Construction method of superstructure for terrace house / Wan Nurul Izzah Wan Ibrahim

Wan Ibrahim, Wan Nurul Izzah (2019) Construction method of superstructure for terrace house / Wan Nurul Izzah Wan Ibrahim. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Abstract

This report was about the Construction Method of Superstructure for Terrace House. The objective of writing this report was to describe the construction procedures of superstructure for terrace house, identify machineries and the problems with its solutions. The method of study that had been used to obtain the information was by site visits, interviews and document reviews with Project Executives and main contractor at Kajang East Precint 1,37332, Semenyih, Selangor. The method for this project started with proposal followed by tendering, selection of contractor, work progress, work completion and the maintenance work. In results, the procedures had been obtained, the machineries had been identified and the problems with its solutions had been investigated easily. Finally, all of the information was to complete the report.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 95901.pdf]
Text
95901.pdf
Download (14MB)
Indexing & Metrics