Abstract
This report was about the Construction Method of Superstructure for Terrace House. The objective of writing this report was to describe the construction procedures of superstructure for terrace house, identify machineries and the problems with its solutions. The method of study that had been used to obtain the information was by site visits, interviews and document reviews with Project Executives and main contractor at Kajang East Precint 1,37332, Semenyih, Selangor. The method for this project started with proposal followed by tendering, selection of contractor, work progress, work completion and the maintenance work. In results, the procedures had been obtained, the machineries had been identified and the problems with its solutions had been investigated easily. Finally, all of the information was to complete the report.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Wan Ibrahim, Wan Nurul Izzah 2017208776 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ibrahim, Azira UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > House construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | construction method, superstructure, terrace house |
Date: | 2019 |
URI: | https://ir.uitm.edu.my/id/eprint/95901 |