Items where Subject is "Buildings: Construction with reference to use.Including public buildings, dwellings"

Group by: Creators | Item Type
Jump to: A | B | C | D | E | F | G | H | I | J | K | L | M | N | O | P | R | S | W | Y | Z
Number of items at this level: 196.

A

Issues and challenges in implemeting green building incentives among the construction key players in Malaysia / Nur Anis A. Rahman. (2016) [Student Project]

A study on selected cases in Malaysian construction contract / Md. Afandi Ab. Aziz. (1993) [Student Project] (Unpublished)

Testing and commissioning procedure on installation of single tower crane / Noor Azira Abdul Aziz. (2014) Industrial Training. Universiti Teknologi Mara, Perak.

Installation method of floor finishes for a unit of semi-D single storey house / Syazwana Qistina Abdul Aziz. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Host satisfaction towards short term rental accommodation (STRA) regulation in stratified property: a case study of Airbnb in I-City, Shah Alam / Abu Asyad Abdul Halim. (2023) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

An integrated value management (IVM) framework for contractors in design and build (D&B) projects / Siti Hamidah Abdul Hamid. (2014) Masters thesis, thesis, Universiti Teknologi MARA.

The relationships of internal resources and procurement process coordination on operational performance in building construction industry / Abdul Razif Abdul Razak. (2017) Masters thesis, thesis, Universiti Teknologi MARA (UiTM).

Plan submission process for proposed workshop Regal PAC Sdn. Bhd. / Muhammad Ikhwan Abdul Wahab. (2015) [Student Project]

SIRIM Berhad Tower Shah Alam (Block 5: Centre of the Customer Service) Selangor Darul Ehsan / Nur Fazira Abdullah ... [et al.]. (2018) [Student Project] (Unpublished)

Installation of u-drain / Muhamad Amirul Shadiq Abu Bakar. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Stakeholders perception on the implementation of green building concepts / Muhammad Iqbal Abu Bakar. (2021) Degree thesis, thesis, Universiti Teknologi MARA, Perak.

Temporary work systems used for concrete frame construction / Nur Asmeehan Abu Bakar. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Safety issues at partially abandoned commercial buildings in Setia Taipan, Shah Alam / Adzaty Lyana Adam. (2020) [Student Project] (Unpublished)

Structure construction / Megat Amirul Hakim Afandi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method of renovating school toilet / Muhammad Asrul Affendi. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Safety features of ablution area in Masjid Baling, Kedah / Nur Nabilah Afini Hafizi. (2022) [Student Project]

Construction project management implementation: case study on constructing and finishing 2 unit 1988 ft 2 semi-detached house at Mentuan / Muhamad Afnan Afiq Nazi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Study of construction and maintenance of slope in Klang Valley highway / Nadzren Ahayalimudin. (2009) [Student Project] (Unpublished)

Kriteria kejayaan projek pembinaan hospital awam di Malaysia - satu kajian empirikal R&B/ Hayroman Ahmad, Abdul Rashid Abdul Aziz and Mastura Jaafar. (2008) In: Proceedings STSS 2008 Broadening Horizons Through Research Social Sciences, 3 – 4 June 2008, M.S Garden Hotel Kuantan, Pahang.

Method of application waterstop case study: Pembinaan Gabungan Pengusaha Rakyat (GPRC) / Mohd Ariffin Ahmad. (2013) [Student Project]

The facilities for person with disabilities in Public Hospital at Perak / Nurul Ainaa Afifah Ahmad Basri. (2021) [Student Project] (Unpublished)

OKU toilet construction / Muhamad Zahran Ahmad Daud. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Menara Sunway / Ahmad Izzulhafiz Musalakmal ... [et al.]. (2019) [Student Project] (Unpublished)

A renovation works for space expansion of an office room / Muhammad Ashraf Ahmad Jasmani. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Garis panduan proses dalam meluluskan perletakan stesen minyak. Kajian kes : Bangsar / Ahmad Johari Hj Zakry. (1993) [Student Project] (Unpublished)

Menara Majlis Perbandaran Ampang Jaya / Muhamad Zamir Khairi Ahmad Khairani ... [et al.]. (2013) [Student Project]

Site audit and reporting of telecommunication tower / Aiman Nurhakim Ahmad Khanzir. (2021) [Student Project] (Unpublished)

Piling work construction / Muhammad Aiman Nasrullah Ahmad Ritzman. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Handling bandar baru Setiawan P\Perdana site progress work, valuation on site and preparation of interim payment certificate / Shazieta Adlika Ahmad Zaki. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

A study on strategies of Sarawak Consolidated Industries Berhad (SCIB) to achieve competitive advantages in industrialised building system (IBS) industries in Kuching / Abu Bakar Ahmat and Rosalina Suai. (2014) Masters thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.

