir Ridza. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of substructures / Norshahira Che Soh. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of central air conditioning system / Muhammad Zaieful Danial Mohd Zaidi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Post tensioned slab system / Nurul Hazirah Abdul Halim. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Tendering process for Cadangan Menaiktaraf Laman MBPJ Dan Kerja-Kerja Berkaitan Untuk Tetuan Majlis Bandaraya Petaling Jaya / Nur Ain Syahira Asri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of flat roof on 27-storey serviced apartments in Utropolis Batu Kawan, Penang / Kamarul Asyraf Kamarulzaman. (2018) Industrial Training. Universiti Teknologi MARA , Perak. (Submitted)
Maintenance work at Kuala Lumpur International Airport / Nur Adlin Khairina Azewan. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Temporary work systems used for concrete frame construction / Nur Asmeehan Abu Bakar. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Concrete mansory unit: characteristic, method, advantages and disadvantages installation / Nur Haziqah Izzati Khairilanuar. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Reinforced concrete wall using steel formwork / Muhamad Khairul Nizam Mahmood. (2019) Industrial Training. Universiti Teknologi MARA, Perak +. (Submitted)
Load bearing masonry wall construction / Nur Fakhira Mohd Allif Effendy. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Concrete crossing slab as cover or closing for drainage at residential area / Saiful Hakim Fazal. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of RC pile for double storey semi-D houses / Nursyamimi Asyiqin Ahmad Nizam. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Superstructure work Industrial Building System (IBS) / Muhammad Izwan Izzuddin Hamidin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
External cold water supply system / Ahmad Razlan Alif Zuraimi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Retaining wall / Nur Fatin Azini Mohd Zulkifli. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction for Ismail Petra Mosque extended building / Norhafizai Daud. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Arch / Darren Tan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Certification of completion and compliance of cadangan sebuah gudang 1 tingkat di Jalan Perigi Nenas 8/7 Taman Perindustrian, Pulau Indah, Pelabuhan Barat, Klang / Muhammad Aqmal Ziqri Mohd Najib. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method installation of fencing works / Muhammad Shahrul Syazwan Bajuri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Road construction / Muhammad Izzaidy Zikry Roslan. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method of rectifying defects (flooring, wall crack and window leaking) / Nik Afif Haziq Nik Noor Ahmazukee. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of bored pile (substructure) for condominium Trinity Pentamont, Mont Kiara / Wan Nurelly Nazjiha Mohd Nor. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of raft foundation / Muhammad Adam Azrai Abdul Rahman. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction method of pre-boring works and spun pile installation at PTD 182919, Bukit Indah, Johor Bahru / Wan Mohd Danial Wan Najmi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction method of soil improvement for new surau of Taman Anika, Batu 9, Port Dickson and other related works / Norhikmah Ieman Baharudin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Investigation of defects during liability period / Azfar Danial Isyraf Anuaridhuan. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of asphalt road in flexible pavement / Nur Syahira Muhd Zailani. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Substructure in Raub biomass power plant / Ahmad Fikri Saipuzzaman. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of floor finishes / Nurul Izzah Mohd Nawawi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of reinforced concrete slab at Riana South Condominium / Qamarul Azarin Rusli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Leaking: the failure of design / Muhammad Abduh Almubarak Mohammad Shukor. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method installation of precast concrete pile using hydraulic injection (Jack-In Pile) system / Muhammad Amir Syahmi Sukhairul. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Failure in construction and its rectification at Riana South Condominium / Suaidah Shima Shahrin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Ground beam construction process of Complex Islam Pasir Puteh, Kelantan / Siti Nur Atira Mohd Nasir. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Perimeter wall and gate / Tuan Muhammad Afif Husaini Tuan Asmawi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of standard pier / Nur Ainin Sofiya Mohamed Sufian. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
A case study of spun pile / Fatimah Atifah Seyed Mohamed Mohamed Nazim. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of driveway / Izzat Farhan Mohd Razali. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Post contract work during defect liability period / Nursyahirah Yusri. (2019) Industrial Training. Universiti Teknologi MARA, UiTM Perak. (Submitted)
Implemantation of industrialized building system / Ahmad Hafiz Hizri Zulkefli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation methods of precast concrete beams & columns, Campus UniSZA Tembila, Besut / Zakaria Abd Hamid. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of pad foundation / Muhammad Zulhadzhim Md Sharif. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Progress claims and site valuation / Syazatul Aliya Shamsudin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Management and supervising of mechanical and electrical work at Phase Two The Havre Bukit Jalil / Azad Bukhari Aziz. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Piling works: Jack in piles / Ariff Irwan Asmawi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Post concrete work / Amir Hamzah Rashid Ridha. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Slope stabilization / Aina' Wahida Imran. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The installation method of u-beam and box girder / Nur Aqilah Zolkefli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of skillion roof / Nurul Hanis Hadi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Underground piping installation at the construction site / Nurul Sarah Mohamad Sinatra. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction process of superstructures for a single storey house / Sarah Nadhirah Nize. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Superstructure work of astaka / Muhammad Hafizi Rosiman. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Process brickwork at the construction site (wall construction) / Yusrizal Aizat Mohd Yusoff. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Drainage work / Ahmad Faris Hakim Azrin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Storage tank erection / Muhammad Haikal Haziq Abdul Halim. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Repair works on foor and wall / Muhammad Daniel Hakim Eddy Azuan. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction process of precast reinforced concrete of frame structure for Industrialised Building System (IBS) / Muhammad Aminuddin Kamarul Zaman. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of pad footing for semi-detached houses project / Farah Husna Azmi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Invitation to tender / Izhar Hairee Zawawi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The installation of column and beam for the construction of two storey hangar building / Nur Amira Syuhada Mohamad Salleh. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Static load test for spun pile piling / Mohamad Fazrul Arhan Mohamed Shaharudin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Fabrication and installation of steel truss / Mohammad Firdaus Mohd Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The installation of deep foundation (pile) using jack in machine / Mohd Asyraf Mohd Rozaidi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Roadwork construction / Muhammad Azwan Arash Wan Salman. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Substructure construction method / Muhammad Haziq Zainul Rashidi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Steel structures / Nurul Zafirah Jamaluddin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of pad footing at Gong Pauh, Kemaman, Terengganu / Nurul Afina Abdullah Khari. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Restoration of roof and ceiling / Muhammad Faiz Ahda Khairol. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method construction of pad foundation / Nur Naimie Nadjwa Khairuddin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
.AZV Design Works Vol.03 2024. (2024) Bulletin. Perpustakaan Tun Abdul Razak, UiTM Sarawak, Universiti Teknologi MARA, Sarawak.
