Items where Subject is "Roofing"

Group by: Creators | Item Type
Jump to: A | B | C | D | F | H | I | J | K | L | M | O | R | S | T | W | Y | Z
Number of items at this level: 64.

A

A study of waterproofing failures for flat roof and method of rectification / Mohd Hafizan Ab Razak. (2010) [Student Project] (Unpublished)

Roof construction at kem 4 Rejimen Renjer Diraja, Oran / Hazleeda Abd Halim. (2016) [Student Project] (Unpublished)

Kaedah pembinaan bumbung curam / Mohd Shahrul Annuari Abd Maulud. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

A study on traditional roof at Melaka village case study: Kampung Morten / Izzah Lieyana Abdul Aziz. (2019) Degree thesis, thesis, Universiti Teknologi MARA, Melaka.

Roof installation process using metal deck PU foam G28 Surau Taman Desa Seraya, Alor Setar / Muhamad Asyrof Abdul Halim. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Elevated shell platform: effects due to shell geometric / Azizah Abdul Nassir. (2019) [Student Project] (Unpublished)

Challenges and way forward for implementing green roof in construction industry in Sarawak, Malaysia / Nurul Nabilah Abdul Rahim ...[et.al.]. (2021) Journal of Smart Science and Technology, 1 (1): 4. pp. 40-47. ISSN 2785-924x

The method construction to build roof trusses / Muhammad Amirul Abdul Rahman. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of roof main trusses / Ruzaini Abdul Rahman. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Roof construction of single storey houses / Muhammad Hazim Abdul Suki. (2014) [Student Project] (Unpublished)

A study on flat roof construction in Malaysia / Azrul Hanafi Abdullah Sani. (2008) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Process of renovation work for roof of existing building (school) / Nooraizat Ahmad. (2018) Industrial Training. Universiti Teknologi MARA, Perak, Seri Iskandar, Perak. (Unpublished)

B

A study of dampness on flat roof at Heritage Mosque in Perak / Nur Asma’ Ul- Husna Baharuddin. (2016) [Student Project]

C

Comparative study between steel and timber roof trusses for medium span building / Che Suriani Che Said. (2007) Degree thesis, thesis, Universiti Teknologi MARA.

The installation of roof trusses / Muhammad Akmal Che Wan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

D

Flat roof waterproofing: comparison between polymer acrylic and modified bitumen in Malaysia climate / Muhammad Zulhusni Dahlan. (2021) [Student Project] (Unpublished)

Structural design process for prefabricated roof truss system in Malaysia / Rezali Dewa. (2015) Masters thesis, thesis, Universiti Teknologi MARA (UiTM).

Natural fibre roof / Veloo Doraisamy … [et al.]. (2017) In: Melaka International Intellectual Exposition (MIIEX 2007). Division of Research and Industry Linkages, Alor Gajah, Melaka.

F

Pembinaan kekuda bumbung dan pemasangan kekuda bumbung / Muhamad Nurfakiq Fauzi. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

H

The waterproofing process of reinforced concrete flat roof on terrace house at Teluk Intan, Perak / Nur Farah Aina Hairul Anuar. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Crack growth of fibre-reinforced plastic (FRP)/polymer mixed concrete (PMC) system (bonded by polyester resin) due to constant load/stress / Hasnol Harun. (2005) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Senstech Enterprise / Mohd. Zuhaidi Hashim... [et al.]. (2020) [Entrepreneurship Project] (Unpublished)

I

Maintenance management of roofing system for old shophouses / Mohd Ariff Ishak. (2010) Degree thesis, thesis, Universiti Teknologi MARA.

Costing of rainwater harvesting system for three types of houses in Seremban / Aida Liyana Ismail and Sayed Muhammad Aiman Sayed Abul Khair. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

Effect of using crushed concrete roof tiles as coarse aggregates on properties of concrete / Manaff Mohd Ismail, Hamidah Mohd Saman and Azmi Ibrahim. (2002) In: Prosiding Seminar Kebangsaan Sains,Teknologi dan Sains Sosial “Ke Arah Pembangunan Negara”, 27 dan 28 Mei 2002, Hotel Vistana, Kuantan, Pahang.

J

Energy performance of demonstrated building with Insulated roof and ceiling in tropical climate / Norzita Jaafar. (2009) [Student Project] (Unpublished)

K

Bio-roof material based on oil palm fibre / Julaida Kaliwon. (2016) PhD thesis, thesis, Universiti Teknologi MARA.

Roof construction / Najwa Asyila Kamal Shahrizan. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Maintenance of roof structure in high-rise residential flat buildings / Noorashikin Kamaludin. (2008) Degree thesis, thesis, Universiti Teknologi MARA.

The effectiveness of roof covering material in UiTM Shah Alam / Muhamad Firdaus Kamarudin. (2009) Degree thesis, thesis, Universiti Teknologi MARA.