Safety awareness and malpractice scaffolding erection in high rise building / Nurul Zulaikha Alias. (2021) [Student Project] (Unpublished)

Customers satisfaction towards maintenance management in a government hospital building in Malaysia / Mirdeeliana Amir. (2012) In: 1st International Conference on Innovation and Technology for Sustainable Built Environment 2012 (ICITSBE 2012), 16-17 April 2012, Universiti Teknologi MARA Cawangan Perak.

A study of defect analysis in medium cost apartment / Richeal Anak Andrice. (2013) [Student Project] (Submitted)

TH Selbon Tower, Kuala Lumpur / Andrea Daling ... [et al.]. (2019) [Student Project] (Unpublished)

Ministry of Tourism and Culture (MOTAC) / Muhamad Asyraf Asbar ... [et al.]. (2018) [Student Project] (Unpublished)

A study on metaphysics and its influence in commercial building design / Nor Aniswati Awang Lah. (2018) Masters thesis, thesis, Universiti Teknologi MARA (UiTM).

The construction of pad foundation / 'Ainaa 'Arifah Awang Omar. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Space inventory / Afiq Haziq Azmi. (2015) [Student Project] (Unpublished)

Renovation and maintenance project at Pertubuhan Peladang kawasan Padang Rengas fertilizer store / Nurul Hanis Azmi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

B

The construction of ground floor slab for administration building, Sakj Lebai Mohd Yaakob, Ayer Baloi, Pontian, Johor / Siti Nur Azirah Bachok. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Evaluating the effectiveness on BIM training programme in proposing guideline at myBIM centre, Malaysia / Muhammad Fakar Badrul Hisham. (2022) Masters thesis, thesis, Universiti Teknologi MARA, Perak.

Construction method of soil improvement for new surau of Taman Anika, Batu 9, Port Dickson and other related works / Norhikmah Ieman Baharudin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kerja-kerja tanah (cut and fill) / Mohamad Rizwan Bakar. (2008) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Effect of building orientation on indoor microclimate of classroom buildings at the Kaduna State University / Markus Bulus. (2018) Built Environment Journal (BEJ), 15 (2). pp. 14-23. ISSN 1675-5022

C

Sustainable construction debris management in Bina Darulaman Berhad (BDB) / Muhammad Atiff Suhail Che Had and Nor Amin Mohd Radzuan. (2023) In: UNSPECIFIED.

Build and complete fences and related works at Pejabat Pertubuhan Peladang kawasan C-II Kerpan, Wilayah II, MADA / Muhammad Hazim Che Zaim. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Building demolition at Ibu Pejabat Polis Kontijen (IPK) construction site Kuala Terengganu / Nur Maisarah Che Zakaria. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Facilities management readiness in Building Information Modelling (BIM) implementation in Malaysia / Nur Maisarah Che Zakaria. (2021) Degree thesis, thesis, Universiti Teknologi MARA, Perak.

D

An enhancement of home safety grilles in preventing property crimes. Case study: Shah Alam, Selangor / Mohd Norhan Dulkahar and Erwin Rezasyah. (2012) [Research Reports] (Unpublished)

E

Maintenance and facilities management of Kota Putera Square (KPS) / Mohamad Zuhairi Effendy. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

F

Post occupancy evaluation of hostel building in public university / Fatin Farzana Fakhruddin. (2021) [Student Project] (Unpublished)

Bus stop construction and maintenance / Nur Dayana Firdaus. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)

G

Structural work of 8 storeys car park podium (Post Tension Method) / Faizatul Azlin Gani. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

H

The challenges of facilities management for pondok institution in Malaysia / Muhammad Shahrol Hafiz Ibrahim, Yuhainis Abdul Talib and Nor Aini Salleh. (2022) In: Virtual Go Green: Conference and Publication (v-Gogreen 2021) “Rethinking Built Environment: Towards a Sustainable Future” 29th-30th September 2021, 29 - 30 September 2021, Universiti Teknologi MARA, Cawangan Perak.

