Building plan approval process at Majlis Perbandaran Taiping / Nursyazlia Ahmad Fauzi

Ahmad Fauzi, Nursyazlia (2022) Building plan approval process at Majlis Perbandaran Taiping / Nursyazlia Ahmad Fauzi. Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Abstract

Building plan approval is an important thing to do before the construction projects either a small or a big project can be started. Therefore, this report will discuss about the building approval process for the building based on Undang-Undang Kecil 18 (UUK18) which sketch plan for small construction, building renovation and small addition to the building will be presented as a plan replacement which have been approved by Majlis Perbandaran Taiping. The objective of this report is to determine the process of building plan approval and also the uses and types of the approval according to the building plan presented by the Principal Submitting Person (PSP). There is a price for each approval depends on the building construction types. After the plan have been approved, an approval letter will be issued so that the building can have its own authorization. This report will show how important the approval process in order to carry out the construction work and without this approval, the work cannot be done unless the permission was given by the municipal through this process.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 92164.PDF]
Text
92164.PDF
Download (1MB)
Indexing & Metrics