Items where Subject is "Construction equipment in building"
- Library of Congress Subject Areas (1)
- T Technology (1)
- TH Building construction (1)
- Construction equipment in building (163)
- TH Building construction (1)
- T Technology (1)
.
Artificial neural network-based modeling of a gantry crane system/ Wahyudi …[et al.]. (2006) In: Volume No. 1: Science and Technology, 30 – 31 May 2006, Swiss Garden Resort & Spa Kuantan, Pahang.
A
Building condition assessment at the asset of PKNP / Hajar Asikin Ab Azis. (2018) [Student Project]
Plan approval process / Nurulain Abd Ghani. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Modelling of the carrier mobility of L. Leucocephala Wood Plastic Composite (WPC) for photoconductive antenna / Busmina Balkis Abd Hadi. (2014) Masters thesis, thesis, Universiti Teknologi MARA (UiTM).
Method road construction process use bituminous premix / Hafizah Fitrah Abd Nasir. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Installation of RC column / Nurul Izzati Abd Rahim. (2020) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Dilapidation and repairing works / Nur Arisha Abd Rahman. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
The repairing construction of badminton court / Nor Farzana Abdul Ghafur. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Maintenance works done on exposed brickwork in historical building / Nurul Izza Abdul Ghani. (2005) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Storage tank erection / Muhammad Haikal Haziq Abdul Halim. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Advanced stand installation tools (ASIT) / Muhammad Abdul Jazmi Abdul Harrith. (2021) [Student Project]
Kajian ke atas nilai kadar pembaziran bahan binaan di tapak bina / Norsuzilawati Abdul Malek. (2002) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Pengurusan penyelenggaraan bangunan ITM Kelantan yang baru / Mohd. Aminudin Abdul Muluk. (1996) Degree thesis, thesis, Universiti Teknologi MARA.
Kaedah Pengeluaran Batu dari Kuari dan Kegunaannya / Kamarudzaman Abdullah. (2006) In: PROSIDING KOLOKIUM 2004-2006 UNIVERSITI TEKNOLOGI MARA CAWANGAN PAHANG.
Preliminary work at construction site / Nur Aiman Su’aidi Abu Bakar. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
The used of Acrylonitrile-Butadiene Styrene- (ABS) pipe in cold water supply system / Muhammad Arif Abu Hassan. (2008) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Zircon Tiles Enterprise / Norzainariah Abu Hassan ... [et al.]. (1999) [Entrepreneurship Project] (Unpublished)
Waterproofing system for shop houses / Aisyah Maheerah Ahmad. (2017) [Student Project]
Installation of chain-link fencing / Annas Shahimi Ahmad. (2021) [Student Project] (Unpublished)
Sirna Indah Sdn. Bhd / Mohd Khairil Izwan Ahmad... [et al.]. (1998) [Entrepreneurship Project] (Unpublished)
Construction and completion of anti-climb fencing at Pusat Kecemerlangan Lembaga Getah Malaysia (LGM) Lot 481, Mukim Sungai / Siti Syahirah Ahmad Badli Sah. (2017) [Student Project] (Submitted)
Building plan approval process at Majlis Perbandaran Taiping / Nursyazlia Ahmad Fauzi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Menara Sunway / Ahmad Izzulhafiz Musalakmal ... [et al.]. (2019) [Student Project] (Unpublished)
Indah Jubin Enterprise / Mohd Amzar Ariff Ahmad Zaim ... [et al.]. (2003) [Entrepreneurship Project] (Unpublished)
Construction of reinforced concrete slab / Aiman Ahmad Zawawi. (2017) [Student Project]
X-Piles Concrete Sdn Bhd / Siti Zubairiyah Al-Zubir ... [et al.]. (2003) [Entrepreneurship Project] (Unpublished)
The study on operational and safety of heavy machinery in construction site / Adrian Charles Alidin. (2010) Degree thesis, thesis, Universiti Teknologi MARA.