The study of mosque architecture in Sarawak under the leadership of Pehin Sri Haji Abdul Taib Mahmud / Jamil Haji Hamali... [et al.]. (2012) [Research Reports] (Unpublished)

Smart Building Structure / Hasrul Halimoon. (2021) In: UNSPECIFIED.

Esteem report / Muhamad Haziq Hamidon ... [et al.]. Other. Faculty Of Civil Engineering, UiTM Cawangan Johor Kampus Pasir Gudang.

Facilities management in Universiti Teknologi MARA Perak Cawangan Tapah / Muhammad Haiman Hakim Hamran. (2017) [Student Project]

Construction of Sekolah Kebangsaan Parit Kudus using lightweight concrete / Mohammad Naim Haikal Hassan. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The applicability of disabled access and facilities at bus terminals in Klang Valley / Nur Hasliana Hassan. (2015) [Student Project] (Unpublished)

I

The criteria of the building plan approval by local authority: new project proposals plan / Hasnulhadi Ibrahim. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Structural steel works / Mohamad Alif Syafari Ibrahim. (2017) [Student Project]

Solar panel as source of renewable energy in residential building (a case study in Venice of Perak, Lumut and Taman Dindings Ayer Tawar, Perak / Nur Izzati Ibrahim. (2014) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Quality issues of food stall’s construction at recreation center, Kelemin’s River, Dungun, Terengganu / Asiah Nabihah Ishak. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)

Construction of chain barrier post for P3 PETRONAS RAPID Project, Pengerang, Johor / Fatin Nurshazleen Ismail. (2018) [Student Project] (Submitted)

The installation of drainage system and staircase for 8 lot double storeys terrace at Laman Annur, Panji, Kota Bharu, Kelantan / Muhamad Iskandar Ismail. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Construction of sluice gate building / Muhammad Amir Danial Ismail. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Assessing health and safety practice for refurbishment work at Klang Valley / Muhammad Muzakkir Ismail. (2015) [Student Project] (Unpublished)

Accessibility for Person With Disabilities (PWDs) at public transportation in KTMB Perak / Nurul Najwa Suhadah Ismail. (2021) [Student Project] (Unpublished)

J

Cadangan sekim perumahan di atas lot 1172,1173,1176,2994,2995,6839,6841 & 6843 mukim 11. Sungai Dua, Seberang Perai Utara / Mohammad Aizat Ja'afar ... [et al.]. Other. Faculty Of Civil Engineering, UiTM Cawangan Johor Kampus Pasir Gudang.

Laporan cadangan mengubahsuai rekabentuk dalaman untuk UMW Toyota Motor Sdn Bhd di Lot 4798, Jalan Kuala Kangsar, 30100 Ipoh, Perak / Ahmad Faizal Jaffar. (2006) [Student Project] (Unpublished)

Penggunaan konkrit siap bancuh di tapak bina / Mohamad Syihabuddin Jusoh. (2009) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

K

Factors contributing to residential overhang in Johor Bahru / Nurul Aqilah Kamal and Nor Nazihah Chuweni. (2023) In: UNSPECIFIED.

Facility manager competencies for building performance at public building / Siti Nurfaqiha Adila Kamaluddin. (2021) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.

Homeownership constraints among youth in Shah Alam, Selangor / Adam Iskandar Kamarul Azhar. (2023) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Refurbisment of shopping mall / Noor Liana Husna Kasim. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Attorney General Chamber (AGC), Putrajaya / Muhammad Nurhamzah Khairi ... [et al.]. (2013) [Student Project] (Unpublished)

Upgrading of road safety infrastructure (divider) / Nur Liely Syafiqah Khairuddin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Comparison of safety and health in building design of elderly house / Aniq Hakimie Khairul Shahril and Nurul Fadzila Zahari. (2023) In: UNSPECIFIED.

Wakaf construction process / Khairul Azhar Khalid. (2018) [Student Project]

Strategies to enlarge the market availability of Green Building Materials (GBM) for construction works: gathering the “low-hanging fruits” / Natasha Khalil ... [et al.]. (2022) In: 1st International e-Conference on Green and Safe Cities 2022 (IeGRESAFE), 20-21 September 2022, Universiti Teknologi MARA, Perak.

