Items where Subject is "Construction equipment in building"

Group by: Creators | Item Type
Jump to: A | B | C | D | F | G | H | I | J | K | M | N | O | R | S | T | U | W | Y | Z
Number of items at this level: 103.

A

Pengurusan penyelenggaraan bangunan ITM Kelantan yang baru / Mohd. Aminudin Abdul Muluk. (1996) Degree thesis, thesis, Universiti Teknologi MARA.

The study on operational and safety of heavy machinery in construction site / Adrian Charles Alidin. (2010) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

The used of Acrylonitrile-Butadiene Styrene- (ABS) pipe in cold water supply system / Muhammad Arif Abu Hassan. (2008) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

Laporan cadangan merekabentuk baru Aura Seri Spa Aromatherapy & Beauty Dino. 7, Lorong 1617c, 46350 Petaling Jaya, Selangor Darul Ehsan Untuk Tetuan Aura Seri Spa @ Beauty / Muna Azraa Amran. (2006) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

Kajian ke atas nilai kadar pembaziran bahan binaan di tapak bina / Norsuzilawati Abdul Malek. (2002) Degree thesis, thesis, Universiti Teknologi MARA.

Building condition assessment at the asset of PKNP / Hajar Asikin Ab Azis. (2018) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara, Perak.

Testing and commissioning procedure on installation of single tower crane / Noor Azira Abdul Aziz. (2014) Industrial Training. Universiti Teknologi Mara, Perak.

Building condition survey of Sri Cemerlang Bungalow House / Muhammad Hazim Abdul Ghafar. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Advanced stand installation tools (ASIT) / Muhammad Abdul Jazmi Abdul Harrith. (2021) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perak.

Method of construction synthetic field / Ain Nurul Ashikin Abdul Rasid. (2014) Industrial Training. Universiti Teknologi Mara, Perak.

Kaedah Pengeluaran Batu dari Kuari dan Kegunaannya / Kamarudzaman Abdullah. (2006) In: PROSIDING KOLOKIUM 2004-2006 UNIVERSITI TEKNOLOGI MARA CAWANGAN PAHANG.

Zircon Tiles Enterprise / Norzainariah Abu Hassan ... [et al.]. (1999) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

Waterproofing system for shop houses / Aisyah Maheerah Ahmad. (2017) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara, Perak.

Sirna Indah Sdn. Bhd / Mohd Khairil Izwan Ahmad... [et al.]. (1998) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perlis. (Unpublished)

Menara Sunway / Ahmad Izzulhafiz Musalakmal ... [et al.]. (2019) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara,Perak. (Unpublished)

Indah Jubin Enterprise / Mohd Amzar Ariff Ahmad Zaim ... [et al.]. (2003) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

Construction of reinforced concrete slab / Aiman Ahmad Zawawi. (2017) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara, Perak.

X-Piles Concrete Sdn Bhd / Siti Zubairiyah Al-Zubir ... [et al.]. (2003) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perlis. (Unpublished)

Study of trend facilities in the shopping complexes / Khairul Nizam Arshad. (2003) Degree thesis, thesis, Universiti Teknologi MARA.

The installation of pad foundation / Muhammad Aiman Azami. (2017) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara, Perak. (Unpublished)

Demolition works at Jalan Sengkang, Pekan Pagoh, Muar, Johor / Mohd Nizham Aziz. (2016) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara, Perak.

Construction project cost estimation software utilization in construction industry / Khairul Izzuddin Shah Azman Shah. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.

B

Cold room system for Dewan Makan Siswa UiTM / Faitulmuen Burhanudin and Mohd. Rashid Halim. (2002) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara. (Unpublished)

C

Study on facilities in orphanage homes / Zati Nur Diyana Che Shopi. (2010) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

The proposed designs modular of low-cost workers camp housed by using recycling container at the construction site / Jacksmith L. drecksson Claudius and Zainal Abidin Akasah. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch. (Unpublished)

D

Utara Pillar’s Enterprise / Evy Nadzeliza Dziaudin ... [et al.]. (2002) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perlis. (Unpublished)

F

Proposed to construct rehabilitation building at Klinik Kesihatan (KK3) Tunjang, 06000 Jitra, Kedah Darul Aman / Nur Fazilah Fadzil. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Floor finishes / Eddie Firdaus Farid. (2017) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perak.

G

Facilities management in sport training centre / Norliana Ghani. (2008) Degree thesis, thesis, Universiti Teknologi MARA.

H

Pengurusan bahan binaan di tapak bina / Rosdi Hassan. (2009) Degree thesis, thesis, Universiti Teknologi MARA.

Performance and analysis of newly designed pump seating for centrifugal pump operation / Nabilah Hamidan. (2017) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Submitted)

Retrofitting old shop houses using Building Information Modelling (BIM) for improving building construction / Endok siti nurul shafiqah ... [et al.]. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

Attract Tiles Supplier Sdn. Bhd / Hairul Lisa Hj Abd Latif ... [et al.]. (2002) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

I

Contractor acceptance on Industrialised Building System (IBS) in construction industry / Muhammad Aizat Ismail. (2012) Masters thesis, thesis, Universiti Teknologi MARA.