Laporan cadangan merekabentuk baru Aura Seri Spa Aromatherapy & Beauty Dino. 7, Lorong 1617C, 46350 Petaling Jaya, Selangor Darul Ehsan untuk Tetuan Aura Seri Spa @ Beauty / Muna Azraa Amran. (2006) [Student Project] (Unpublished)
Lightweight gypsum brick / Mohd Iqmal Shah Ardiansah and Sallehan Ismail. (2023) In: UNSPECIFIED.
Study of trend facilities in the shopping complexes / Khairul Nizam Arshad. (2003) Degree thesis, thesis, Universiti Teknologi MARA.
The impact of material price fluctuation on housing projects / Aiman Azahar and Ahmad Qusoiri Abdul Karim. (2023) In: UNSPECIFIED.
The installation of pad foundation / Muhammad Aiman Azami. (2017) [Student Project] (Unpublished)
Demolition works at Jalan Sengkang, Pekan Pagoh, Muar, Johor / Mohd Nizham Aziz. (2016) [Student Project]
Implementation of personal protective equipment (PPE) for safety aspect among labour in Bukit Kor, Terengganu / Muhammad Seri Afiq Azlan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Construction project cost estimation software utilization in construction industry / Khairul Izzuddin Shah Azman Shah. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
B
Cold room system for Dewan Makan Siswa UiTM / Faitulmuen Burhanudin and Mohd. Rashid Halim. (2002) [Student Project] (Unpublished)
C
Study on facilities in orphanage homes / Zati Nur Diyana Che Shopi. (2010) Degree thesis, thesis, Universiti Teknologi MARA.
Pad foundation construction / Nurul Amirah Nasyarah Che Zailan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The proposed designs modular of low-cost workers camp housed by using recycling container at the construction site / Jacksmith L. drecksson Claudius and Zainal Abidin Akasah. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch. (Unpublished)
D
Utara Pillar’s Enterprise / Evy Nadzeliza Dziaudin ... [et al.]. (2002) [Entrepreneurship Project] (Unpublished)
F
Floor finishes / Eddie Firdaus Farid. (2017) [Student Project]
Bus stop construction and maintenance / Nur Dayana Firdaus. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
G
Facilities management in sport training centre / Norliana Ghani. (2008) Degree thesis, thesis, Universiti Teknologi MARA.
H
Performance and analysis of newly designed pump seating for centrifugal pump operation / Nabilah Hamidan. (2017) [Student Project] (Submitted)
Retrofitting old shop houses using Building Information Modelling (BIM) for improving building construction / Endok siti nurul shafiqah ... [et al.]. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.
Pengurusan bahan binaan di tapak bina / Rosdi Hassan. (2009) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Attract Tiles Supplier Sdn. Bhd / Hairul Lisa Hj Abd Latif ... [et al.]. (2002) [Entrepreneurship Project] (Unpublished)
Mosaic installation tool / Juliyana Hussin … [et al.]. (2013) In: Optimizing Innovation for Global Commercialization Research, Invention, Innovation Design: RIID 2013. Division of Research, Industrial Linkages and Alumni, UiTM Cawangan Melaka, Alor Gajah, Melaka, p. 40. ISBN 978-967-0637-02-0 (Submitted)
Tiles finishes / Nizam Hairi Hussin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
I
Numerical investigation on the effect of building overhang on the flow within idealised two-dimensional street canyon / Muhammad Fatih Ibrahim …[et al.]. (2021) ESTEEM Academic Journal, 17: 11. pp. 67-77. ISSN 2289-4934
Contract administration for the construction of a bungalow house in Asam Kumbang Taiping, Perak Darul Ridzuan / Noor Fatehah Idris. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Challenges faced by G1 contractors / Fatin Nabilah Imam and Mohd Esham Mamat. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.
Scaffolding's safety in the construction of high rise building / Mohd. Rosmizar Ishak. (2005) Degree thesis, thesis, Universiti Teknologi MARA.
Effect of using crushed concrete roof tiles as coarse aggregates on properties of concrete / Manaff Mohd Ismail, Hamidah Mohd Saman and Azmi Ibrahim. (2002) In: Prosiding Seminar Kebangsaan Sains,Teknologi dan Sains Sosial “Ke Arah Pembangunan Negara”, 27 dan 28 Mei 2002, Hotel Vistana, Kuantan, Pahang.
Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail. (2012) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
RC column and beam construction / Noor Ismanajwa Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
A study on service quality of refurbishment contractors towards clients at public institutions of higher education / Sallehan Ismail, Mohamad Hamdan Othman and Sufian Che Amat. (2010) [Research Reports] (Submitted)
J
The construction method for staircase and floor slab / Atiqah Wajihah Jaffri. (2021) [Student Project] (Unpublished)
Steel structures / Nurul Zafirah Jamaluddin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Motivation of quantity surveyor in the Malaysian construction industry towards job satisfaction / Siti Azimah Jamhari and Husrul Nizam Husin @ Hussain. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.
Fundamentals of Entrepreneurship ENT300 Abram Cement Enterprise / Nick Mattaaari Jefri... [et al.]. (2011) [Entrepreneurship Project] (Unpublished)
Application of formwork systems for lot 1881 & 1882 at Mont Kiara / Benedict Sandin Joseph Garan. (2015) [Student Project]
A study on knowledge of the fire evacuation for occupant in commercial high rise building / Mohd Redhuan Jusoh. (2010) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
K
Trupro Enterprise / Nor Nizaha Kamaruddin... [et al.]. (2002) [Entrepreneurship Project] (Unpublished)
A framework of the economic factors and cost in the implementation of mechanisation and automation (M&A) in Industrialised Building System (IBS) approach / Siti Syariazulfa Kamaruddin. (2018) In: The Doctoral Research Abstracts. IGS Biannual Publication, 14 . Institute of Graduate Studies, UiTM, Shah Alam.
Enhancing energy efficiency through the incorporation of maqasid syariah knowledge: a review / Mohd Zin Kandar ... [et al.]. (2023) Malaysian Journal of Sustainable Environment (MySE), 10 (1). pp. 171-190. ISSN 0128-326X
Teknik macrame sebagai suatu kaedah pembaharuan di dalam fiber pada masa kini / Rahayu Karim. (1992) Diploma thesis, thesis, Universiti Teknologi MARA.
Method construction of pad foundation / Nur Naimie Nadjwa Khairuddin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Perception on dilapidated building toward the safety of residents and nearby community: case study Waller Court, Ipoh, Perak / Wan Ezmira Farhanah Khairul Fuad. (2023) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Design of an iron nail holder / Zaid Khalid. (2010) Degree thesis, thesis, Universiti Teknologi MARA.
A building control point of view on demolition of full precast concrete buildings in Hong Kong / Kung Shu-hang, Raymond and Wu Po-tak, Alex. (2012) In: 1st International Conference on Innovation and Technology for Sustainable Built Environment 2012 (ICITSBE 2012), 16-17 April 2012, Universiti Teknologi MARA Cawangan Perak.
M
Construction of RC staircase for fire exit route at Petronas Research Sdn Bhd, Bangi / Muhammad Badri Maarof. (2017) [Student Project]
A study of waterproofing material on toilet / bathroom area / Abdul Razak Mahal. (2005) [Student Project] (Unpublished)
Effect of adapting sustainable construction materials on houses in tropical climates: case study of S11 House, Selangor, Malaysia / Muhammad Zulhelmi Maimun, Farah Hanna Ahmad Fuad and Murni Zainal. (2023) In: UNSPECIFIED.
Efficiency and effectiveness of liquified natural gas (LNG) supply system for hotel buildings / Azuan Mat Omar. (2007) Degree thesis, thesis, Universiti Teknologi MARA.
Reinforcement bar measurement in structural concrete using Ground Penetrating Radar method / Mohd Redzwan Mat Sah. (2005) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
The life cycle cost for generator set / Khairul Ariffin Mat Zain. (2003) Degree thesis, thesis, Universiti Teknologi MARA.
Magnetic linear tool (MagTool) / Nur Amirah Damia binti Md Nasser and Hayroman bin Ahmad. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.
Building apparaisal of precast concrete construction / Azras Md Shah. (2006) Degree thesis, thesis, MARA University of Technology.