L

An empirical investigation on factors improving the execution of Key Performance Indicators (KPIs) for assessing the operational performance of PPP projects / Nor Suzila Lop. (2021) In: Virtual Go-Green: Conference and Publication (V-GoGreen 2020), 29-30 September 2020, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.

M

Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid. (2013) [Student Project]

A study on space and facilities management in public school (special education integration program in Klang Valley) / Siti Aishah Maseroo. (2011) Masters thesis, thesis, Universiti Teknologi MARA.

A study on the user satisfaction with facilities and services provided at Seri Iskandar Bus Terminal / Nur Iffah Mohd Isa and Norehan Norlida Haji Mohd Noor. (2023) In: UNSPECIFIED.

Kaedah penyelenggaraan fasad luar Menara Berkembar PETRONAS (KLCC) / Siti Jazila Md Ali. (2002) Degree thesis, thesis, Universiti Teknologi MARA.

Pembinaan struktur kerangka bangunan / Mohamad Syamir Md Deris. (2007) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction process of TNB compact substation / Muhammad Aiman Zikri Md Jizat. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Development order of depot Bus Batu Caves and Complex Rapidbus Cheras Selatan / Nurul Amira Md Nasri. (2015) [Student Project]

Building apparaisal of precast concrete construction / Azras Md Shah. (2006) Degree thesis, thesis, MARA University of Technology.

The construction of pad foundation / Muhammad Zulhadzhim Md Sharif. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Defect repairing work on building during Defects Liability Period (DLP) (Rural Health Clinics KD2G types 1 and 2 for Ministry of Health Malaysia): FN Communication Sdn. Bhd./ Mior Ahmad Ridzuan Mior Alhadi. (2015) [Student Project]

The construction training centres in providing local skilled manpower / Farrah Fazini Mohamad. (2004) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Maintenance management of mosque at Parit Buntar, Bagan Serai and Semanggol / Nurulhuda Mohamad Anizan. (2021) Degree thesis, thesis, Universiti Teknologi MARA, Perak.

Substructure (piling system) / Muhamad Amirul Adli Mohamad Azman. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method of construction and maintenance of dome roof mosque / Mohd Bazly Mohamad Najib. (2008) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Building approval procedure / Nurul Syafiqah Mohamad Rosidi. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Pembinaan sistem saliran permukaan (surface drainage system) / Mohd Hafizi Mohamad Shukri. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

A study on the user perception of the safety aspect at the extreme park / Nor Farah Aida Mohamed Zeble. (2015) [Student Project] (Unpublished)

The importance of dilapidation survey before the commencement of construction work in Malaysia / Nurul Afiqah Mohammad Batni. (2015) [Student Project] (Unpublished)

The construction of flat slab / Nurfarah Hanim Mohammad Fadzil. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Kesan pembinaan struktur konkrit bertetulang berhampiran kawasan laut / Nurhafizah Mohd Ali. (2008) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pre-construction dilapidation survey on building and road infrastructure at Sungai Ara Penang / Muhammad Ikram Mohd Basri. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pad foundation process for klinik kesihatan 3 Rantau Panjang Kelantan / Mohd Faiz Mohd Juhari. (2018) [Student Project]

Late and non-payments issues in the Malaysian construction industry : perspective of building material suppliers / Mohd Fisal Ishak, Kartina Alauddin and Mohd Shahrol Hafiz Ibrahim. (2019) Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 39-56. ISSN 0128-326X

Knowledge strategies on the implementation of Modular Building System (MBS) for construction project / Muhammad Faris Najmi Mohd Fisal and Kharizam Ismail. (2023) In: UNSPECIFIED.

Construction of pile cap / Nur Syahira Liyana Mohd Ghazali. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The influence of dwelling design on the performance of indoor ventilation / Siti Suhaila Mohd Hashim. (2015) [Student Project] (Unpublished)

A study of building plan approval for extension and renovation work (individual application) / Ahmad Faisal Mohd Isa. (2008) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Advanced full-body harness of personal fall arrest system for construction of high-rise building in urban area / Khairunnisa Najwa Mohd Isa. (2021) [Student Project]

A systematic review on the youth's healthcare facilities determinants in Seri Iskandar / Muhammad Adib Hafizi Mohd Khiri and Mohamad Haizam Mohamed Saraf. (2023) In: UNSPECIFIED.

