External cold water supply system / Ahmad Razlan Alif Zuraimi

Alif Zuraimi, Ahmad Razlan (2019) External cold water supply system / Ahmad Razlan Alif Zuraimi. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Abstract

Installation of plumbing systems is usually done during the early stages of construction of a building to be built. Various procedures need to be done before plumbing can be carried out such as obtaining approval from the SAJ (Syarikat Air Johor). This report will focus on how a plumbing system is installed under construction and the tools used to install the plumbing. This report also describes the method statement of how the piping system is handled in more detail. This report will focus on how the installation of external cold water supply system is done until the water can be channeled into the building also ensures adequate water pressure can be supplied and properly distributed throughout the construction area.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 98372.pdf]
Text
98372.pdf
Download (15MB)
Indexing & Metrics