The design of stay cable bridge at Pengkalan Gawi, Tasik Kenyir, Terengganu

Nawi, Muhammad Syamsul Irwan (2019) The design of stay cable bridge at Pengkalan Gawi, Tasik Kenyir, Terengganu. Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)
Abstract

This practical training report describes the experience gained during five months practical training period undertaken at BBR Constructions Systems (M) Sdn Bhd. The purpose of this report is to discuss about the design of stay cable bridge. This report was conducted at Pengkalan Gawi, Tasik Kenyir. The objective of this report is to study the design of Stay Cable Bridge at Pengkalan Gawi to Pulau Poh and to identify the advantages of Stay Cable Bridge compared to other conventional bridge. This project almost 89% complete.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 120172.pdf]
Text
120172.pdf
Download (1MB)
Indexing & Metrics