Kajian perbandingan pengenalpastian bahaya, penilaian risiko dan pengawalan risiko (HIRAC) di kalangan pelajar Fakulti Seni Bina Perancangan Dan Ukur (FSPU) Universiti Teknologi Mara (UITM) Sri Iskandar Perak dengan (UITM) Shah Alam Selangor / Mohd Hazril Mohd Napi. (2009) [Student Project] (Unpublished)

Refurbishment work at Pasar Siti / Nur Shalsabila Mohd Nawi. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Piling work, construction of foundation and ancillary work / Muhammad Haikal Mohd Noor. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method statement for earthwork / Nur Aina Akmal Mohd Noor. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The procuder of renovation project / Nurul Hidayah Mohd Noor. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Problem on submission procedure for temporary and new building / Afiqah Mohd Radzi. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

The construction of driveway / Izzat Farhan Mohd Razali. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The process of ground floor slab construction for funeral home at Masjid Ismail Petra, 17500 Tanah Merah, Kelantan / Anis Syafika Mohd Saupi. (2017) [Student Project]

Renovation inspection process at the clovers, Penang / Nurul Aimuni Athirah Mohd Shafie. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Safety and health of foreign workers at construction site / Mohd Shafeeq Al Bakry Mohd Shailan. (2010) [Student Project] (Unpublished)

Construction of car porch steel structure / Muhammad Danish Haykal Mohd Tarmizi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Penggunaan 'spun pile' di Jambatan Sungai Kempas, Johor Bharu / Nurulafifa Mohd Yusop. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction and compeletion of pedestrian bridge at Persiaran Sarjana, Jalan Panchor, Bandar Universiti Pagoh / Luqmanulhaqim Mohd Yusri. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Renovation work of cheese lab / Muhamad Hazran Mohd Zali. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction process of “Kolah Wudhuk” Masjid Bukit Tanah, Jabi, Besut, Terengganu / Mohamad Amerudin Mohd Zarawi. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Procurement of roller shutter for Masjid Kota Kemuning, Seksyen 31 Shah Alam / Mohammad Zulfazdley Mohd Zulkifli Cheng. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Perniagaan informal di Pusat Bandar Batu Gajah, Perak / Nur Atika Syazila Muda dan Mimi Rozaida Mohamed Roduan. (2010) [Student Project] (Unpublished)

Construction of superstructure at D’Bali Harmoni, Tok Bali, Pasir Puteh, Kelantan / Muhamad Ammar Zulhusni Muhamad Nawawi. (2017) [Student Project] (Unpublished)

The step construction process of “surau” at Pejabat Daerah Sik, Kedah / Nur Athirah Muhamad Suhaimi. (2015) [Student Project] (Unpublished)

Approval of work / Muhammad Ariff Imran Ruzlan. (2017) [Student Project] (Unpublished)

Purchaser materials for construction works / Nurin Afrina Muhammad Ruslan. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Process of building plan approval: housing scheme / Noor Fatehah Mustaffa. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

N

Means of egress in hospital wards in Perak, Malaysia / Muhammad Amir Ezzat Nasaruddin and Adnin Syaza Jaafar. (2020) In: QS Colloquium 2020 Series XII.

Process of interlocking brickwork for wall at Perla Apartment Project / Nurul Syafinaz Nasfi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Maintainability of design and facilities for Persons With Disabilities (PWD) in education building (Library PTAR UiTM Perak) / Nurul Najah Nasrul. (2021) [Student Project] (Unpublished)

Maintenance planning / Muhamad Nazreen Nazle Asmade. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Tendering / Nurul Syamimi Hana Ngaini. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Electrical domestic installation for the high rise dwelling / Nik Azran Izhar Nik Ahamed. (2008) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Method of beam launching for East Klang Valley Expressway (EKVE) bridge / Nik Mazni Iryani Nik Mansor. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pengeluaran sijil perakuan menduduki bangunan oleh pihak berkuasa tempatan / Jannatul Akmal Nizamuddin. (2000) Degree thesis, thesis, Universiti Teknologi MARA.