Smart handling equipment / Muhammad Zulhadzhim Md Sharif. (2021) [Student Project]
Perkasa Enterprise / Noor Ibrahim Md Isa ... [et al.]. (2003) [Entrepreneurship Project] (Unpublished)
The determination of labour productivity for a selected construction operation i.e. plastering work for a housing project / Norlida Saad Md. Saad. (1992) Advanced Diploma thesis, thesis, Universiti Teknologi MARA (UiTM).
Perkasa Steel Engineering Sdn. Bhd.: steel structure / Suzailey Aishah Mhd Salim... [et al.]. (2007) [Entrepreneurship Project] (Unpublished)
Future Vision Sdn. Bhd. : water gutter tank services / Masrina Milhamad Hudri ... [et al.]. (2001) [Entrepreneurship Project] (Unpublished)
The construction training centres in providing local skilled manpower / Farrah Fazini Mohamad. (2004) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Adaptive reuse of heritage timber building : the need of modern technology / Juliza Mohamad. (2012) In: The 9th Regional Symposium of the Malay Archipelago, 11-12 December 2012, Al Khawarizmi Lecture Hall, UiTM Perak.
Piling Tool Graph Set / Noraisyah Mohamad … [et al.]. (2012) In: RIID 2012: Innovation For Sustainable Growth. Bahagian Penyelidikan dan Jaringan Industri, UiTM Melaka, Alor Gajah, p. 31. (Unpublished)
Construction process of beam and slab in Kompleks Belia dan Sukan Negeri Terengganu / Nurulhidayah Mohamad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Istiqamah Enterprise / Mohd Khairul Anwar Mohamad Nor ... [et al.]. (2004) [Entrepreneurship Project] (Unpublished)
Installation of precast reinforcement concrete (RC) piles at Stadium Bola Sepak Kompleks Sukan Seri Manjung / Daniel Iskandar Hakimie Mohamad Roshidi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Project management; monitoring and controlling setback at construction site Nizaha, Taiping / Nur Athirah Fatin Mohayidin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Dilapidation survey and inspection at Sentul Kuala Lumpur / Nur Alyaa Mohd Alkusari. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Perwira Industries Sdn. Bhd. : precast concrete piles / Darus Mohd Fadzli... [et al.]. (2002) [Entrepreneurship Project] (Unpublished)
Smart scaffolding / Muhammad Afiq Mohd Farid and Nor Azizah Talkis. (2023) In: UNSPECIFIED.
Late and non-payments issues in the Malaysian construction industry : perspective of building material suppliers / Mohd Fisal Ishak, Kartina Alauddin and Mohd Shahrol Hafiz Ibrahim. (2019) Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 39-56. ISSN 0128-326X
The contractors’ attributes for the construction project success / Mohd Hafiz Saberi ... [et al.]. (2015) In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, Dewan Kuliah Al-Khawarizmi Universiti Teknologi MARA Cawangan Perak.
Study on building profesionals’ cognizance towards the use of recycled aggregate concrete in building construction / Nur Afina Syahirah Mohd Hashim. (2022) [Student Project]
Industrialized building system (IBS) / Nur Fatin Syafiqah Mohd Hasni Hamizi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Uniscaff stairfold / Nurhazwani Mohd Hasnin and Mohd Fareh Majid. (2023) In: UNSPECIFIED.
Golden Venture Enterprise / Mohd Aziezul Izam Mohd Huda... [et al.]. (2000) [Entrepreneurship Project] (Unpublished)
Highly developed safety vest for construction high-rise building / Fatin Hazira Mohd Jamil. (2021) [Student Project]
Identification on the compressive strength of stabilized compacted soil by using traditional admixture as alternative material in industry / Mohd Mawardi Mohd Kamal, Normadiana Mohammad Hanapi and Mohd Amzari Yaccob. (2014) In: Prosiding KONAKA Konferensi Akademik 2014, 28 Oktober 2014, UiTM Pahang.