Prosedur pembinaan sistem perparitan kotak pembentung / Muhammad Fahmi Ahmad Kamarudin. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Bored pile construction / Siti Arfah Mohd Radzuan. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Kaedah pembuatan konkrit siap bancuh di kilang / Afiq Faiz Ahmad. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Steel circular column formwork system / Muhammad Nasaruddin Mat Zaid. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Maintenance work at Apartment Laguna Biru / Muhammad Farid Azmi. (2016) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method of wall plastering / Fatin Nursyuhada Azmi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Construction work: Steel framing system / Fauzan Aizat Azri. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method installation of road sign and accessories / Fawwaz Ikmal Iqbal. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of brickwall and lintel / Fikrul Hazim Abdul Niszan. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Tendering process / Hafizuddin Kaiben. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Bricklaying process in construction site / Hanis Wahidah Mohamad Dashuki. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Water supply system repair works / Hariz Zuhair Halim Shah. (2022) Industrial Training. Universiti Teknologi MARA, ,Perak. (Submitted)
Finishing work / Harris Shamshuri Mohd Fauzi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Maintenance for air conditioning / Hazim Ahmad Danial Ahmad Hashimi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of ceramic tiles / Hidayana Husna Mohd Najid. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The categories and renovation process / Hilmihidayat Abdul Halim. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Maintenance of electrical work / Husna Bustamam. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Brickwall construction / Intan Najiha Mohd Latif. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Extension of time / Izzah Syazaliana Zulkarnain. (2020) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction and compeletion of pedestrian bridge at Persiaran Sarjana, Jalan Panchor, Bandar Universiti Pagoh / Luqmanulhaqim Mohd Yusri. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building maintenance (building defect) / Mohamad Al Imran Mohamad Nor. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Preparation of dilapidation report / Maryam Najibah Mua’anaff. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Structure construction / Megat Amirul Hakim Afandi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Site investigation / Meor Muhammad Fairiel Meor Sharul Halizan. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Road maintenance at Tebuk Haji Musa to Sungai Kota project / Mohammad Afiq Safwan Mohammad Khirul. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of single storey house in Selangor Darul Ehsan / Mohamad Amir Nasrudin Zulkepeli. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Gabion wall construction / Mohamad Amri Hasif Idris. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of porcelain floor tile finishes / Mohamad Hairi Daniel Arba'i. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Agreement to built a new structure telco project and permission to work / Mohamad Hazazi Hazran Mohd Rizal. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Floor finishes: Installation of tile flooring / Mohamad Nabil Fitri Ahmad Zamali. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Steel structure installation (frame structure) / Mohamad Nazrul Amir Zulkifli. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Wall constructions (load bearing wall) / Mohamad Nor Fakhrurrazi Hadzir. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction inspection / Mohamad Safwan Ismail. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Super structure work for semi-detached factories at I-Park SAC, Senai, Johor / Mohamad Solehin Shahrin. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction activity documentation / Mohammad Afif Rizalman. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Renovation of townhall / Mohammad Muizzuddin Marsujak. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of Sekolah Kebangsaan Parit Kudus using lightweight concrete / Mohammad Naim Haikal Hassan. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction process of strip footing for 465 units single storey house / Mohammad Nazirul Mubin Mohd Rasfan. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Shading devices for residential houses / Mohammad Zulhazmi Redzuan. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation and maintenance for air conditioning / Mohamad Hariz Suffiyan Mohd Raffi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of u-drain / Muhamad Amirul Shadiq Abu Bakar. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Procedures of corrective maintenance for commercial building / Muhamad Arif Nazman Mohd Nazri. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of brick wall on bungalow / Muhamad Badrul Hisham Mohamad Khairi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Tower footing stabilizer works / Muhamad 'Izzat Suhaimi. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building upgrading works / Muhamad Fareez Syahmi Mohd Kamal. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Coastal protection (PVD work) / Muhamad Hisyam Ikmal Mohd Rasul. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Wall construction / Muhamad Ikram Mohd Rozy. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building maintenance work / Muhamad Izery Ezzwan Abd. Jalil. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of roof beam / Muhamad Kamil Ramle. (2020) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Material selection and purchasing process / Muhamad Khairul Ikhwan Zamry. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of partition wall (non-load bearing wall) / Muhamad Luqman Al-Hakim Zakaria. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Key handing over and defect rectification monitoring / Muhamad Naqiyyuddin Mohd Hazman. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Retaining wall construction (gabion wall) / Muhamad Nukman Nadir Zolkapli. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Defect liability period / Muhamad Zairi Hamdan. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Renovation work of cheese lab / Muhamad Hazran Mohd Zali. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Water supply system repair works / Muhammad 'Ainul Furqon Syarif. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Defect management procedure of terrace house in Bandar Sri Sendayan / Muhammad Adib Musa. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Renovation in construction: Defect liability period / Muhammad Afif Akmal Mohd Shafiee. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method construction of superstructure work / Muhammad Afnan Che Kadir. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building forensic investigation of collapse hall at Cure & Care Rehabilitation Center (CCRC), Perlop / Muhammad Aidil Qayyum Mohammad Rusli. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of floor tiles finishes / Muhammad Aiman Haziq Ahmad Rizal. (2021) Industrial Training. Universiti Teknologi MARA, ,Perak. (Submitted)
Piling work construction / Muhammad Aiman Nasrullah Ahmad Ritzman. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Jack-in pile foundation / Muhammad Aiman Tajuddin. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction process of TNB compact substation / Muhammad Aiman Zikri Md Jizat. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Process documentation and method installation of aluminium strip ceiling / Muhammad Aizat Ma’amor. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of roadworks at Masjid Kariah Temeris - Bahau, Negeri Sembilan / Muhammad Akmal Shafiq Jafri. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Architecture drawing process (construction drawing ) / Muhammad Al Fateh Aqasya Mohd Nazim. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Tiles installation / Muhammad Alif Syakir Rosdi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Raising a Telecommunication Line Pole (TLP) / Muhammad Amin Ahmad Fauzi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of sluice gate building / Muhammad Amir Danial Ismail. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Piling and pilecap works for 1020 units apartment / Muhammad Amirul Afiq Alias. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Selection of sub-contractor for specialist work (rc piles installation works) / Muhammad Amirul Aiman Nor Azam. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Consultant tender / Muhammad Ammar Zakir Mohd Zamry. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Inspection (foundation and structural work installation) / Muhammad Amzar Elhamie Fazuny. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pump house construction work in Kuala Kedah, Kedah / Muhammad Arash Rizwan Salmee. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
