Wall installation (Caspia 2 – Puncak Iskandar) / Mohd Alif Aiman Azemi

Azemi, Mohd Alif Aiman (2016) Wall installation (Caspia 2 – Puncak Iskandar) / Mohd Alif Aiman Azemi. [Student Project]
Abstract

Nowadays, the construction industry has been rapid and advanced. This report will discuss about construction wall of the selected case study, Caspia 2 – Puncak Iskandar. It produced refer on experience for four months stationed on the site of the construction project. This report divides a few parts, including background of a company and background of the project. The observation found null wall construction look simple because it involves a lot of process and complicated. Therefore, this report will be explained about the process in the construction of wall, identify the type of wall and materials use at selected case study building. Besides, the other objectives through a case study insight is to make sure the step of installation is right and would not be crack. The results of the study found aneasier and faster installation of wall. Generally, this report explains on wall of construction method or process at selected of case study is Caspia 2 – Puncak Iskandar.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 57007.pdf]
Text
57007.pdf
Download (420kB)
Location & Physical Holdings
Digital Copy
Physical Location
  • Bilik Koleksi Akses Terhad, PTAR Kampus Seri Iskandar, Perak
Item Status
Indexing & Metrics