Items where Subject is "Details in building design and construction.Including walls, roofs"

Group by: Creators | Item Type
Jump to: A | B | C | D | E | G | H | I | J | K | L | M | N | O | R | S | T | U | V | W | Y | Z
Number of items at this level: 274.

A

Interlocking brick / Azri Zulhakim Ab Aziz. (2021) [Student Project] (Unpublished)

A study on sport facilities in IPTA (UiTM, UM and UPM) / Noor Hidayah Ab. Malek. (2005) Degree thesis, thesis, Universiti Teknologi MARA.

Construction of clay brickwall / Amirul Abd Gani. (2021) [Student Project] (Unpublished)

Roof renovation process / Nur Aliah Abd Hadi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)

Kaedah pembinaan struktur kawalan jenis "radial gate" / Siti Salwa Abd Hamid. (2009) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Proposed new interior design of 4x4 centre for 4x4 Shoppe & Service Sdn Bhd at Lot 211, Seksyen 24, Jalan Empayar Off Persiaran Sultan Ibrahim KU1, Mukim Klang, Klang Bandar Diraja, Daerah Klang, Selangor Darul Ehsan / Muhammad Arif Abd Latif. (2012) [Student Project] (Unpublished)

The effect of Concrete Roof Tile Composite (CRTC) using Sayong clay and rice straw fibre on the flexural strength / An Nisha Nur Welliana Abd Rased and Nurhidayah Samsul Rijal. (2021) In: Virtual Go-Green: Conference and Publication (V-Go Green 2020), 29-30 September 2020, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.

The capability of class f contractor towards implementing IBS / Nurul Huda Abd Samad. (2010) [Student Project] (Unpublished)

Building condition survey of Sri Cemerlang Bungalow House / Muhammad Hazim Abdul Ghafar. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Roof installation process using metal deck PU foam G28 Surau Taman Desa Seraya, Alor Setar / Muhamad Asyrof Abdul Halim. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Interior floor finishes preferences for Malaysian houses / Nurrajwani Abdul Halim. (2022) PhD thesis, thesis, Universiti Teknologi MARA.

Interior floor finishes preferences of residents in Klang Valley : a preliminary survey / Nurrajwani Abdul Halim, Siti Norlizaiha Harun and Azizul Azli Ahmad. (2018) In: 3rd International Conference on Rebuilding Place (ICRP2018), 13-14 September 2018, Impiana Hotel, Ipoh, Perak, Malaysia. (Unpublished)

Interlock installation (floor finishes) / Aida Syuhada Abdul Manap. (2021) [Student Project] (Unpublished)

Waterproofing materials for flat roof / Ahmad Syukri Abdul Rahman. (2008) Degree thesis, thesis, Universiti Teknologi MARA.

A conservation of heritage timber building in Malaysia “Masjid Lama Kampung Kuala Dal”, Kuala Kangsar, Perak / Robiah Abdul Rashid … [et al.]. (2014) In: IIDEX 2014: invention, innovation & design exposition. Research Innovation Business Unit, Shah Alam, Selangor, p. 40. (Submitted)

Method of construction synthetic field / Ain Nurul Ashikin Abdul Rasid. (2014) Industrial Training. Universiti Teknologi Mara, Perak.

Tender: soil investigation / Addam Abdul Razak. (2021) [Student Project] (Unpublished)

The challenges in choosing cement board IBS concept to reduce the cost of a building compare to the brick wall / Muhammad El-Husairi Abdul Roni. (2021) [Student Project] (Unpublished)

Roof construction of single storey houses / Muhammad Hazim Abdul Suki. (2014) [Student Project] (Unpublished)

A study of thermal performance of medium cost terraced houses at Shah Alam, Selangor / Md Hanafiah Amin Abdullah. (2002) Degree thesis, thesis, Universiti Teknologi MARA.

Tower B, Menara Bata PJ Trade Centre Damansara / Muhammad Syakir Abdullah ... [et al.]. (2015) [Student Project]

Singgora tiles : perception of the community in Kota Bharu, Kelantan / Nor Hidayah Abdullah, Rodiah Zawawi and Zuraini Md Ali. (2015) Built Environment Journal (BEJ), 12 (1). pp. 11-17. ISSN 1675-5022

Review and design of prefabricated building / Zulfakar Abdullah dan Munawar Mohamed. (1988) [Student Project] (Unpublished)

The used of Acrylonitrile-Butadiene Styrene- (ABS) pipe in cold water supply system / Muhammad Arif Abu Hassan. (2008) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Quotation process / Nurul Nabila Aqera Abu Samah. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Safety features of ablution area in Masjid Baling, Kedah / Nur Nabilah Afini Hafizi. (2022) [Student Project]

Kaedah pembuatan konkrit siap bancuh di kilang / Afiq Faiz Ahmad. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Waterproofing system for shop houses / Aisyah Maheerah Ahmad. (2017) [Student Project]

Installation of chain-link fencing / Annas Shahimi Ahmad. (2021) [Student Project] (Unpublished)

Certificate of Fitness for Occupation (CFO) / Izatul Akma Ahmad. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Process of renovation work for roof of existing building (school) / Nooraizat Ahmad. (2018) Industrial Training. Universiti Teknologi MARA, Perak, Seri Iskandar, Perak. (Unpublished)

Sistem penilaian pengalihudaraan untuk pembangunan perumahan lestari (Ventilation Flow Evaluation System for Sustainable Housing Development) / Nur Azfahani Ahmad … [et al.]. (2019) Jurnal Inovasi Malaysia (JURIM), 2 (2). pp. 55-70. ISSN 2600-7606

The facilities for person with disabilities in Public Hospital at Perak / Nurul Ainaa Afifah Ahmad Basri. (2021) [Student Project] (Unpublished)

Prioritising significant characteristics of green roof systems in Malaysia urban area / Danish Hakim Ahmad Fadli and Shafikah Saharuddin. (2023) In: UNSPECIFIED.