A renovation works for space expansion of an office room / Muhammad Ashraf Ahmad Jasmani. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method of renovating school toilet / Muhammad Asrul Affendi. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Skim coating / Muhammad Asyraf Othman. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method of temporary structures construction / Muhammad Azim Zaidee. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Maintenance of fire alarm system at Klinik Kesihatan Muar, Kampung Parit Keroma, Muar, Johor Darul Takzim / Muhammad Azri Ahmad Puad. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction pile foundation at mosque in Klang / Muhammad Azwar Mohd. Ashaari. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Methods of store construction / Muhammad Danish Imtiyaz Mat Radzi. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of soil nailing / Muhammad Eizzam Mohd Zin. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of structure bridge in Kelantan Darul Naim / Muhammad Fahmi Arifin. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Staircase / Muhammad Faisal Azizam. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The bricklaying works for wall at Sekolah Kebangsaan Parit Kudus / Muhammad Fakhri Zharfan Azman. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Projek pembinaan Rumah Keluarga Angkatan Tentera (RKAT) pelbagai kelas Kem Tumbi, Jeli Kelantan / Muhammad Faqih Che Abdul Hamid. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method of solid panel / Muhammad Faqrul Hazrin Samudi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction engineering in building renovation / Muhammad Farhat Ezral Mizare. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Hotel room preventive maintenance / Muhammad Faris Imran Fared Fahishal. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building services and maintenance for air conditioner / Muhammad Firdaus A Hamid Faiz. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Wall finishes (cement plastered finish) / Muhammad Firdaus Mohd Nawawi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of pad footing / Muhammad Firdaus Razali. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Drainage maintenance / Muhammad Hafiz Mazlan. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building maintenance / Muhammad Hafizuddin Azami. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Air conditioning system / Muhammad Hafizudin Mohd Arif. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Piling work, construction of foundation and ancillary work / Muhammad Haikal Mohd Noor. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of parquet board for two storey house / Muhammad Haikal Zuhri Zulkifli. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Defect in construction site / Muhammad Harith Haziq Abdul Aziz. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Build and complete fences and related works at Pejabat Pertubuhan Peladang kawasan C-II Kerpan, Wilayah II, MADA / Muhammad Hazim Che Zaim. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Structural works of column and staircase for water tank / Muhammad Haziq Azhad Ahmad Nizam. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Tendering processes / Muhammad Haziq Zol Kapeli. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building plan approval in Taiping Municipal Council / Muhammad Hazmin Hakimi Hazrey. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Work on upgrading drain / Muhammad Hazrul Amin Abdul Razak. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Replacement broken tiles / Muhammad Idham Noor Effendi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Industrialised building system: precast concrete wall / Muhammad Idlan Harith Haidir. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pre-construction dilapidation survey on building and road infrastructure at Sungai Ara Penang / Muhammad Ikram Mohd Basri. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Wall construction process at Simfoni West Taman Tunku Intan Safinaz / Muhammad Iqbal Zamani Muhamad Narzri. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of tie-back earth retaining structures / Muhammad Izham Irwan. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of shear wall simple formwork system / Muhammad Izzat Mohamad Rahmat. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Silt trap construction / Muhammad Izzat Shafizuddin Pearl Noorhazizan Pearl. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building maintenance process during defects liability period / Muhammad Khaidir Mohd Yusni. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Tendering process / Muhammad Mikraj Abdul Rahimi. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building structure / Muhammad Nabihan Zahin Mat Nasir. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The post-construction process for new building of SSM Perak / Muhammad Najwan Razak. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)
Tender and estimated cost for genset work / Muhammad Nasri Adli Ujang. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Replacement of floor finishes from carpet to tiles at Akademi Audit Negara, Bandar Enstek, Nilai / Muhammad Nur Amin Effendi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Repairing the rubble of the river bank / Muhammad Nur Ikhwan Mohamad Hanafiah. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Upgrading electrical equipment / Muhammad Qayyim Ahmad Kussaimi. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Brick wall construction of single storey house / Muhammad Raif Danish Md. Robyzaquri. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Concrete ground floor slab construction / Muhammad Razif Dinnie Mohd Tarmizi. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Road construction method / Muhammad Raziq Imran Mohd Razif. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of reinforced concrete beam for low-cost bungalow in Mukim Naga / Muhammad Ridwan Musa. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method of construction for ground beam / Muhammad Ridzuan Muhamad Ali. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Asset monitoring procedure in Puteri Island Resort / Muhammad Shahid Muzafar. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of house / Muhammad Sharmizi Abu Bakar. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Green Building Index (GBI) certification for Damansara - Shah Alam elevated expressway’s toll plazas / Muhammad Lukman Hakim Ahmad Shahrul Nizam. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Dilapidation survey for bungalow and semi-d houses at Pontian, Johor / Muhamad Syafi Daniel Afifuddin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Construction of brickwork (load-bearing wall) for worker’s quarters / Muhammad Syahmil Afiq Rozzaieman. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Piling test / Muhammad Zikry Mohd Sabri. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of covered walkway at Jalan Hang Jebat infrastructure at PNB 118, Kuala Lumpur / Muhammad Zulfadzli Shamsulanizam. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Finishes work at water features roundabout / Muhammad Nur Aiman Hakimi Mohd Hanafiah. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Blockwork laying an AAC block / Muhammad Zulhaziq Zulkurnain. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Tender strategies of the Putrajaya 8md3-infrastructure development package / Nabihah Mohd Yazid. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Conventional water treatment plant in Karak, Bentong district, Pahang Darul Makmur / Nafhatun Jahirah Mohamed Azri. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Microsoft programming, the process of making Gantt Chart / Nazri Mohd Ass’ri. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Method of beam launching for East Klang Valley Expressway (EKVE) bridge / Nik Mazni Iryani Nik Mansor. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction process of pad footing for 1 unit semi detached house / Nik Mohamed Syahmi Nik Mohamed Shaifuddin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
The process and maintenance of a residential houses of Presint 10, Putrajaya / Nik Najwa Nik Fazri Namili. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Tiles finishes / Nizam Hairi Hussin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Contract administration for the construction of a bungalow house in Asam Kumbang Taiping, Perak Darul Ridzuan / Noor Fatehah Idris. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
The repairing construction of badminton court / Nor Farzana Abdul Ghafur. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
The installation of reinforced concrete slab / Nor Haifa Nor Lizan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
