Installation of rainwater downpipe

Wan Mahazir, Wan lrfan Nukman (2019) Installation of rainwater downpipe. Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)
Abstract

The project is about a construction of an integration building consists of library, main hall, student activities centre and office at Kolej Poly-Tech MARA, which is located at Bangi, Selangor. The construction period began from 29 February 2016 and supposedly completed on 28 August 2017 but delayed to 12 December 2019. The aim of the study is to discover the installation of rainwater downpipe which mainly focused on the installation method including its materials and types. The cost and time taken also was investigated together with the problems that occurred and its solutions.