Tiles installation at 3-storey bungalow / Nurfarhana Ahmad Fauzi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The most preferred building transport between escalator and elevator among teenager / Mohammad Haszmeer Ahmad Kamal. (2014) Degree thesis, thesis, Universiti Teknologi Mara (UiTM).

Prosedur pembinaan sistem perparitan kotak pembentung / Muhammad Fahmi Ahmad Kamarudin. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Satisfaction of resident regarding lift system at high rise residential building / Ahmad Dhiyauddin Ahmad Khair. (2021) [Student Project] (Unpublished)

Effects of roof construction quality to the maintenance works / Muhamad Zamir Khairi Ahmad Khairani. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Application of finishes in Pasar Payang / Ahmad Naqiuddin Ahmad Ramzi. (2021) [Student Project] (Unpublished)

Installation of floor tiles finishes / Muhammad Aiman Haziq Ahmad Rizal. (2021) Industrial Training. Universiti Teknologi MARA, ,Perak. (Submitted)

Kaedah pengubahsuaian bangunan: kajian kes bangunan Puduraya / Muhammad Ammar Ahmad Zahrol. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Floor finishes: Installation of tile flooring / Mohamad Nabil Fitri Ahmad Zamali. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The important of space planning in facilities management / Siti Rulhajar Alias. (2009) Degree thesis, thesis, Universiti Teknologi MARA.

Proposed new design sheme for MAC Confinement Baby Care Centre at No 1-1, 2, 3, 4 Jalan Wangsa Delima 13, D’Wangsa Link, Wangsa Maju, Kuala Lumpur / Noor Azayani Alim. (2008) [Student Project] (Unpublished)

Pembinaan lantai bawah (non-suspended ground slab) / Muhammad Amirul Shafiq Amran. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of porcelain floor tile finishes / Mohamad Hairi Daniel Arba'i. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Study of trend facilities in the shopping complexes / Khairul Nizam Arshad. (2003) Degree thesis, thesis, Universiti Teknologi MARA.

Super structure / Sufian Ashari. (2017) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Superstructure for double storey semi – detached house / Azri Asri. (2018) [Student Project]

Project handover: On proposed design, construction, completion, commissioning of Mahallah LTAT at the International Islamic University Malaysia, Gombak, Selangor Darul Ehsan / Mohamad Hairul Asri Jamaludin. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Floor finishes at ablution areas in Masjid Sultan Iskandar and Masjid Al-Bukhari in Johor, Malaysia / Zuhanis Atan and Izzat Anuar. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

Endbearing pile: spun pile / Abdullah Zamzami Azaiz. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Wall installation (Caspia 2 – Puncak Iskandar) / Mohd Alif Aiman Azemi. (2016) [Student Project]

Daylighting technology for energy efficiency and thermal comfort for Wilayah Mosque in Kuala Lumpur / Ahmad Zahari Azizan. (2002) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Material management in high rise building / Muhammad Amar Adam Azlan and Nadira Ahzahar. (2023) In: UNSPECIFIED.

Proposed upgrading of Lumut Tourist Information Center for Ministry of Tourism Malaysia at Jalan Sultan Idris Shah, 32200 Lumut, Perak / Nor Amirah Imilia Azlan Samudin. (2011) [Student Project] (Unpublished)

Space inventory / Afiq Haziq Azmi. (2015) [Student Project] (Unpublished)

Building decay and presence of fungus in dwellings and its effects to the occupants in Tai Kwong Mansion, Brickfields / Alia Azmi. (2011) [Student Project] (Unpublished)

Method of wall plastering / Fatin Nursyuhada Azmi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)

Photocatalytic precast concrete wall / Muhammad Syahzuwan Azmi and Mohamed Ezad Hafez Pahroraji. (2023) In: UNSPECIFIED. (Submitted)

A review on thermal comfort in educational buildings of Southeast Asia Region / Nurul Azreen Azmi, Asniza Hamimi Abdul Tharim and Mohamad Zaki Yusof. (2021) In: Virtual Go-Green: Conference and Publication (V-GoGreen 2020), 29-30 September 2020, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.