The renovation design process / Nor Hidayah Nor Hesham. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Road maintainance / Nor Najihah Mohd Nasir. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Industrialised building system (IBS): interlocking solid panel / Nor Wardina Yaakob. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Installation of ceramic tiles / Norain Syuhada Zulhime. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Site safety and health / Norazza Miza Ahmad Zuhudi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Wall material used for a two-storey house at Parit Haji Talib (AAC block and sand lime brick) / Nur A’reesyia Mardhiah Norazemi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Tendering process / Nur Afifah Syahril. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Installaton of RC column / Nur Afrina Sofian. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Preliminary work at construction site / Nur Aiman Su’aidi Abu Bakar. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Preparing A Vacant Possession for M1 MSN Development Sdn. Bhd. / Nur Ain Darwisyah Mohd Saufi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Construction health and safety management for the construction of public toilet in Rembau district / Nur Aina Nasuha Muhamad Shah. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Roof renovation process / Nur Aliah Abd Hadi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Tender process of the Putrajaya 8md3- infrastructure development package / Nur Alisa Sofia Mahadzir. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Dilapidation survey and inspection at Sentul Kuala Lumpur / Nur Alyaa Mohd Alkusari. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Building condition assesment / Nur Alysha Nor Azham. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Implementation of green 5s manual in construction work at Perla Ara Sentral Site / Nur Amirah Roslim. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Method of piling constructions (timber mangrove pile) / Nur Anis Farzana Zulkiflee. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Installation of roof / Nur Anis Nadhirah Zulkefly. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
The procedure of building plan approval for factory / Nur Arisa Saifullizan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Dilapidation and repairing works / Nur Arisha Abd Rahman. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Project tender: soil investigation Taman Tangkak Emas - Fasa 3 / Nur Atira Jamaluddin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Kitchen renovation works / Nur Azlina Azizan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Building plan approval process / Nur Azreen Mohd Zurab. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Bus stop construction and maintenance / Nur Dayana Firdaus. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Preparation of tender document / Nur Diana Sallehuddin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Method of reinforced concrete (column) / Nur Farzana Ayina Rahimie. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Installation method of unipaver interlocking paver / Nur Fatihah Murad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Procedures in selecting main contractor for open tender type / Nur Fatin Shahzleen Md Najib. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Industrialized building system (IBS) / Nur Fatin Syafiqah Mohd Hasni Hamizi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Tendering process / Nur Habibah Abd Rahman. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Methodology of exterior facade design (wall screening) of a school / Nur Hajidah Shaharudin. (2020) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)
Tiny house design proposal / Aimi Syamimi Azman. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Assessment of detailed ceiling inspection due to the ceiling collapse at classroom / Alyani Izzati Mohd Zainal. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Project management of renovation works of a lecture class into a cyber secutiy lab at FSKM,UiTM Shah Alam, Selangor / Amalin Nur Fazirah Zairi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Construction work using aluminum formwork system at Viluxe Terrace House / Ammar Zikry Zakaria. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Tender document preparation process: project of Masjid Terapung Daerah Yan, Kedah / Amni Amalia Mahadzir. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Building defect complaint issues in Vista Alam management / Amyrul Hanif Misrun. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Pre-dilapidation survey for infrastructure (road) at Bandar Sultan Suleiman, 42000, Port Klang, Selangor Darul Ehsan / Anis Sahira Baharuddin. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Implementation of quality management system (QMS) in construction project at Taman Belimbing, Jitra Kedah / Wan Amni Aizah Megat Abdullah. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Quality issues of food stall’s construction at recreation center, Kelemin’s River, Dungun, Terengganu / Asiah Nabihah Ishak. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Process of replacing a damaged waterproofing for D’Anjung Inn Hotel, Tangkak, Johor / Muhamad Nur Ikhwan Mohd Nooh @Mohd Noor. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Upgrading work on on floor tiles (toilet) at building department JKR Negeri Kelantan / Che Mohamad Shafiq Aiman Che Othman. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Installation of precast reinforcement concrete (RC) piles at Stadium Bola Sepak Kompleks Sukan Seri Manjung / Daniel Iskandar Hakimie Mohamad Roshidi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Renovation guideline and process at Grandezza, Eco Sanctuary / Erfa Rauhah Shahril Anuar. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Dilapidation survey report (during construction and completion of light rail train line 3 of phase 5 - area 1) / Farrah Nadhirah Mohd Azlan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
The building maintenance management in Ixora Hotel, Penang Malaysia for lighting system / Fitriyatul Amani Sulaiman. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Procedures of tender for upgrading the hot spring at Tok Bok, Machang, Kelantan / Nurul Afifah Mohd Asri. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Certificate of completion and compliance (ccc) approval process for 2 units of 3 storey office shops at Mukim Tanah Merah / Hadfina Mirza Mohd Noor. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Method road construction process use bituminous premix / Hafizah Fitrah Abd Nasir. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The extension width of road within use pmc material and maintenance work on Parit 6 Kampung Paloh, Layang-Layang Kiri Mukim Bota / Hayati Khan. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Training module for house defect inspection for residential building: case study at Taman Kota Seribong / Nur Hidayah Maliki. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Renovation procedure follow by house rules at the address condo, Bukit Jambul, Penang / Khairun Aina Mohamad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The implementation of indoor environment quality (IEQ) at public works department (PWD) jajahan Kota Bharu, Kelantan / Mimi Aqielah Hashim. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
New application process for bungalow housing project from early stage until issued of certificate of completion and compliance (CCC) at Batu 7 Lekir, Perak / Mohamad Fikrul Hakim Mohd Fadhillah. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Maintenance and facilities management of Kota Putera Square (KPS) / Mohamad Zuhairi Effendy. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Defect processess after vacant possession at Block B Vertu Resort, Aspen Vision City, Batu Kawan, Pulau Pinang / Mohammad Asyraf Ikhwan Helmi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The construction process of “Kolah Wudhuk” Masjid Bukit Tanah, Jabi, Besut, Terengganu / Mohamad Amerudin Mohd Zarawi. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building Information Modeling (BIM) Rumah Tok Su / Mohd Izzat Mohd Sham. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The construction of perimeter drainage pipe culvert for commercial centre for 2 unit building office and shop at Kuala Ping, Terengganu / Mohd Ridzuan Harun. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Construction project management implementation: case study on constructing and finishing 2 unit 1988 ft 2 semi-detached house at Mentuan / Muhamad Afnan Afiq Nazi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Conventional for drainage installation system at UMT education complex project / Muhamad Qadri Hidayat Abdul Kahar. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The process of upgrading the Lata Janggut landscape / Muhammad Aashif Kamarudin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Maintenance on civil works at Hospital Yan, Kedah by UEM Edgenta Mediserve Sdn Bhd / Muhammad Afiq Zahari. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Recommendations for improvement based on fire incident case at Lot no. 4.18b (Relysis Computer), Level 4, Plaza Pelangi, Taman Pelangi, Johor Bahru, Johor / Muhammad Akmal Sugeng Triwahyono. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Proposed building and setting up 1 unit bungalow at Kampung Padang Kala, Melor, Kelantan / Muhammad El-Husairi Abdul Roni. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Architectural renovation works of the Deputy Vice-Chancellor's Office (Academic & International) on level 3, Chancellor's Building, Sultan Abdul Jalil Shah Campus (KSAJS), Universiti Pendidikan Sultan Idris, Tanjong Malim, Perak / Muhammad Iqbal Abdullah. