Items where Subject is "Plumbing and pipefitting"

Group by: Creators | Item Type
Jump to: A | B | D | E | I | J | K | L | M | O | R | T | W | Z
Number of items at this level: 44.

A

Construction of sanitation and refuse disposal system for Sekolah Rendah Agama (SRA) / Luqman Nul Hakim Ab Razak. (2015) [Student Project]

Reinstallation of water supply system (Service provider for low-rise building) / Alifah Abas. (2017) [Student Project]

The process for obtaining the Sewerage Works Application (SWA) approval and Sewerage Works Completion (SWC) approval / Mohd Mustafa Abdul Malik. (2018) [Student Project] (Submitted)

The impacts of flash flood towards the resident of Taman Kenari Jaya / Nur Irdina Sari Abdul Aziz and Mohd Khairul Amri Ramly. (2023) In: UNSPECIFIED.

External cold water supply system / Ahmad Razlan Alif Zuraimi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Drainage work / Ahmad Faris Hakim Azrin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Water conservation system practices at building in Klang valley / Nurul Huda Abd. Kadir. (2009) [Student Project] (Unpublished)

Poly-Piping Sdn. Bhd / Mohd Ezuan Abd Rahim... [et al.]. (2003) [Entrepreneurship Project] (Unpublished)

B

Valves inspection / Bernadette Dau Simon. (2021) [Student Project] (Unpublished)

D

Kegunaan pam air di rumah / Jasni Dewa dan Mohd Najib Masroni. (1992) [Student Project] (Unpublished)

E

Pemasangan paip sistem pembentungan / Siti Hodijah Ehwan. (2006) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

I

The installation of drainage system and staircase for 8 lot double storeys terrace at Laman Annur, Panji, Kota Bharu, Kelantan / Muhamad Iskandar Ismail. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

The installation of waterproofing system / Elina Ilias. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Penyelenggaraan sistem bekalan air kes kajian: Masjid Sultan Salahuddin Abdul Aziz Shah dan Masjid Negara / Syamful Azman Ibrahim. (1997) Degree thesis, thesis, Universiti Teknologi MARA.

Thermal performance of naturally - ventilated test building with roof insulation and ceiling insulation / Noraisyah Ishak. (2009) [Student Project] (Unpublished)

Costing of rainwater harvesting system for three types of houses in Seremban / Aida Liyana Ismail and Sayed Muhammad Aiman Sayed Abul Khair. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

Installation of gas piping system in residential area / Mohamad Izhar Ishak and Mohd Ghazali Hariri. (2003) [Student Project] (Unpublished)

J

MNI Pipelink Invention Sdn. Bhd. / Anis Maisarah Jafri … [et al.]. (2022) [Entrepreneurship Project] (Unpublished)

Experimental study on iron accumulation in pipes / Md Badarudin Jamal. (1996) Advanced Diploma thesis, thesis, Universiti Teknologi MARA (UiTM).

Types of waterproofing system / Syahida Jamil. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

K

The installation of water reticulation pipe system in Universiti Sultan Zainal Abidin, Kuala Terengganu / Nur Liyana Kamarudin. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

L

Tender process for the operation and non-comprehensive maintenance of water features, pools and plumbing systems at common estate, Masjid Asy-Syakirin KLCC and multi level car park at Uda Dayaurus Sdn. Bhd. / Fatin Nabilah Lukman. (2013) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

M

Subsoil drainage system / Muhammad Amirul Asraf Mohd Nordin. (2016) [Student Project]

Smart auto toilet system / Muhammad Aizmin Misel Khan & Nur Hanisah Musa. (2015) [Student Project] (Unpublished)

Plumbing and sanitation problems in high rise building / Mohd Zulkhazmi Mohd Azam. (2010) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

High Density Polyethylene (HDPE) / Siti Aminah Misman. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of the precast U-drainage / Mohamad Farhan Mohd Ayob. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Smart rainwater downpipe / Siti Naimah Mahsuri and Ezzat Fahmi Ahmad. (2023) In: UNSPECIFIED.

Underground piping installation at the construction site / Nurul Sarah Mohamad Sinatra. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

High-tech plumbing detector / Ahmad Nuradli Mahafiz and Mohd Najib Abd Rashid. (2023) In: UNSPECIFIED.

Maintenance management and operation on dam / Khairur Zahirin Misngat. (2008) Degree thesis, thesis, Universiti Teknologi MARA.

Theoretical study of water leakage / Muhamad Amirul Iman Muhamad Rizal. (2018) [Student Project]

Installation of waterproofing system at Recreation Centre, 45th floor, Menara Maybank / Muhammad Farhan Mohd Sofi. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

A feasibility study on rainwater harvesting system for mosque in Perak Tengah / Muhammad Amirul Asraf Mohd Nordin and Nur Azfahani Ahmad. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

Water level and water leakage detector / Mohamad Nazri Mokhtar and Nur Alinawati Baharom. (2005) [Student Project] (Unpublished)

Centralized on-site detention (OSD) tank : potential re-use of water harvest implementation in housing / Nurdayana binti Mohamad Suki. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

Maintenance of water tank at Apartment Laguna Biru / Muhammad Azwan Mohtar. (2017) [Student Project]

O

Water-proofing / Fariha Ilyany Onn. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

R

Construction of drainage / Muhammad Azmil Rosli. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The LPG piping system at school lab of Sek. Men. Keb. Dato’ Sheikh Ahmad, Arau / Muhammad Zulhilmi Rafeen and Shaiful Nizam Basri. (2002) [Student Project] (Unpublished)

T

Design of plastic injection mould of a drainage filter / Aishah Taha and Zulkefli Abu Bakar. (1997) [Student Project] (Unpublished)

W

Method of installation septic tank / Wan Muhammad Faiq Wan Ahmad. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Z

Kaedah pemasangan longkang U / Mohd Nazrin Zahurin. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Plumbuire Enterprise : Plumbing Services / Marrisa Amilia Zamri ...[et al.]. (2017) [Entrepreneurship Project] (Unpublished)

This list was generated on Sat Dec 21 23:17:22 2024 UTC.