Thermal analysis of composite materials for roofing / Muhamad Hanizam Kasah. (2002) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

L

Installation of standing seam roofing / Andryson Leonarld Laurence. (2021) [Student Project] (Unpublished)

M

Pemasangan struktur komponen konkrit pra-tuang / Ainur Fatheen Nadiha M. Hatta. (2012) Industrial Training. Universiti Teknologi MARA, Perak.

A study of the factor of waterproofing failure in building that locate in Ipoh, Perak Darul Redzuan / Mohamad Zul Amjad Md. Zulkifli. (2021) [Student Project] (Unpublished)

Roof of Galeri Muzium Bukit Kepong, Muar / Salasiah Mohamad. (2015) [Student Project]

Semi automatic moving roof / Nur Suziyana Mohamed Hazaruddin & Nurul Fara Nabila Mat Yunus. (2015) [Student Project] (Unpublished)

Construction of roof beam structure / Daeng Arqeelia Zaisarah Mohamed Seth. (2021) [Student Project] (Unpublished)

Kerja-kerja bumbung / Mohamad Adli Mohammad. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pemasangan bumbung / Ahmad Adzim Mohd Akhir. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pemasangan genting bumbung / Nurul Atiqah Mohd Anuar. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pemasangan kekuda bumbung keluli / Nurul 'Ain Mohd Ghazali. (2009) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Lightweight steel roof trusses / Khalifah Hafizi Mohd Jamil. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Test houses for roof thermal performance testing / Badrul Hisham Mohd Noor, Azni Zain-Ahmed and Nasharudin Sulaiman. (2008) In: Proceedings STSS 2008, 3-4 June 2008, M.S. Garden Hotel, Kuantan Pahang.

O

Kaedah pemasangan bumbung jenis keluli ringan / Muhammad Haziq Osman. (2009) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Roof construction / Shahrizan Osman. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

R

Pembinaan struktur kekuda bumbung jenis keluli / Ayu Raskina Rabudin. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of roof beam / Muhamad Kamil Ramle. (2020) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Crack growth of fiber-reinforced plastic (FRP)/polymer mixed concrete (PMC) system (bonded by epoxy resin) due to constant load/stress / Mohd Yusri Ramlee. (2005) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

The work of repairing damages roof and trusses structure and other related work at Pusat Kokurikulum Pejabat Pendidikan Lama, Hulu Terengganu, Terengganu / Nur Ainun Izzati Ramli. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

Roof sprinkler cooling system / Muhammad Rafiq Roslan & Mohd Nazren Abd Wahab. (2015) [Student Project] (Unpublished)

Application and maintenance of skylight roof at public areas and commercial building / Mohd Rizal Rosli. (2009) [Student Project] (Unpublished)

Timber roof trusses installation process, Pasar Paka, Dungun / Muhamad Arif Roslin. (2016) [Student Project] (Unpublished)

S

A discussion on methodologies in identifying the maintenance criteria of green roof in high-rise buildings / Shafikah Saharuddin ... [et al.]. (2021) In: Virtual Go-Green: Conference and Publication (V-GoGreen 2020), 29-30 September 2020, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.

Struktur kerangka bumbung / Mohd Idzuan Salamom. (2007) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Sustaining green roof through maintenance practice in high rise residential building in Shah Alam / Hamnah Farohiyyah Sazali. (2014) [Student Project] (Unpublished)

Installation of roof trusses / Nurin Jazlina Shaiful Zaman. (2021) [Student Project] (Unpublished)

The design of the roof of a mosque and how it affects thermal comfort / Mohamed Danial Sharom and Izzat Anuar. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

T

A study on factors of flat roof defects and the effectiveness maintenance strategies in perspective of public work department / Tengku Hasmaliza Tengku Hussin. (2015) [Student Project] (Unpublished)

W

Kaedah pembinaan bumbung / Mohamad Shahrul Waizan Wahab. (2006) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Y

Breathable & interlock-able roof tile: natural ventilation in tropical humid architecture / Rostam Yaman … [et al.]. (2014) In: IIDEX 2014: invention, innovation & design exposition. Research Innovation Business Unit, Shah Alam, Selangor, p. 32. (Submitted)

Z

Pemilihan bahan-bahan kemasan siling bangunan dan kesannya ke atas proses penyelenggaraan / Siti Asiah Zainal. (2003) Degree thesis, thesis, Universiti Teknologi MARA.

Tensile strength class system for Malaysian hardwoods according to European standards EN 384 and EN 408 / Nurul Izzatul Lydia Za‘Ba. (2019) PhD thesis, thesis, Universiti Teknologi MARA (UiTM).

Installation of roofing at Taman Semarak Nilai, Negeri Sembilan / Putera Mohamad Zubir. (2016) [Student Project]

Method of roof construction / Nurafiqah Nadhirah Zulmat. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

This list was generated on Fri Apr 19 09:09:41 2024 UTC.