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Connection cable service projects 11kv, 33kv and 132kv (workline engineering) / Muhammad Iqbal Khan Ibrahim. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Implementation of personal protective equipment (PPE) for safety aspect among labour in Bukit Kor, Terengganu / Muhammad Seri Afiq Azlan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Maintenance works for the common area at Seri Baiduri Apartment, Shah Alam, Selangor / Muhammad Zuhdi Ahmad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Qlassic audit and inspection: single storey house project at Seri Iskandar, Perak / Muhammad Zulhusni Dahlan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Process of preparing a tender document for state road in Jeli district / Muhammad Najmi Zulkifli. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Process of tender for a project of ‘kerja-kerja pembaikan & baik pulih bangunan (Sivil & Elektrikal) serta kerja berkaitan termasuk pagar keselamatan di Kuarters Polis Wakaf Mek Zainab, Kota Bharu, Kelantan / Najihah Mahfuzah Mazlan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building performance assessment (BPA) of JKR Selangor Mechanical Engineering Branch Office / Nik Nurul Syahirah Nik Mohamad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The procedures of development approval for public housing project 1 Malaysia / Nor Asmaniza Md Asam. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Road damages and maintenance procedures as per government guidelines in Majlis Daerah Lenggong, Perak / Nur Ain Nabilah Mohd Dahalan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Facility and maintenance management of Apartment Taman Sri Pinang Block A,B,C Butterworth Pulau Pinang / Nur Aina Yusrina Yusri. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Project management; monitoring and controlling setback at construction site Nizaha, Taiping / Nur Athirah Fatin Mohayidin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building condition assessment (BCA) of Jabatan Kerja Raya (JKR) Jajahan Kota Bharu, Kelantan / Nur Atikah Mat Nasir. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Vacant possesion for m1 residence project (28 unit double storey terrace houses) at Jalan Keruing 8/2, 43000 Kajang Selangor under MSN Development Sdn Bhd / Nur Atiqah Mohamed Aseri. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building plan approval for extension and renovation work for industrial building / Nur Azira Imron. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Maintenance works at Rumah Peranginan Persekutuan (RPP) Tasik Kenyir, Terengganu / Nur Azmah Afiqah Saidi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The waterproofing process of reinforced concrete flat roof on terrace house at Teluk Intan, Perak / Nur Farah Aina Hairul Anuar. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Construction of floor for International School (Phase 2a), Horizon Hills / Nur Hafizah Youszelan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Method of piling and pilecap works on reclamation land / Nur Hakimah Fazil. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Toilet renovation / Nur Hanis Kamarudin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Industrialised building system (IBS) concept: lightweight brickwall installation / Nur Hidayah Mohd Fauzzy. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Maintenance management of Phileo Damansara 1/ Nur Husnina Zawari. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Railway track infrastructure / Nur Izyan Abdul Mukmin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Handling the process of user complaints through Facilities Management System (FMS) at UiTM Kedah / Nur Izzati Sharizan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Building demolition at Ibu Pejabat Polis Kontijen (IPK) construction site Kuala Terengganu / Nur Maisarah Che Zakaria. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Renovation of space for chocolate lab / Nur Malisa Mohd Nadjil. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Defect inspection of building element wall and floor for economic and commercial office Spain in Malaysia / Nur Nabila Natasya Ainna Mohmad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Tendering process / Nur Natasya Mohd Isa. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
House renovation / Nur Nisa Syafiqah Nasir. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Road and drainage installation / Nur Qajwa Qashira Shamshul Kamal. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Floor finishes and installation synthetic sport flooring as finishes at Kompleks Sukan Hulu Terengganu / Nur Sabrina Ramlan. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Highway construction for Kuala Terengganu bypass / Nur Shafira Amira Mohamed Zaidi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Installation of IBS lightweight concrete panel wall / Nur Shahida Ramli. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The building maintenance works and practice for closed-circuit television (CCTV) at Ixora Hotel, Penang Malaysia / Nur Sufiyah Ismail. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
School’s building maintenance / Nur Syamimi Mustaffa Kamal. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Tendering strategies for infrastructure works at Plot 8MD3, Precinct 8, Putrajaya / Nur Syazwana Sanaidi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Analysis financial of commercial property in Arte Mont Kiara / Nur Syazwani Azman. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Installation of ceramic tiles / Nur Syuhada Suhaimi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Elevator installation at Sungai Pinang apartment / Nur Zafirah Rosshidi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Variation order process for renovation of a single-storey house at Balok / Nur Zuhairah Syazwani Shaifullizam. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Method of roof construction / Nurafiqah Nadhirah Zulmat. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Construction process / Nur’Ain Natasha Mohd Mansor. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Installation of retaining wall at 3 storey house at Tanjung Bungah / Mohd Izham Mohd Zin.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Unpublished)
Certificate of complete and compliance for Maternity Hospital Kuala Terengganu / Nor Salwana Bidin.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Unpublished)
Construction management Qlassic assessment at Idaman Lavender 2 / Nur Khairunnisa Kamal.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Unpublished)
MoU Between Alor Gajah Municipal Council and Universiti Teknologi MARA. (2018) Other. Pejabat Jaringan Industri, Komuniti dan Alumni (ICAN), Shah Alam. (Unpublished)
Formwork report / Ahmad Nor Haffiz Abd Rahman.
(2017)
Industrial Training.
Universiti Teknologi MARA, Perak.
Crack on reinforcement concrete beam / Norsyasya Firzanah Azame.
(2018)
Industrial Training.
Universiti Teknologi MARA, Perak.
Dilapidation survey for proposed construction at Sungai Ara / Liyana Safiah Azman.
(2022)
Industrial Training.
Universiti Teknologi Mara, Perak.
(Submitted)
Cerucuk konkrit terpintal/ Muhammad Redzwan Mohamad Raffe.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Unpublished)
Sloping protection / Fazli Hamidi. (2005) Industrial Training. UNSPECIFIED. (Unpublished)
Kerja-kerja cerucuk untuk pembinaan bangunan pejabat dan makmal bioteknologi / Mohd Hafiz Abd Khalib. (2003) Industrial Training. Universiti Teknologi MARA (UiTM). (Unpublished)
Kerja-kerja, masalah-masalah dalam aktiviti cerucuk serta penggunaan tetulang / Noor Izzati A. Rahman. (2003) Industrial Training. Faculty of Architecture, Planning and Surveying. (Unpublished)
Prima board / Haliza Ab Karim. (2003) Industrial Training. UNSPECIFIED. (Unpublished)
Kes kajian: perkhidmatan kemudahan bangunan di Bangunan Grahana Makmur, Melaka / Dian Ainor Mizan. (1999) Industrial Training. UNSPECIFIED. (Unpublished)
Kerja-kerja cerucuk untuk pembinaan masjid baru Daerah Bentong / Mohd Nazeri Mohammad. (2003) Industrial Training. UNSPECIFIED. (Unpublished)
Kaedah pembinaan loji rawatan kumbahan/ Siti Nurfarrahafiqah Mohammad Rosli. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Kaedah pembinaan tangki septik / Muhammad Abdul Rahman Jamal.
(2008)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pengubahsuaian bangunan: kajian kes bangunan Puduraya / Muhammad Ammar Ahmad Zahrol.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Brickwall construction for fence / Khairul Daniel Haiqal Khairul Azam. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Bore pile / Nor Faizah Padzillah.
(2006)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pengendalian perancah bagi projek pelebaran Jambatan Pulau Pinang / Norfadila Fadzil.
(2008)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pengurusan dan perancangan kerja-kerja sementara / Az' Qusyairi Aznan.
(2007)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Prosedur-prosedur yang dijalankan oleh industri pembinaan mengikut MS ISO 9000:2000 / Ahmad Tarmimi Adnan.