Innovation on insulation material for a container house / Siti Nursarah Aznam. (2021) [Student Project]

Construction work: Steel framing system / Fauzan Aizat Azri. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

B

Immigration building / Mohamad Aziz Izzuddin Baharom... [et al.]. (2015) [Student Project]

Method installation of fencing works / Muhammad Shahrul Syazwan Bajuri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Redesign of kiosk spaces of Batu Gajah Wet Market towards new norms / Anis Syaziyah Basharudin. (2021) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

C

Perbadanan Nasional Berhad Tower 7 Avenue 7 Bangsar South Kuala Lumpur / Mohd Alif Che Azmi ... [et al.]. (2015) [Student Project]

Palace of Justice (POJ) Putrajaya / Amy Ezrina Che Man ... [et al.]. (2015) [Student Project]

Oil Palm Empty Fruit Bunch Fibre (OPEFB) in thermosetting polymer composite / Ahmad Afham Che Mohd Ruzaidi and Normila Ahmad. (2023) In: UNSPECIFIED.

D

Flat roof waterproofing: comparison between polymer acrylic and modified bitumen in Malaysia climate / Muhammad Zulhusni Dahlan. (2021) [Student Project] (Unpublished)

Kajian keselamatan pekerja dalam melakukan kerja penyelengaraan bangunan komersil / Johari Dugel. (1999) Degree thesis, thesis, Universiti Teknologi MARA.

An enhancement of home safety grilles in preventing property crimes. Case study: Shah Alam, Selangor / Mohd Norhan Dulkahar and Erwin Rezasyah. (2012) [Research Reports] (Unpublished)

E

Replacement of floor finishes from carpet to tiles at Akademi Audit Negara, Bandar Enstek, Nilai / Muhammad Nur Amin Effendi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

G

Current scenario on illegal renovation in low-cost stratified properties in Klang valley and it impacts / Suraya Ghani. (2013) [Student Project] (Unpublished)

H

Wall constructions (load bearing wall) / Mohamad Nor Fakhrurrazi Hadzir. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The challenges of facilities management for pondok institution in Malaysia / Muhammad Shahrol Hafiz Ibrahim, Yuhainis Abdul Talib and Nor Aini Salleh. (2022) In: Virtual Go Green: Conference and Publication (v-Gogreen 2021) “Rethinking Built Environment: Towards a Sustainable Future” 29th-30th September 2021, 29 - 30 September 2021, Universiti Teknologi MARA, Cawangan Perak.

Smart Building Structure / Hasrul Halimoon. (2021) In: UNSPECIFIED.

Site monitoring at Dataran Warisan (Installation of paver and pebble wash) / Mohamad Asyraf Hamid. (2016) [Student Project]

Kajian mengenai kerosakan struktur kayu (rumah Melayu tradisional) / Mohd Sukaimi Hamzah. (2000) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Assessment of butt joint positions on dry board in PSSDB wall panels with window opening / Prof. Madya Ir. Hjh. Siti Hawa Hamzah, Yong Chua Bon and Goh Ching Hua. (2005) [Research Reports] (Unpublished)

The defect of pitch roof / Siti Fatimah Harun. (2014) Industrial Training. Universiti Teknologi MARA, Perak.

Design and construction of steel jointing (welding) / Mohamad Najmuddin Hasri. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Towards a modern bus terminal (Kota Bharu Station as study case) / Salmiah Husain. (2002) Degree thesis, thesis, Universiti Teknologi MARA.

I

Analisa perbandingan bangunan pusat membeli-belah di Kuala Lumpur / Kamsiah Ibrahim. (1984) [Student Project] (Submitted)

Fundamentals of entrepreneurship (ENT300) : case study on De’ Kraf Fraternitas / Mohd Khairi Ibrahim … [et al.]. (2011) [Entrepreneurship Project] (Unpublished)

Numerical investigation on the effect of building overhang on the flow within idealized two dimensional Street Canyon / Muhammad Fatih Ibrahim. (2022) Masters thesis, thesis, Universiti Teknologi MARA (UiTM).

Visual aesthetics of bamboos woven motifs and patterns in Malay architecture within northern Malaysia / Mariam Idris. (2017) Masters thesis, thesis, Universiti Teknologi MARA (UiTM).

The installation of waterproofing system / Elina Ilias. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

The construction of tie-back earth retaining structures / Muhammad Izham Irwan. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Costing of rainwater harvesting system for three types of houses in Seremban / Aida Liyana Ismail and Sayed Muhammad Aiman Sayed Abul Khair. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

Kaedah pembinaan dinding kedap bunyi di pawagam / Mohamad Saufi Ismail. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Risk on design and build for construction project faced by developer / Muhammad Syakirin Ismail. (2003) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Wall construction / Nazrul Ikwan Ismail. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Finishing work case study: double storeys terrace at Laman Annur, Panji, Kota Bharu / Noor Aniza Ismail. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Accessibility for Person With Disabilities (PWDs) at public transportation in KTMB Perak / Nurul Najwa Suhadah Ismail. (2021) [Student Project] (Unpublished)

J

The construction method for staircase and floor slab / Atiqah Wajihah Jaffri. (2021) [Student Project] (Unpublished)

Cadangan merekabentuk ruang dalaman, butik sukan Adidas, di Lot G 19B, kompleks membeli belah Ipoh Parade, Jalan Sultan Abdul Jalil, Greentown, 30450, Ipoh, Perak. / Ahmad Jalani Jalmahar. (2005) [Student Project] (Submitted)

Construction and maintenance of membrane roof covering / Ahmed Daniel Jamil. (2008) Degree thesis, thesis, Universiti Teknologi MARA.

