Abstract
The piling work, construction of foundation and ancillary work during this report is relevant because in the construction process there is this work. The explanation for this work has is about what to do in the piling activity, what should do after the piling work, how to conduct the piling, also after the construction foundation. The data used on the report can get by using interview method, from the method statement and from the internet search. in relation to what is often done, in the field of construction should follow the spec set by the client and rely on the law that UBBL 1984 is a building code which provides the minimum requirements for the control and construction of street, drainage and building in local authorities' areas.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Mohd Noor, Muhammad Haikal 2019210146 |
Contributors: | Contribution Name Email / ID Num. UNSPECIFIED Abdullah Halim, Anas Zafirol UNSPECIFIED UNSPECIFIED Hadzaman, Nor Asma Hafizah UNSPECIFIED UNSPECIFIED Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Buildings: Construction with reference to use.Including public buildings, dwellings |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | piling work, construction, foundation, ancillary work |
Date: | 2022 |
URI: | https://ir.uitm.edu.my/id/eprint/85903 |