Sources of risk in construction project development / Noor Hafizah Mohd Noor. (2007) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Pearl Glasses Enterprise / Che Suriyani Mohd Nor... [et al.]. (2003) [Entrepreneurship Project] (Unpublished)
Kajian mengenai penggunaan kayu di bawah Peruntukan Undang-Undang Kecil Bangunan Seragam 1984 di dalam industri perumahan di Malaysia / Md. Arif Fabillah Mohd Nor. (1995) [Student Project] (Unpublished)
The effectiveness of CCTV implementation by municipal council for public safety / Mohd Noor Adam Mohd Nordin. (2008) [Student Project] (Unpublished)
Northern Glass Enterprise / Azarul Azlan Mohd Radhi ... [et al.]. (1999) [Entrepreneurship Project] (Unpublished)
Preparing A Vacant Possession for M1 MSN Development Sdn. Bhd. / Nur Ain Darwisyah Mohd Saufi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
The unsuccessful shopping centre : ruling out the phenomena and causes / Muhammad Zulhilmi Mohd Yusof and Aida Affina Abd Ghani. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.
Manufacture of steel structure / Mohd Nadhir Mohd Zaini. (2015) [Student Project]
Study of solid waste disposal system in high-rise buildings between conventional system and Centralize Vacuum System (CVS) / Ahmad Anwar Mohd Zaki. (2009) [Student Project] (Unpublished)
Building plan approval process / Nur Azreen Mohd Zurab. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Creep and shrinkage behaviour of normal strength concrete / Nor Maslina Mohsan, Khalimi Johan Abd Hamid and Nurul Huda Suliman. (2010) In: Prosiding KONAKA Konferensi Akademik 2010, 8-9 Disember 2010, UiTM PAHANG.
Investigation on the integrity of the reinforced concrete slab at the former civil engineering laboratory building / Fadhluhartini Muftah, Marzuki Ab. Rahman and Mohd Syahrul Hisyam Mohd Sani. (2010) In: Prosiding KONAKA Konferensi Akademik 2010, 8-9 Disember 2010, UiTM PAHANG.
Construction health and safety management for the construction of public toilet in Rembau district / Nur Aina Nasuha Muhamad Shah. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Post-inspection work after handing over process / Muhammad Azizul Haqim Ramli. (2017) [Student Project] (Unpublished)
The usage of polyurethane injection in waterproofing works / Izzati Thaqifah Muhammad Rosdi. (2016) [Student Project]
On site manufacturing (OSM) construction through lifting system for a modern high-rise building / Muhammad Fauzan Naim Murad and Mohd Rofdzi Abdullah. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, UiTM Perak. (Unpublished)
Installation method of unipaver interlocking paver / Nur Fatihah Murad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
N
Swing latch jig / Md Zaimarudin Ngah. (1985) [Student Project] (Unpublished)
The process and maintenance of a residential houses of Presint 10, Putrajaya / Nik Najwa Nik Fazri Namili. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
The construction process of pad footing for 1 unit semi detached house / Nik Mohamed Syahmi Nik Mohamed Shaifuddin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Nothern Aluminium Enterprise : fixing aluminium, glasses & PVC / Faizal Noh ... [et al.]. (2003) [Entrepreneurship Project] (Unpublished)
Building condition assesment / Nur Alysha Nor Azham. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
The installation of reinforced concrete slab / Nor Haifa Nor Lizan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Wall material used for a two-storey house at Parit Haji Talib (AAC block and sand lime brick) / Nur A’reesyia Mardhiah Norazemi. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Tender bidding failure: the case of OTIS Elevator (M) Sdn Bhd / Nurul Aini Norazman. (2013) [Student Project] (Unpublished)
MNS Tiles Enterprise / Norfadli Nordin ... [et al.]. (1999) [Entrepreneurship Project] (Unpublished)
Personal Protective Equipment (PPE) at port / Razeen Rafiqi Nordin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Technology of house lifting for relocation purposes / Nur Syarfa Romli. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.
P
Design tool in T&L: RC retaining wall / Mohamad Irwan P. Harahap and Felix Ling. (2020) In: UNSPECIFIED.
Safety boot with pressure sensor LED light / Sharmilah Pilson and Azira Ibrahim. (2023) In: UNSPECIFIED.