Asaka Construction Company: Cadangan membina banglo 2 tingkat Lot 59, Jalan Kurt Donald, Cahaya Masai, 81750 Masai, Johor / Mohd Afif Aiman Jamil ... [et al.]. (2016) [Student Project] (Unpublished)

Types of waterproofing system / Syahida Jamil. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

The student’s acceptance level of smart door lock system implementation in public university hostel / Muhammad Arif Ja’afar and Zuraihana Ahmad Zawawi. (2023) In: UNSPECIFIED.

Proposed interior new design of theme café at No.32, 32A & 32B, Jalan Plumbum Q7/Q, Seksyen 7, 40000 Shah Alam, Selangor Darul Ehsan for Mat Salai Sdn Bhd / Mohamad Haniff Johar. (2012) [Student Project] (Unpublished)

Kaedah pemasangan kemasan lantai jenis kayu laminat / Muhammad Azri Johari. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The procedure of post- tensioning work (prestressed beam) / Akmal Zuhri Joperi. (2021) [Student Project] (Unpublished)

Application of formwork systems for lot 1881 & 1882 at Mont Kiara / Benedict Sandin Joseph Garan. (2015) [Student Project]

Menara Seri Wilayah, Putrajaya / Mohd Faiz Juhari ... [et al.]. (2018) [Student Project]

Zon keselesaan terma bagi siswa dan siswi di Institut Teknologi MARA / Patrick Juking, Rizal Omar dan Yusaini Samsudin. (1996) [Student Project] (Unpublished)

A study on maintenance mosque / Nur Ashikin Jusoh @ Yusof. (2010) Degree thesis, thesis, Universiti Teknologi MARA.

K

Bio-roof material based on oil palm fibre / Julaida Kaliwon. (2016) PhD thesis, thesis, Universiti Teknologi MARA.

Construction management Qlassic assessment at Idaman Lavender 2 / Nur Khairunnisa Kamal. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)

Building design effect relationship to maintenance / Nadia Kamaruddin. (2008) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Kaedah pembinaan tempat letak kereta berbitumen / Mohamad Zamani Kamarudin. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

A study on facilities management in dairy farm building / Ruzailikha Kamarulzaman. (2008) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Decoration in the interior of mosque : a review of current literature / Norhayati Kassim, Norashikin Abdullah and Mohd. Zafrullah Haji Mohd. Taib. (2012) In: The 9th Regional Symposium of the Malay Archipelago, 11-12 December 2012, Al Khawarizmi Lecture Hall, UiTM Perak.

Brickwall construction for fence / Khairul Daniel Haiqal Khairul Azam. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)

L

Installation of standing seam roofing / Andryson Leonarld Laurence. (2021) [Student Project] (Unpublished)

M

Construction of RC staircase for fire exit route at Petronas Research Sdn Bhd, Bangi / Muhammad Badri Maarof. (2017) [Student Project]

The construction of upper floor slab / Noor Amirul Mahayudin. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Super absorbent flood barrier for residential / Muhammad Nazhdmi Fakhri Majalan and Raja Nurulhaiza Raja Nhari. (2023) In: UNSPECIFIED.

Kayangan Jubin Sdn Bhd / Fa’ezah Mamat...[et al.]. (2007) [Entrepreneurship Project] (Unpublished)

Proposed upgrading and new design for Restaurant Satay Kajang Haji Samuri, Tingkat 1, Bangunan Dato Nazir, Jalan Kelab, 4300 Kajang, Selangor Darul Ehsan / Farah Ayuni Marhalim. (2009) [Student Project] (Unpublished)

Installation of tiling works in a building case study at Almyra Residence Bandar Putra Mahkota Bangi, Selangor / Nor Syamimi Mat. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

The architecture of Perak Traditional Malay Roof Houses (PTMRH) in the year of 1820-1940 : a chronological analysis of the arabesque types on wall of rumah ibu / Norhasandi Mat ... [et al.]. (2012) In: The 9th Regional Symposium of the Malay Archipelago, 11-12 December 2012, Al Khawarizmi Lecture Hall, UiTM Perak.

Developing assessment rating tool on authenticity in adaptive reuse of heritage building in Malaysia / Hasni Suryani Mat Hasan. (2021) PhD thesis, thesis, Universiti Teknologi MARA.

Building structure / Muhammad Nabihan Zahin Mat Nasir. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method construction of building foundation / Muhamad Fariz Mat Rodi. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

Development of underground structure case study: additional car parking space at Sogo complex / Nur Syaimira Mat Rosli. (2010) [Student Project] (Unpublished)

The effectiveness of sun shading device for office tower in Malaysia / Zarina Mat Sapri. (2001) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Method statement of continuous foundation and detail of design / Ahmad Hakiman Mat Yusoh. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Process documentation and method installation of aluminium strip ceiling / Muhammad Aizat Ma’amor. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of cast in situ bored pile / Nurhamizah Md Anuar. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The potential of polyurethane foam insulation in roof maintenance / Nur Amirah Damia Md Nasser. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

Report of proposed new design for the Actors Studio Academy of Performing Arts at No.18, Section 11/1, Jalan University, 47200, Petaling Jaya, Selangor Darul Ehsan / Nadiah Md Saad. (2006) [Student Project] (Unpublished)

Laporan cadangan merekabentuk dalaman pejabat baru Wirazone Sdn Bhd di aras LG, Blok D, Plaza Sentral, Kuala Lumpur Sentral, 54700 Kuala Lumpur / Siti Nadiah Md Yusof. (2009) [Student Project] (Submitted)

Delay in school project in Lembah Klang / Hasniza Md. Kasa. (2005) Degree thesis, thesis, Universiti Teknologi MARA.