(2008)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pengaruh alam sekitar dan pengurusannya ditapak bina / Ahmad Sharil Hafiza Che Yaacob.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Sistem penilaian kualiti CONQUAS 21 / Ahmad Ikhwan Abdul Rahim.
(2008)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kesan pembinaan struktur konkrit bertetulang berhampiran kawasan laut / Nurhafizah Mohd Ali.
(2008)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Prosedur pembinaan sub-struktur jambatan / Muhammad Maziz Mussori.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pembinaan struktur kerangka bangunan / Mohamad Syamir Md Deris.
(2007)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pengurusan pembelian bahan binaan / Noor Zakiah Khairuzzaman.
(2007)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Masalah pembaziran bahan binaan di tapak bina / Nur Hidayah Idris.
(2007)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kelewatan pembinaan dan pengurusannya / Mohd Shahrul Azhar Yusop.
(2005)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pembinaan bumbung / Mohamad Shahrul Waizan Wahab.
(2006)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pembinaan tembok penahan jenis "cantilever wall" / Muhamad Aliff Shaari.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pembinaan sistem binaan berindustri (pasang siap) / Nor Syahidahtul Ariffah Ismail.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pelebaran jambatan (superstruktur) / Nor Aida Rafidah Abdul Razak.
(2008)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kerja-kerja tanah (cut and fill) / Mohamad Rizwan Bakar.
(2008)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pembinaan tapak dan dinding tangki air jenis 'mushroom' / Zulkifli Yeop Ismail.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kajian amalan keselamatan di tapak bina / Wan Nurlaila Ramlee.
(2007)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pembinaan struktur kawalan jenis "radial gate" / Siti Salwa Abd Hamid.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Sistem Pengurusan Kualiti (ISO 9001:2000): Manual Kualiti Keltrade Sdn.Bhd. / Nurasby Mohd Azmi.
(2008)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Proses tender rundingan - projek jalan di Kepala Batas, Pulau Pinang / Norhayati Mohd Arom.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Perlaksanaan kerja-kerja audit dalaman dalam sistem pengurusan kualiti ISO 9001:2000 / Norhanizah Abd Rashid.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kerja-kerja penanaman cerucuk konkrit bertetulang segiempat tepat / Nor Azlaily Zakaria.
(2007)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kelewatan dan tempoh lanjutan masa bagi projek pembinaan kompleks gerai empat tingkat / Noorita Mohd Zainal.
(2007)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Sub-contractor selection process for private organization in Perak / Noor Fadhilah Md. Zailan.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kerja-kerja struktur atasan (superstructure) / Mohammad Najib Mohd Hashim.
(2008)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Proses penyediaan tapak bagi kerja-kerja infrastruktur / Maisilla Mutaza.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pembinaan ruang bawah tanah (basement) / Hairul Anuar Razali.
(2008)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pengendalian perancah jenis rangka tiub keluli / Khairin Nidzar Othman.
(2007)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kerja-kerja membaikpulih kecacatan kemasan bangunan - satu kajian / Mohd Hazwan Hanip.
(2007)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kadar membina harga / Hazirah Alias.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Proses pembinaan semula bangunan / Nor Hanisah Bahrudin.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pembinaan struktur kerangka bangunan / Mohd Aznin Zaini.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pemasangan kemasan lantai jenis kayu laminat / Muhammad Azri Johari.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kajian kes kerja meroboh bangunan tambahan surau di Taman Seri Andalas / Rasydan Salleh.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kawalan bunyi ditapak bina (construction noise control) / Ridzuan Abd Aziz.
(2003)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Penggunaan konkrit siap bancuh di tapak bina / Mohamad Syihabuddin Jusoh.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pembinaan struktur kerangka atas bangunan (super structure) / Mazita Mohd Zain.
(2003)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pemasangan bumbung jenis keluli ringan / Muhammad Haziq Osman.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Proses perolehan tender / Maizatul Aslina Ali.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The construction of pile foundation / Adila Syahira Aris Kamalizan.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Aluminium formwork (TAC System) / Muhammad Khairi Yahaya.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Type of pipe used at the building / Che Ku Aimy Farham Che Ku Madzlan.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Bahan, mesin dan peralatan di tapak / Nabilah Sarip.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pemasangan lantai kayu / Mohamad Asrul Nizam Mohd Asari.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Sistem batu-bata saling bertaut (IBS) / Muhammad Adam Mahmood.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Refurbishment work / Nor Hidayah Satiman.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Construction of staircase/ Asma Abdul Aziz.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pad foundation construction / Nurhamizah Mazlan.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The construction of substructure / Muhammad Farhan Ahmad Asri.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Construction of concrete dome structure / Mohd Zulfakarudin Shukri.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pile test method / Azril Aizat Ab Aziz.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The construction of In-Situ concrete staircase / Wan Abdul Wafi Wan Abdul Ghani.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Cerucuk konkrit bertetulang / 'Adil Azman.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Contract administration / Diyanah Abdul Gani.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Mechanical and electrical installation / Nur Nabilah Hannah Ghazali.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Progress claim / Amalina Aziema Ahmad Azam.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pemasangan struktur komponen konkrit pra-tuang / Ainur Fatheen Nadiha M. Hatta.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
Installation of IBS roof trusses / Siti Zuraida Zulkifli.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Housing construction / Nor Azmawati Fauzi.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pembinaan lantai bawah (non-suspended ground slab) / Muhammad Amirul Shafiq Amran.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The steel reinforcement concrete piling works for 2 ½ storey bungalow at Simpang Kuala, Alor Setar Kedah / Muhamad Hilmi Azri Ismail.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Certificate of completion and compliance / Muhammad Firdaus Mohd Arif.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The method construction to build roof trusses / Muhammad Amirul Abdul Rahman.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pembinaan dinding kedap bunyi di pawagam / Mohamad Saufi Ismail.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Preliminary construction of reservoir water level control / Muhammad lkmal Ariff Azmee.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Micropiling and its fundamentals / Syed Ahmad Najib Syed Mohd Naim. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method statement of continuous foundation and detail of design / Ahmad Hakiman Mat Yusoh.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pembinaan asas pad dan asas jalur / Muhammad Hamdi Omar.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kotak acuan doka / Muhammad Razif Ismail.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Aluminium formwork system / Filzah Atikah Yusop.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pembinaan struktur bangunan berasaskan konkrit bertetulang / Nur Atirah Kamaruzaman.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Proses-proses tender / Noor Afzan Ismail.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kelewatan dan lanjutan masa / Nik Affifi Nik Ramli.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pembekalan konkrit siap bancuh ke tapak pembinaan: kajian kes Institut Latihan Perindustrian (ILP) Kuala Langat, Banting, Selangor / Muhidin Mohamed Zan.
(2003)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kelalaian pekerja di tapak bina / Muhammad Hafiz Mohd Fisol.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Struktur kerangka bumbung / Mohd Idzuan Salamom.
