Construction of superstructure

Nor Azman, Nur Khaireen (2019) Construction of superstructure. Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)
Abstract

The project is about a government construction project of a health clinic type 7 which is located at Kuala Tekal near Temerloh in Pahang. The construction period began from 30 January 2019 and the completion date is on 1 December 2020. The aim of the study is to discover the construction of superstructure construction which mainly focus of the construction method. The importance of superstructure construction also was identified and the problems occurred have been determined and solutions have been taken to solve it. The method overall started from the reinforcement work of installing the main bar and linked with the stirrups for column and beam or other secondary main bar for the slab. Next, the formwork with spacer bar was installed to keep the reinforcement bar in place during concreting work.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 121334.pdf]
Text
121334.pdf
Download (1MB)
Indexing & Metrics