Plastering work using pump / Muhammad Hazwan Miden. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Creative Plaster Ceiling / Felix Moduin ... [et al.]. (2011) [Entrepreneurship Project] (Unpublished)

Method construction of swimming pool slab / Nurul Hayati Mohamad. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Laporan cadangan rekabentuk dalaman perpustakaan kanak-kanak di PT 861, Fasa 6A Taman Pauh Jaya Jalan Baru, 13700 Seberang Perai Tengah Pulau Pinang / Noor Hidayah Mohamad Akhir. (2006) [Student Project] (Unpublished)

Installation of brickwall for Spice Hotel on Jalan Tun Dr Awang , Mukim 12 Daerah Barat Daya Pulau Pinang / Mohamad Irwan Mohamad Azlan Shah. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Bricklaying process in construction site / Hanis Wahidah Mohamad Dashuki. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of UCO solid wall / Mohamad ‘Izzuddin Mohamad Taib. (2017) [Student Project]

Construction of surface drainage / Alif Kamal Mohamad Zamros. (2021) [Student Project] (Unpublished)

Kecatatan pada jubin seramik / Muhamad Yusran Mohamat Yatim. (1996) Diploma thesis, thesis, Universiti Teknologi MARA.

Substructure work for project of single storey terraced houses at Mukim Rompin, Daerah Rompin, Pahang / Ernie Nurlela Mohamed. (2015) Industrial Training. Universiti Teknologi MARA, Perak.

Build then sell and sell then build on building quality / Mansor Mohamed. (2010) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

The impact of COVID-19 and construction business survival strategies: a review / Nur Hidayah Mohamed and Musmuliadi Kamaruding. (2023) Journal of Sustainable Civil Engineering & Technology (JSCET), 2 (1): 1. pp. 1-7. ISSN 2948-4294

Influence of lighting and colour usage in higher education, a case study of an architectural studio / Nabilla Ilyana Mohamed Amin and Fazidah Hanim Husain. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

Installation of aluminium cladding / Mohamad Aqmal Mohamed Johar Fikri. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah ikatan bata / Zulfikar Mohamed Raji. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Transkrip wawancara bersama Encik Hassan Bin Yaacob Pembantu Tadbir di Pejabat SUK (Setiausaha Kerajaan), Kelantan / Azilah Mohamed Zali and Wan Noor Aziela Isma Wan Zarilla. (2019) [Oral History] (Submitted)

Pembekalan konkrit siap bancuh ke tapak pembinaan: kajian kes Institut Latihan Perindustrian (ILP) Kuala Langat, Banting, Selangor / Muhidin Mohamed Zan. (2003) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Proposed new interior design of Lambretta Mazza Centro for Selangor Lambretta Club at 176, Jalan Raja Abdullah, 50300 Kuala Lumpur / Fairuz Aimi Mohammad Azmi. (2010) [Student Project] (Unpublished)

Analisa reka bentuk tingkap tradisional dan hubungannya dengan prinsip islam di rumah menara Yaman, ‘Old City of Sana’a’, Yaman / Abdul Hamid Mohammed ... [et al.]. (2012) In: The 9th Regional Symposium of the Malay Archipelago, 11-12 December 2012, Al Khawarizmi Lecture Hall, UiTM Perak.

Concrete test / Nur Syafiqah Mardhiyah Mohammed Daud. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kecacatan fasad luar bangunan di iklim panas dan lembap dengan penumpuan khusus kepada bangunan-bangunan sekitar Lembah Klang / Ghazali Mohd Amin. (1996) [Student Project] (Unpublished)

Kitchen electrical appliances design and its influences to the consumer lifestyle / Mohd Hamidi Adha Mohd Amin. (2014) Masters thesis, thesis, Universiti Teknologi MARA (UiTM).

The installation of aluminium top hung with fix glass window and aluminium sliding glass door / Mohamad Azuar Mohd Anuar. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pemasangan lantai kayu / Mohamad Asrul Nizam Mohd Asari. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The satisfaction of natural ventilation in residential building / Farrah Nadhirah Mohd Azlan. (2021) [Student Project] (Unpublished)

Finishing work / Harris Shamshuri Mohd Fauzi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kerja-kerja struktur atasan (superstructure) / Mohammad Najib Mohd Hashim. (2008) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of RC frame / Mohammad Huzairi Mohd Husni. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Floor finishing (installation of ceramic tiles) / Aldrianna Mohd Kamal. (2021) [Student Project] (Unpublished)

Revolutionizing quantity surveyor roles in high-rise projects: the BIM implication / Fariesya Mohd Khaizal and Siti Nur Aishah Mohd Noor. (2023) In: UNSPECIFIED.

