Installation of roof main trusses / Ruzaini Abdul Rahman

Abdul Rahman, Ruzaini (2015) Installation of roof main trusses / Ruzaini Abdul Rahman. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Abstract

This report, described the Installation Of Roof Main Trusses on construction site of 'Cadangan Merekabentuk Dan Membina 1 Blok Pusat Pameran Matrade 3 Tingkat Jalan Dutamas 2, Mukim Batu, Wilayah Persekutuan Kuala Lumpur'. This report was reported based on the observation and experience of five month at the construction project. The objective of this report is to identify the procedure of roof main trusses installation and to identify the problem of roof main trusses installation. Besides that, search more information using two method which is from primary data is from book and article and secondary data from internet. The company background will explain about the company where the practical training of students placed. It began with an introduction followed by objectives, information about companies and managers, organizational charts and concluded with a list of completed projects, some undergoing projects and appendix. This report fully explained about procedure installation of main trusses roof and problem and solution installation of main trusses. Next, in this report described about the equipment and process for installing the trusses and problem and solution.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 77207.pdf]
Text
77207.pdf
Download (20MB)
Indexing & Metrics