Procedure building plan approval in Alor Setar City Council (MBAS) / Aiman Amir Noor Shamshidi. (2021) [Student Project] (Unpublished)

The construction of substructure for Cure & Care Clinic 1Malaysia at Bandar Seri Iskandar, Perak / Nursuhada Hazuany. (2015) [Student Project]

O

Adapting by altering: spatial modifications of terraced houses in the Klang Valley area / Erdayu Os’hara Omar, Esmawee Endut and Masran Saruwono. (2017) Asian Journal of Environment-Behaviour Studies, 2 (2). pp. 1-10. ISSN 2514-751X

E-Safe Sdn. Bhd / Erzura Najwa Othman … [et al.]. (2004) [Entrepreneurship Project] (Unpublished)

Quality assessment system in construction (QLASSIC) at PB Sentral and KP Perdana sites at Kuala Terengganu / Fatin Nabila Othman. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

P

Industrialized Building System (IBS) for concrete (Case study at Clinic 1Malaysia Cure & Care Nationnal Anti-Drug Agency) / Muhammad Haziq Pauzi. (2015) [Student Project]

R

Green practices at Café towards customer satisfaction in Klang Valley / Nur Qamarina Raffikhul Houssain, Asniza Hamimi Abdul Tharim and Suriani Ngah Abdul Wahab. (2022) In: e-Proceedings V-GOGREEN 2021 VIRTUAL GO GREEN: Conference and publication, 29-30 September, Universiti Teknologi MARA, Perak Branch.

Waterproofing process of swimming pool / Norhafizah Rahmat. (2017) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

A study on occupants’ awareness towards energy efficiency: PETRONAS East Coast Regional Office / Nur Sabrina Ramlan. (2021) [Student Project]

A comparative study of tunnel / Hadijah Ramsjah. (2005) Degree thesis, thesis, Universiti Teknologi MARA.

The Pencil Paradise / Ainul Azri Ran ... [et al.]. (2017) [Entrepreneurship Project] (Unpublished)

Building control system at Kementerian Teknologi Tenaga dan Air, Putrajaya / Muhammad Fadhli Hakim Razak. (2016) [Student Project] (Unpublished)

A study on inventory system in UiTM Shah Alam (main campus) / Nor Khalilah Rosli. (2009) [Student Project] (Unpublished)

Door construction for commercial building / Nur Shafiqah Rosli. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Elevator installation at Sungai Pinang apartment / Nur Zafirah Rosshidi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Penyediaan tempat letak kereta di Flat Taman Beringin, Jinjang Utara, Kuala Lumpur / Muhammad Hafizudin Roszai. (2013) [Student Project] (Unpublished)

Tangki simpanan air: 'G-cistern' FRP / Abdul Razak Rusli. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction of reinforced concrete slab at Riana South Condominium / Qamarul Azarin Rusli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

A study on quality of facilities services provided for visitors at General Hospital Ipoh / Rais Adlan Ruzaidi. (2016) [Student Project]

S

User’s satisfaction on traveling facilities for senior citizen at Kuala Lumpur International Airport (KLIA) & Kuala Lumpur International Airport 2 (KLIA 2) / Muhammad Shahrin Safri. (2016) [Student Project] (Unpublished)

Pump house construction work in Kuala Kedah, Kedah / Muhammad Arash Rizwan Salmee. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of concrete structure (raft foundation) / Noor Shafrina Samsuri. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Expressions and stylistic trends of homeowners in terrace housing / Masran Saruwono, Abdurrahman Mohd Rashid and Erdayu Os’hara Omar. (2018) Asian Journal of Environment-Behaviour Studies, 3 (6). pp. 1-9. ISSN 2514-751X

Building condition assessment at Stadium Pengkalan Tentera Laut Diraja Malaysia (TLDM), Lumut / Mohd Rozaimi Shafiee. (2013) [Student Project]

The effectiveness of ready mixed concrete / Norazman Shahabudin. (2005) Degree thesis, thesis, Universiti Teknologi MARA.

The quotation process at project Giatmara / Nursyakirah Shamsudin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Users’ satisfaction towards facilities management services at federal buildings in Kedah / Nur Izzati Sharizan. (2021) [Student Project] (Unpublished)

Wall construction project at Gong Nangka, Mukim Kampung Raja, Daerah Besut, Terengganu / Muhammad Faiz Fakhruddin Shihabuddin. (2015) [Student Project]

Renovations: problems & solutions / Saromy Subry. (2001) Degree thesis, thesis, Universiti Teknologi MARA.