Brickwall construction / Intan Najiha Mohd Latif. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of ceramic tiles / Hidayana Husna Mohd Najid. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Serangan agen biologi ke atas struktur bumbung kayu curam / Siti Nurul Asma’ Mohd Nashruddin. (2008) [Student Project] (Unpublished)

Installation of double aluminium louvers with glass naco louvers / Mohamad Arif Mohd Nasir. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of floor finishes / Nurul Izzah Mohd Nawawi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kajian mengenai penggunaan kayu di bawah Peruntukan Undang-Undang Kecil Bangunan Seragam 1984 di dalam industri perumahan di Malaysia / Md. Arif Fabillah Mohd Nor. (1995) [Student Project] (Unpublished)

Construction of rubble pitching wall (SRA Sungai Tangkas) / Muhammad Afif Mohd Nor. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Inspection of quality standard specifications for building works / Norismanizam Mohd Nor. (2017) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Laporan cadangan merekabentuk dalaman kedai creative, NO.39 Jalan Sultan Azlan Shah Utara Taman Ipoh Selatan, 31400 Ipoh, Perak Darul Ridzuan. / Mohd Syukri Mohd Nordin. (2005) [Student Project] (Submitted)

A feasibility study on rainwater harvesting system for mosque in Perak Tengah / Muhammad Amirul Asraf Mohd Nordin and Nur Azfahani Ahmad. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

Bored pile construction / Siti Arfah Mohd Radzuan. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Tierra Crest Petaling Jaya Selangor Darul Ehsan / Ahmad Rashdan Mohd Rizan ... [et al.]. (2015) [Student Project] (Unpublished)

Maintenance management of public building managed by Subang Jaya Municipal Council (MPSJ) / Noor Aqmar Mohd Rusly. (2009) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Transkrip wawancara bersama Dr Mohammed Safaruddin Bin Ismail / Muhammad Harif Fazillah Mohd Said and Mohammad Nor Rafiq Rozimi. (2019) [Oral History] (Submitted)

Installation of waterproofing system at Recreation Centre, 45th floor, Menara Maybank / Muhammad Farhan Mohd Sofi. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

The installation of aluminium top hung with fix glass window and aluminium sliding glass door / Syahmi Fizuan Mohd Sofi. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Concrete ground floor slab construction / Muhammad Razif Dinnie Mohd Tarmizi. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Hot water supply / Anisya Sabilla Mohd Taufiq Edward. (2021) [Student Project] (Unpublished)

Effectiveness of adaptation of Traditional Malay House concept into modern in term of ventilation system / Ahmad Faris Mohd Yajid. (2021) [Student Project] (Unpublished)

Method of wall construction / Ahmad Firdaus Mohd Yatim. (2021) [Student Project] (Unpublished)

The comparison of handicaps facilities in local authorities building in Klang valley / Mohd Faridh Mohd Yunus. (2004) Degree thesis, thesis, Universiti Teknologi MARA.

Wisma Naza Building Sungai Besi Kuala Lumpur / Muhammad Zulhilmi Mohd Yusof ... [et al.]. (2015) [Student Project] (Unpublished)

Hotel Taiping Perdana, Taiping, Perak / Muhammad Aizad Mohd Zain ... [et al.]. (2016) [Student Project]

Study of solid waste disposal system in high-rise buildings between conventional system and Centralize Vacuum System (CVS) / Ahmad Anwar Mohd Zaki. (2009) [Student Project] (Unpublished)

Science & Technology Tower 1, UiTM Shah Alam / Michelle Majalap Mojiun ... [et al.]. (2013) [Student Project]

Method of construction for ground beam / Muhammad Ridzuan Muhamad Ali. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The installation of door and window / Muhamad Haikal Muhamad Zaidi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017.

Inspection process and procedure in architecture work on the Residence Condominium, Bukit OUG, Kuala Lumpur / Marni Ainin Syahirah Muksain. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Installation of waterproofing / Nurul Atikah Mursidi. (2018) [Student Project] (Unpublished)

N

Supervisor M&E at the site / Ahmad Haziq Nafis Hasram. (2021) [Student Project] (Unpublished)

Menara Umno, Pulau Pinang / Mohd Khaizuran Aqil Naharuddin ... [et al.]. (2015) [Student Project]

Maintainability of design and facilities for Persons With Disabilities (PWD) in education building (Library PTAR UiTM Perak) / Nurul Najah Nasrul. (2021) [Student Project] (Unpublished)

How lighting intensity influence diners’ communication performance in restaurant : a comparative study between Jibril, SS15 Subang Jaya and Ink Library, Eco Grandeur / Batrisyia Nazri and Farid Al Hakeem Yuserrie. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

The relation between maintenance and safety of tower crane on construction site / Nik Khairunnisa Nik Pa. (2008) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Preparation of operation and maintenance manual / Nurul Batrisyia Noor Amali. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Replacement broken tiles / Muhammad Idham Noor Effendi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Condition audit and maintenance for public building (Police Quarters) / Mohd Nor Rashidee Nora Afandi. (2010) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Estimating for renovation works (builders training & consulting) / Rifhan Wardah Nordin. (2015) Industrial Training. Universiti Teknologi MARA, Perak.

O

Laluan melepaskan diri di resort (kes kajian: Impiana Resort, Cherating dan Duta Palm Resort, Rawang) / Aslida Omar. (2002) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Acoustical finishes in auditoria / Yasmin Omar Lian. (2001) Degree thesis, thesis, Universiti Teknologi MARA.