(2007)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pembinaan konkrit bertetulang/ Hazrol Nizam Hanapi.
(2005)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Raft foundation / Nudzul Aireena Zulkefli.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Roof construction / Najwa Asyila Kamal Shahrizan.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pre-contract in construction projects / Nur Fazzira Himsappikeri.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Building defects and repairing work for finishing / Mohamad Hafizzal Zulkifli.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah membaik pulih kecacatan pada konkrit menggunakan simen epoksi / Mohd Asraf Ayob.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pengurusan buruh di tapak bina / Anuar A Aziz.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kerja cerucuk 'micro piles' / Mohd Yafiz Abdul Aziz.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Industrialized building system on Health Office of Negeri Kedah / Norliyana Syahirah Muhamad Radhi.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The installation of aluminium top hung with fix glass window and aluminium sliding glass door / Mohamad Azuar Mohd Anuar.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Proses mendapatkan Sijil Perakuan Siap dan Pematuhan (CCC) / Nur Liyana Zakaria.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Building plan approval by local authority (MDPM) / Wan Mohamad Shahril Afiq Wan Abdul Fatah.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Construction of substructure / Mohamad Hakim Mohamad Hatta.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kecacatan bangunan: jenis, punca dan prosedur / Muhammad Hafeez Amran.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Half slab precast concrete / Nur Shazwana Misbahi.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Precast concrete staircase / Nuur Syifa Sahib.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pemasangan kekuda bumbung keluli / Nurul 'Ain Mohd Ghazali.
(2009)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Installation of Novec 1230 supression system / Mohd Shazali Che Lah.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pengeluaran Perakuan Pematuhan Siap (CCC) bagi projek perumahan di Tanjung Lumpur, Kuantan / Nor Syakila Nordin.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The criteria of the building plan approval by local authority: new project proposals plan / Hasnulhadi Ibrahim.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pemasangan bumbung / Ahmad Adzim Mohd Akhir.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Installation of roof main trusses / Ruzaini Abdul Rahman.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
OKU toilet construction / Muhamad Zahran Ahmad Daud.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kerja-kerja bumbung / Mohamad Adli Mohammad.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Prosedur sebelum, semasa dan selepas mendapat tender projek Universiti Sains Malaysia / Muhammad Nashrul Hafizh Nazri.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Wall construction / Zulkifli Jali.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Design and construction of steel jointing (welding) / Mohamad Najmuddin Hasri.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Building plan approval process / Muhammad Afiq Che Roha.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Sistem acuan konkrit besi / Mohamad Najmi Zahid Yahya.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Construction of cast in situ bored pile / Nurhamizah Md Anuar.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Intergrated project of management / Ahmad Dhiyauddin Ahmad Khair. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Faktor-faktor kelewatan projek / Nur Rasyidah Kamaruddin.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kecacatan pada bangunan / Nur Aisyah Zainal Abidin.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pemasangan kamera litar tertutup (CCTV) / Nurul Amalina Rashid.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Qlassic: Measurement procedure of quality level for finishes in building / Mohamad Ilham Shafie.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pelan perancangan kualiti projek (Besi dan konkrit) (PQP) / Ahmad Yazid Abu Samah.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Penggunaan 'spun pile' di Jambatan Sungai Kempas, Johor Bharu / Nurulafifa Mohd Yusop.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kerja-kerja pembinaan jalan lencongan dan sistem keselamatan / Nazif Ahmad.
(2005)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pembinaan dinding dan bumbung 'metal cladding' / Adnan Sabtu.
(2005)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Construction of concrete structure (raft foundation) / Noor Shafrina Samsuri.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Proses permohonan kelulusan pelan / Ahmad Zakhwan Muhammad Mazmillah.
(2008)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The installation of aluminium top hung with fix glass window and aluminium sliding glass door / Syahmi Fizuan Mohd Sofi.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Plastering work using pump / Muhammad Hazwan Miden.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Construction methods of sewage treatment plant / Mohd Shah Kimi Reduan Mohd Zaki.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Mivan formwork / Zamirul Azmer Zamri.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Floor finishes / Mukleiss Mohamed Zachariah.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Proses kelulusan perakuan siap dan pematuhan (CCC) / Nor Ashikin Hamdan.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Proses pemilihan kontraktor / Nur Hidayah Razali.
(2012)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Inspection defect / Muhammad Afif Aidid.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Ancillary works for proposal to build and complete a two-storey bungalow on Lot 315549, Mukim Hulu Kinta, 31400 Ipoh, Perak / Norasyikin Mahamad Ali.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
High Density Polyethylene (HDPE) / Siti Aminah Misman.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The important factor of construction site management: Case study of doubles storey bungalow project Darulaman Lakehome Phase 2 / Nadzirah Nasir.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Perbezaan antara Borang Kontrak 203A dan PAM 2006 / Siti Rohaya Mokhtar.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Keselamatan di tapak bina / Nor Farhana Surhan.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The construction of debris flow barriers / Muhammad Luqman Mohd Ali.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Structural works / Nor Suziana Mohamad.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Post-tensioned flat slab / Khairunissa Ahmad Zakuan.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Reinforced in-situ concrete drain / Nor Auni Saadiah Mohamad Ansor.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pemasangan longkang U / Mohd Nazrin Zahurin.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Preparation of document tender / Mohd Razif Mustafa.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Industrialised building system elements: Precast half slab, beam and column / Saifulhisham Mohamad Shaffiee.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Caisson construction / Amirul Syafiq Zainal Abidin.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The climbing tower crane for construction of a high rise building / Muhammad Zaid Rusli.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pengurusan tapak bina / Shairah Loman.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pengawasan kemajuan tapak / Alifah Mazrah Mohamad Arepin.
(2006)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Construction of reinforced concrete and Gabion retaining wall for a proposed of upgrading Kajang Silk Highway from UNITEN Interchange to UPM Interchange / Muhammad Aimi Adzmi.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Method of lock-up construction / Ahmad Zaidi Mohamed Anuar.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Process of tender document / Nur Hadirah Hussin.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Method of installation septic tank / Wan Muhammad Faiq Wan Ahmad.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The construction of upper floor slab / Noor Amirul Mahayudin.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pembaziran dalam sektor pembinaan / Mohd Raime Izane Mohd Rusli.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kaedah pembinaan bumbung curam / Mohd Shahrul Annuari Abd Maulud. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Lightweight steel roof trusses / Khalifah Hafizi Mohd Jamil.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Methods involved before and during tender evaluation process / Adlina Hailani.
(2013)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Pengukuruan dan pengiraan untuk tuntutan bayaran kemajuan kerja / Abdul Rasyid Ab Karim.
(2010)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Contract administration in construction / Muhammad Khairudin Mohd Nor.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Kerja-kerja tanah / Fatin Suhana Suhaimi.