Kerja-kerja tanah / Fatin Suhana Suhaimi. (2008) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Tower footing stabilizer works / Muhamad 'Izzat Suhaimi. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Procedures of building plan approvals at Majlis Daerah Kuala Selangor / Norsuhadah Sukardi. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Building maintenance manual for Islamic Centre Institut Teknologi MARA Shah Alam Selangor Darul Ehsan / Kapten Ruslan Sulaiman. (1991) Advanced Diploma thesis, thesis, Universiti Teknologi MARA (UiTM).

A study on the problems of adopting industrialised building system in Malaysian construction / Sharifah Zulaina Syed Anuar. (2010) Degree thesis, thesis, Universiti Teknologi MARA.

W

Preventive maintenance and adhoc corrective in Menara Tabung Haji Tun Razak / Shafiyah Wan Md Suhaimi. (2018) [Student Project] (Unpublished)

Barriers in the development of the Malaysian brick industry / Wan Mohd Sabki Wan Omar, Che Sobry Abdullah and Umar Kassim. (2008) In: Proceedings STSS 2008 Broadening Horizons Through Research Social Sciences, 3 – 4 June 2008, M.S Garden Hotel Kuantan, Pahang.

Construction process of bungalow / Wan Nazirul Adlan Wan Zaini. (2015) [Student Project]

Y

Method construction of pile cap / Nurul Afiqah Natasha Yahaya. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The potential of carbon footprint reduction of a mid-rise residential building in Sarawak / Nurdiyanah Yaman and Ahmad Faiz Abd Rashid. (2021) Built Environment Journal (BEJ), 18 (1). pp. 1-14. ISSN 1675-5022

Risk management plan (RMP) : implementation and challenges towards sustainability and green concept for public projects in Terengganu / Yuhainis Abdul Talib, Siti Nirwana Mat Usof and Kharizam Ismail. (2015) In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, Dewan Kuliah Al-Khawarizmi Universiti Teknologi MARA Cawangan Perak.

Z

Construction of rugby field / Amir Mirza Zaifoll Anuar. (2021) [Student Project] (Unpublished)

The perception and benefits of building information modelling in construction industry case study of Petaling Jaya, Selangor / Nurizzati Syamimi Zaiful and Junainah Mohammad. (2023) In: UNSPECIFIED.

Administrative reform of Majlis Bandaraya Melaka Bersejarah in term of parking service / Amira Zainura Zainal Abidin and Mohd Khairul Insan Nazri. (2008) [Student Project] (Unpublished)

Finishing work in construction at PPR Melana Indah / Muhammad Firaz Zainal Abidin. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

Mechanical in building services: Permaisuri Resort & Hotel / Muhammad Kamil Akram Zainal Abidin. (2013) [Student Project]

Measurement for pad foundation and beam / Mohamad Daniel Adrian Zainodin. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Mosque Event Management System (MEMS) / Muhammad Azrilkhair Zainol Abidin. (2020) Degree thesis, thesis, Universiti Teknologi MARA, Terengganu.

Energy efficiency principle of tranditional Malay house / Nor 'Atikah Zainuddin. (2015) [Student Project] (Unpublished)

Building works and appraisals / Muhamad Azham Zakaria. (2017) [Student Project] (Unpublished)

ZS Enterprise / Zahrah Zakaria ... [et al.]. (1998) [Entrepreneurship Project] (Unpublished)

The barrier of facilities management for football stadium in Malaysia / Muhammad Zaiful Akmal Zamzuri. (2021) Degree thesis, thesis, Universiti Teknologi MARA, Perak.

Office renovation / Zikry Aiman Zulkefli. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Rock blasting practices in Malaysian quarry industries / Muhammad Farhan Zulkifli. (2009) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

The extension of time of Kajang 2 commuter station / Siti Aisyah Afifah Zulkifli. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The identification of facilities management standard service category for industry / Zuraihana Ahmad Zawawi ... [et al.]. (2016) Malaysian Journal of Sustainable Environment (MySE), 1. pp. 50-63. ISSN 0128-326X

This list was generated on Thu Nov 21 06:42:07 2024 UTC.