Menara PjH, Putrajaya / Aizat Ilman On ... [et al.]. (2015) [Student Project]

Water-proofing / Fariha Ilyany Onn. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

The use of PV to replace typical skylight and its energy generation for cooling and lighting in Malaysian atria / Ahmad Ridzwan Othman. (2013) PhD thesis, thesis, Universiti Teknologi MARA (UiTM).

The impact of ceiling height on human comfort (a comparative study on residential in Seri Iskandar, Perak) / Muhammad Hiekal Othman. (2014) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

R

Numerical analysis on the effect of building spacing and podium on the flow structure over high rise residential buildings / A. A. Rahman ... [et al.]. (2024) Journal of Applied Engineering Design & Simulation (JAEDS), 4 (2): 2. pp. 9-20. ISSN 2805-5756

Portable floating house / Nurul Izzaty Rahman. (2021) [Student Project]

Waterproofing process of swimming pool / Norhafizah Rahmat. (2017) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

RNZ Interior Office Design Enterprise / Rozlinda Ramlan... [et al.]. (1997) [Entrepreneurship Project] (Unpublished)

Perbandingan di antara tangki beratap tetap dan tangki beratap bumbung / Jazzali Ramli ... [et al.]. (2002) [Student Project] (Unpublished)

Analysis of building defect - Tahir Majid Complex - Faculty Of Architecture, Planning And Surveying Mara University Of Technology (UiTM) Shah Alam, Selangor Darul Ehsan / Rohaizana Ramli. (2002) Degree thesis, thesis, Universiti Teknologi MARA.

Pembinaan ruang bawah tanah (basement) / Hairul Anuar Razali. (2008) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Comparative study of vertical greenery system for commercial building in Ipoh, Perak / Iqlima Damia Razarous. (2022) [Student Project]

Tiles installation / Muhammad Alif Syakir Rosdi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method for piling work in Tasek Kenyir / Mohd Safwan Roslam. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Interlocking brick IBS / Arif Khairin Rosli. (2021) [Student Project] (Unpublished)

Door construction for commercial building / Nur Shafiqah Rosli. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Proposed preventive maintenance for roofing ( Kompleks Islam Kuala Selangor) / Nurul Azira Rostaji. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Design of building using AutoCAD / Muhammad Farhan Rusdi. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

S

User experience on accessibility: person with disabilities in UiTM Perak / Muhammad Imran Sabri and Nurhidayah Samsul Rijal. (2023) In: UNSPECIFIED.

Cadangan ubahsuai rekabentuk dalaman 1 'D' Batik Motel', (Bayu Bernas Sdn. Bhd) Pusat Penerangan Pelancongan, Teluk Batik, 32300 Lumut, Perak untuk Majlis Perbandaran Manjung / Fuziah Sabry. (2007) [Student Project] (Unpublished)

Pembinaan dinding dan bumbung 'metal cladding' / Adnan Sabtu. (2005) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Cadangan menaiktaraf & rekabentuk baru bagi ruang legar stesen Keretapi Tanah Melayu Berhad (KTMB) di 4244, Jalan Bagan Dalam, 12100 Butterworth Pulau Pinang untuk tetuan Keretapi Tanah Melayu Berhad (KTMB) / Nor Dayana Sadeli. (2006) [Student Project] (Unpublished)

User’s satisfaction on traveling facilities for senior citizen at Kuala Lumpur International Airport (KLIA) & Kuala Lumpur International Airport 2 (KLIA 2) / Muhammad Shahrin Safri. (2016) [Student Project] (Unpublished)

Precast concrete staircase / Nuur Syifa Sahib. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction method of above ground level swimming pool / Muhammad Aminuddin Saidin. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Development of sustainable LSP-Bricks using local industrial wastes / Ani Maslina Saleh, Mohamad Nidzam Rahmat and Norsalisma Ismai. (2021) Built Environment Journal (BEJ), 18 (1). pp. 39-48. ISSN 1675-5022

Installation of floor and wall finishes for bathroom at Apple 99 Hotel / Siti Noor Aida Samsuri. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Laporan cadangan merekabentuk ruang dalaman kedai sukan bola keranjang And 1 di Lot G19B Ipoh Parade, Jalan Sultan Abdul Jalil, Greentown, 30450 Ipoh, Perak / Muhammad Idzwan Sawal. (2005) [Student Project] (Unpublished)

Brickwall construction of Mahsan Height, Bahau Negeri Sembilan / Nurul Farhana Seeron. (2017) [Student Project] (Unpublished)

Qlassic: Measurement procedure of quality level for finishes in building / Mohamad Ilham Shafie. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Building Condition Assessment (BCA) at Rumah Keluarga Angkatan Tentera Blok A24 Pangkalan TLDM, Lumut, Perak Darul Ridzuan / Nur Fatinah Shaharim. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Building orientation selection for thermal comfort fieldwork measurement: a systematic literature review / Noor Anis Afifa Shamsu Kamal Bahrin, Asniza Hamimi Abdul Tharim and Azhan Abdul Aziz. (2021) In: Virtual Go-Green: Conference and Publication (V-GoGreen 2020), 29-30 September 2020, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.