(2008)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
UCO solid wall system / Muhammad Azim Anuar.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Installation of aluminium cladding / Mohamad Aqmal Mohamed Johar Fikri.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Endbearing pile: spun pile / Abdullah Zamzami Azaiz.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Concrete test / Nur Syafiqah Mardhiyah Mohammed Daud.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Construction method of scaffolding design / Nurul Syuhadah Atikah Shamsuddin.
(2015)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
General methods of pricing tender for a project of proposed to built a new market at Pulau Pangkor, Perak Darul Ridzuan / Intan Syafiza Haliza Mustafa.
(2014)
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
The construction of pad footing structure / Khairul Zuhair Arif Zaim. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Installation of double aluminium louvers with glass naco louvers / Mohamad Arif Mohd Nasir. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Project handover: On proposed design, construction, completion, commissioning of Mahallah LTAT at the International Islamic University Malaysia, Gombak, Selangor Darul Ehsan / Mohamad Hairul Asri Jamaludin. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building structure for double storey terrace house / Mohamad Razien Faiz Abdul Halim. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Causes of defect on wharf residence and methods of rectification / Nur Ain Jasmine Zafri. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method construction of swimming pool slab / Nurul Hayati Mohamad. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Tendering process / Muhammad Mawardi Masling. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Measurement for pad foundation and beam / Mohamad Daniel Adrian Zainodin. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of anchor vertical block / Muhamad lzzat lkhwan Zuhaimi. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of staircase at Genting Mall, Genting Highland / Ahmad Kamal Ezany Azizan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pad foundation / Aimi Azzahra Mahiazal. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Reduce Basis Method (RBM) formwork system / Anees Adilla Che Mohd Hashim. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Road construction / Rifky Farhan Ruazlizam. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Roof construction / Shahrizan Osman. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The installation of roof trusses / Muhammad Akmal Che Wan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Raft foundation / Noor Hafizah Abd Rahman. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Fabrication process of steel trusses for Matrade Exhibition Centre / Nurulhuda Jais. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Structural work of 8 storeys car park podium (Post Tension Method) / Faizatul Azlin Gani. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Bridge construction / Muhammad Zulfikaar Hariri Mazlan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of in-situ concrete beam / Muhamad Arif Baharim. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Precast box culvert-micro pile / Muhammad Radhi Abdul Talib. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Material wastage at construction site / Mohamad Muharjir Zakaria. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Quality assessment system in construction (QLASSIC) at PB Sentral and KP Perdana sites at Kuala Terengganu / Fatin Nabila Othman. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Substructure (piling system) / Muhamad Amirul Adli Mohamad Azman. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Piling test / Nurul Nor Hidayah Mat Zain. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pemasangan genting bumbung / Nurul Atiqah Mohd Anuar. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pengurusan buruh di tapak bina / Noraida Abdullah. (2009) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Kaedah pembinaan tempat letak kereta berbitumen / Mohamad Zamani Kamarudin. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pembaziran bahan binaan / Muhammad Faiz Che Ismail. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Sistem pengurusan keselamatan dan kesihatan pekerja binaan / Mazlynainie Ghazali. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pembinaan struktur kekuda bumbung jenis keluli / Ayu Raskina Rabudin. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Maintenance / Amir Luqman Umar. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Ground beam construction / Fairuz Ithnin. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Kaedah pembinaan sistem pasang siap di Universiti Malaysia Kelantan (UMT), Kampus Jeli / Dzul Hazwan Malizen. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pembinaan sistem saliran permukaan (surface drainage system) / Mohd Hafizi Mohamad Shukri. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method installation of air conditioning using split unit and casette unit / Nik Nasran Nik Lah. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Rectification work: Hacking for demolishing and preservation and its effect to environment / Mohammad Hamizan Mohd Puad. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Kaedah pemasangan penghawa dingin / Mohd Safwan Saari. (2008) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Keselamatan dan kesihatan di tapak pembinaan / Ahmad Tajuddin Zulkifli. (2011) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of soil nailing system at slope area / Muhammad Shah Redza Zamani. (2011) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pembasmian serangga perosak dalam industri pembinaan (anti-termite) / Mohd Huzairi Salgiman. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
IBS sistem konkrit pra-tuang: kajian kes bangunan tambahan pusat pameran dan multimedia OSH di lbu Pejabat NIOSH, Bandar Baru Bangi, Selangor / Meor Syahmi Meor Mohamed Aiyub. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Safety and health at construction site / Rabiatul Amira Alias. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Kerja-kerja tebus guna tanah di kawasan lombong / Lukman Hakim Azmi. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Drain closure: method and safety aspects / Ahmad Syahid Adnan. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Cerucuk gerek (bored pile) / Amir Hamzah Ismail. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Kaedah penanaman 'spun pile' / Awatif Mohd Radzi. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pengurusan bahan di tapak bina / Fadlyana Ishak. (2003) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Certificate of Fitness for Occupation (CFO) / Izatul Akma Ahmad. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Reinforcement concrete work on the ground beams and columns / Mohamad Fazli Zamzam. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method statement on testing of pile foundation / Mohamad Nazmi Ghumat. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Post contract final account / Mohamad Syafiq Asyraf Mohamad Shokri. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pembinaan kekuda bumbung dan pemasangan kekuda bumbung / Muhamad Nurfakiq Fauzi. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Kaedah penanaman cerucuk konkrit bertetulang untuk membina bangunan pejabat 4 tingkat di Universiti Teknologi MARA Shah Alam / Muhammad Ameerul Yacob. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Kecacatan bangunan semasa proses pembinaan / Muhammad Asyraf Kamaluddin Mazlan. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pengaruh alam sekitar dan pengurusannya di tapak bina / Asyraf Abdul Halim. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Design of building using AutoCAD / Muhammad Farhan Rusdi. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of cladding / Muhammad Hafiz Danial Razelan. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Kaedah pengurusan sumber di tapak bina / Muhammad Shahaidil Ami Nuzairi. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pengurangan air tanpa hasil / Muhammad Suhaili Fadzil. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of RC tower for elevated water tank / Nadiatul Nasuha M. Mazhan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Proses pemasangan kemasan bagi 1 unit rumah banglo 2 tingkat dipetak 1-6, PT 3244-PT3253, Seksyen 69 Mukim Guntong, Daerah Limbat, Jajahan Kota Bharu, Kelantan / Nor Diana Ibrahim. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method statement for earthwork / Nur Aina Akmal Mohd Noor. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pembinaan struktur bawah bangunan / Nur Syuhada Zainuddin. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Conventional slab construction / Nuraini Abdullah. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Perlantakan cerucuk konkrit bertetulang (R.C. Pile) untuk Masjid Batu 8, Kuantan Pahang / Ros Hidayu Harun. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pembinaan tasik sebagai kolam takungan / Siti Atiqah Abdul Aziz. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pemasangan paip sistem pembentungan / Siti Hodijah Ehwan. (2006) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Kaedah ikatan bata / Zulfikar Mohamed Raji. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Certificate of Completion and Compliance / Siti Solehah Hassan. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Defect on plastering and its method of rectification / Kamil Fahmi Sazili. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)