Piling work, construction of foundation and ancillary work / Muhammad Haikal Mohd Noor

Mohd Noor, Muhammad Haikal (2022) Piling work, construction of foundation and ancillary work / Muhammad Haikal Mohd Noor. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Abstract

The piling work, construction of foundation and ancillary work during this report is relevant because in the construction process there is this work. The explanation for this work has is about what to do in the piling activity, what should do after the piling work, how to conduct the piling, also after the construction foundation. The data used on the report can get by using interview method, from the method statement and from the internet search. in relation to what is often done, in the field of construction should follow the spec set by the client and rely on the law that UBBL 1984 is a building code which provides the minimum requirements for the control and construction of street, drainage and building in local authorities' areas.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 85903.PDF]
Text
85903.PDF
Download (1MB)
Indexing & Metrics