Construction method of scaffolding design / Nurul Syuhadah Atikah Shamsuddin. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pengurusan penyelenggaraan sistem pengagihan air / Azriana Sharif. (2004) Degree thesis, thesis, Universiti Teknologi MARA.

Users’ satisfaction towards facilities management services at federal buildings in Kedah / Nur Izzati Sharizan. (2021) [Student Project] (Unpublished)

The design of the roof of a mosque and how it affects thermal comfort / Mohamed Danial Sharom and Izzat Anuar. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

Installation of ceramic tiles / Nur Syuhada Suhaimi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Cadangan merekabentuk ruang dalaman Harley Davidson Cafe & Bistro di Lot 129 , Jalan Maarof, 56100 Bangsar, Kuala Lumpur. / Suhaslizan Sukor. (2006) [Student Project] (Unpublished)

Industrialised technique of housing construction using formwork for low cost development / Norizan Sulaiman. (2001) Degree thesis, thesis, Universiti Teknologi Mara (UiTM).

A study of local terracotta clay as glaze colourants / Siti Norhashimah Suman. (2023) Masters thesis, thesis, Universiti Teknologi MARA (UiTM).

Proposed new design scheme for National Cancer Council (MAKNA) headquaters office at No. 20 Jalan Gurney, 54100 Kuala Lumpur / Zaitun Syaiful. (2008) [Student Project] (Unpublished)

Building condition survey report at Lot 2, Jalan Hang Lekiu, Bandar Hilir Melaka / Syarifah Nur Adlin Syed Abdul Wahed. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

T

Novel temperature measurement and profiling system for bioclimatic building material / Mohd Nasir Taib … [et al.]. (2003) [Research Reports] (Unpublished)

Arch / Darren Tan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

U

Flood barrier safety door / Amirah Fatiha Usri and Mohd Najib Abd Rashid. (2023) In: UNSPECIFIED.

V

The study on thermal performance and daylighting of transparent concrete / Karthikgheyan Vasudevan, Hazril Sherney Basher and Mohd Hafizal Mohd Isa. (2022) In: 1st International e-Conference on Green and Safe Cities 2022 (IeGRESAFE), 20-21 September 2022, Universiti Teknologi MARA, Perak.

W

Floor slab construction / Ahmad Aiman Wafiq Zainan. (2021) [Student Project] (Unpublished)

The construction of In-Situ concrete staircase / Wan Abdul Wafi Wan Abdul Ghani. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Preventive maintenance and adhoc corrective in Menara Tabung Haji Tun Razak / Shafiyah Wan Md Suhaimi. (2018) [Student Project] (Unpublished)

A study on intelligent building concepts in Putrajaya / Wan Rohaiza Wan Muhammad. (2007) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Y

Method construction of reinforcement concrete pile / Muhammad Faiz Yaacob. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah penanaman cerucuk konkrit bertetulang untuk membina bangunan pejabat 4 tingkat di Universiti Teknologi MARA Shah Alam / Muhammad Ameerul Yacob. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kementerian Pendidikan Malaysia Wilayah Persekutuan Malaysia / Mohd Faizal Yahya ... [et al.]. (2015) [Student Project]

The development of automatic spraying robot for wall paintings / Norfadzilah Yahya and Jannatun Naemah Ismam. (2023) In: UNSPECIFIED.

Kaedah pembinaan tapak dan dinding tangki air jenis 'mushroom' / Zulkifli Yeop Ismail. (2009) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Factors affecting consumers’ satisfaction based on mall attributes in Seremban / Nur Batrisyia Aliah Yusmar and Najma Azman. (2023) In: UNSPECIFIED.

Transkrip wawancara bersama Engku Mohammad Nazir Bin Raja Omar cucu kepada pemilik rumah Tengku Bongsu @ Tengku Ismail / Alia Farhana Yusof and Muhamad Amer Aiman Mohd Razani. (2019) [Oral History] (Submitted)

Fire safe iron grilles (jerejak besi yang mempunyai nilai-nilai keselamatan terhadap kebakaran) / Osman Yusof. (1990) [Student Project] (Unpublished)

Z

Floor finishes / Mukleiss Mohamed Zachariah. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Type of tiles and their application in building / Muhammad Zahid Zainol. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The significant effect of floor surface roughness on slip resistance in public toilet in Tanah Merah, Kelantan / Muhammad Uzair Aiman Zainuddin, Salahuddin Abdul Hakeem Abas and Iryani Abdul Halim Choo. (2023) In: UNSPECIFIED.

Concreting works / Nur Atiqah Najihah Zakaria. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

Material selection and purchasing process / Muhamad Khairul Ikhwan Zamry. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method statement of strip foundation and detail of the design / Amir Rusydi Zolkfle. (2015) [Student Project] (Submitted)

Installing ceramic tiles work / Airil Aiman Zulkarnaim. (2021) [Student Project] (Unpublished)

Installation of roof / Nur Anis Nadhirah Zulkefly. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)

Installation of parquet board for two storey house / Muhammad Haikal Zuhri Zulkifli. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method of roof construction / Nurafiqah Nadhirah Zulmat. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

This list was generated on Thu Dec 19 09:37:43 2024 UTC.