R
Method of reinforced concrete (column) / Nur Farzana Ayina Rahimie. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Factors and effects of delays in supplying construction materials from the supplier's perspective in Selangor / Abdu Alrazak Ramli. (2021) [Student Project] (Unpublished)
Selfclimbing scaffolding / Nor Ainaa Nabilah Razaki. (2021) [Student Project]
The catalyst for property development in Bandar Tasik Selatan / Munirah Rosli. (2010) Degree thesis, thesis, Universiti Teknologi MARA.
Implementation of green 5s manual in construction work at Perla Ara Sentral Site / Nur Amirah Roslim. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Blueprint : DuSe LADDER / Amirah Hazwani Roslin. (2020) [Entrepreneurship Project] (Unpublished)
The effects from the usage of construction materials towards the environmental degradation / Nurelisma Sharina Rozmi and Natasha Khalil. (2023) In: UNSPECIFIED.
S
The procedure of building plan approval for factory / Nur Arisa Saifullizan. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Safety and health in Sarawak construction industry: potential risk in scaffolding system / Allisa Sajat. (2021) [Student Project] (Unpublished)
Blueprint : Hammer Magnetic Gloves / Khairil Aiman Faris Salim. (2020) [Entrepreneurship Project] (Unpublished)
Preparation of tender document / Nur Diana Sallehuddin. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)
Advance mini trench machine / Muhamaad Fardhillah Samsudin. (2021) [Student Project]
The effectiveness of ready mixed concrete / Norazman Shahabudin. (2005) Degree thesis, thesis, Universiti Teknologi MARA.
Adjustable facade handling track / Suaidah Shima Shahrin. (2021) [Student Project]
Construction of covered walkway at Jalan Hang Jebat infrastructure at PNB 118, Kuala Lumpur / Muhammad Zulfadzli Shamsulanizam. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Submitted)
Flexural performance of RC beams with near surface mounted CFRP plate under tropical climate effects / Nauwal Suki. (2018) PhD thesis, thesis, Universiti Teknologi MARA (UiTM).
U
Puncak Teguh Cable Sdn. Bhd / Mohd Niqwan Uda Noor Abdul Karim... [et al.]. (2005) [Entrepreneurship Project] (Unpublished)
W
Energy efficient lighting system for building / Wan Norsyafizan W. Muhamad, Zulzilawati Jusoh and Mohamad Yusof Mat Zain. (2010) [Research Reports] (Unpublished)
A study on crane collapse in construction industry / Wan Azlinda W.Omar. (2015) [Student Project] (Unpublished)
Floor slab construction / Ahmad Aiman Wafiq Zainan. (2021) [Student Project] (Unpublished)
Contractual behaviour framework for successful civil engineering projects / Wan Norizan Wan Ismail. (2021) PhD thesis, thesis, Universiti Teknologi MARA.
Construction process of bungalow / Wan Nazirul Adlan Wan Zaini. (2015) [Student Project]
Y
The implementation of electrical energy conservation in industrial and commercial buildings / Beny Yusmar. (2009) [Student Project] (Unpublished)
Z
A study on energy use (Electricity) in residential buildings / Mohamad Hilman Azwan Zainal Abidin. (2010) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Idyllic Tiles Enterprise / Intan Izida Zainal Amran ... [et al.]. (2002) [Entrepreneurship Project] (Unpublished)
Dinamic Kraft Sdn Bhd / Muhammad Imannuddin Zainol Abidin... [et al.]. (2001) [Entrepreneurship Project] (Unpublished)
Building works and appraisals / Muhamad Azham Zakaria. (2017) [Student Project] (Unpublished)
Assessing worker safety procedure of scaffold usage at the construction / Norzuliani Zakaria. (2014) [Student Project] (Unpublished)
Industrialized building system (IBS) : project proposed construction and completion two-levels building of Jabatan Audit Negara for Terengganu / Mohd Zazmir Ikhzal Zamri. (2017) [Student Project] (Unpublished)
Method of piling constructions (timber mangrove pile) / Nur Anis Farzana Zulkiflee. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.
Blockwork laying an AAC block / Muhammad Zulhaziq Zulkurnain. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)