Numerical investigation on the effect of building overhang on the flow within idealised two-dimensional street canyon / Muhammad Fatih Ibrahim …[et al.]. (2021) ESTEEM Academic Journal, 17: 11. pp. 67-77. ISSN 2289-4934

Challenges faced by G1 contractors / Fatin Nabilah Imam and Mohd Esham Mamat. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

Scaffolding's safety in the construction of high rise building / Mohd. Rosmizar Ishak. (2005) Degree thesis, thesis, Universiti Teknologi MARA.

J

A study on knowledge of the fire evacuation for occupant in commercial high rise building / Mohd Redhuan Jusoh. (2010) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

Motivation of quantity surveyor in the Malaysian construction industry towards job satisfaction / Siti Azimah Jamhari and Husrul Nizam Husin @ Hussain. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

Fundamentals of Entrepreneurship ENT300 Abram Cement Enterprise / Nick Mattaaari Jefri... [et al.]. (2011) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak. (Unpublished)

Application of formwork systems for lot 1881 & 1882 at Mont Kiara / Benedict Sandin Joseph Garan. (2015) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perak.

K

A framework of the economic factors and cost in the implementation of mechanisation and automation (M&A) in Industrialised Building System (IBS) approach / Siti Syariazulfa Kamaruddin. (2018) In: The Doctoral Research Abstracts. IGS Biannual Publication, 14 . Institute of Graduate Studies, UiTM, Shah Alam.

Trupro Enterprise / Nor Nizaha Kamaruddin... [et al.]. (2002) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

Teknik macrame sebagai suatu kaedah pembaharuan di dalam fiber pada masa kini / Rahayu Karim. (1992) Diploma thesis, thesis, Universiti Teknologi MARA.

Design of an iron nail holder / Zaid Khalid. (2010) Degree thesis, thesis, Universiti Teknologi MARA.

A building control point of view on demolition of full precast concrete buildings in Hong Kong / Kung Shu-hang, Raymond and Wu Po-tak, Alex. (2012) In: 1st International Conference on Innovation and Technology for Sustainable Built Environment 2012 (ICITSBE 2012), 16-17 April 2012, Universiti Teknologi MARA Cawangan Perak.

M

Efficiency and effectiveness of liquified natural gas (LNG) supply system for hotel buildings / Azuan Mat Omar. (2007) Degree thesis, thesis, Universiti Teknologi MARA.

Study of solid waste disposal system in high-rise buildings between conventional system and Centralize Vacuum System (CVS) / Ahmad Anwar Mohd Zaki. (2009) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

Kajian mengenai penggunaan kayu di bawah Peruntukan Undang-Undang Kecil Bangunan Seragam 1984 di dalam industri perumahan di Malaysia / Md. Arif Fabillah Mohd Nor. (1995) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

Construction of RC staircase for fire exit route at Petronas Research Sdn Bhd, Bangi / Muhammad Badri Maarof. (2017) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara, Perak.

A study of waterproofing material on toilet / bathroom area / Abdul Razak Mahal. (2005) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

The life cycle cost for generator set / Khairul Ariffin Mat Zain. (2003) Degree thesis, thesis, Universiti Teknologi MARA.

Magnetic linear tool (MagTool) / Nur Amirah Damia binti Md Nasser and Hayroman bin Ahmad. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

Building apparaisal of precast concrete construction / Azras Md Shah. (2006) Degree thesis, thesis, MARA University of Technology.

Smart handling equipment / Muhammad Zulhadzhim Md Sharif. (2021) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perak.

Perkasa Enterprise / Noor Ibrahim Md Isa ... [et al.]. (2003) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

Perkasa Steel Engineering Sdn. Bhd.: steel structure / Suzailey Aishah Mhd Salim... [et al.]. (2007) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perlis. (Unpublished)

Future Vision Sdn. Bhd. : water gutter tank services / Masrina Milhamad Hudri ... [et al.]. (2001) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

Adaptive reuse of heritage timber building : the need of modern technology / Juliza Mohamad. (2012) In: The 9th Regional Symposium of the Malay Archipelago, 11-12 December 2012, Al Khawarizmi Lecture Hall, UiTM Perak.

Installation of brickwall for Spice Hotel on Jalan Tun Dr Awang , Mukim 12 Daerah Barat Daya Pulau Pinang / Mohamad Irwan Mohamad Azlan Shah. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Istiqamah Enterprise / Mohd Khairul Anwar Mohamad Nor ... [et al.]. (2004) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

Perwira Industries Sdn. Bhd. : precast concrete piles / Darus Mohd Fadzli... [et al.]. (2002) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perlis. (Unpublished)

Late and non-payments issues in the Malaysian construction industry : perspective of building material suppliers / Mohd Fisal Ishak, Kartina Alauddin and Mohd Shahrol Hafiz Ibrahim. (2019) Malaysian Journal of Sustainable Environment (MySE), 6 (1). pp. 39-56. ISSN 0128-326X

The contractors’ attributes for the construction project success / Mohd Hafiz Saberi ... [et al.]. (2015) In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, Dewan Kuliah Al-Khawarizmi Universiti Teknologi MARA Cawangan Perak.

Golden Venture Enterprise / Mohd Aziezul Izam Mohd Huda... [et al.]. (2000) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

Highly developed safety vest for construction high-rise building / Fatin Hazira Mohd Jamil. (2021) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perak.

Refurbishment work at Pasar Siti / Nur Shalsabila Mohd Nawi. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Pearl Glasses Enterprise / Che Suriyani Mohd Nor... [et al.]. (2003) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perlis. (Unpublished)

The effectiveness of CCTV implementation by municipal council for public safety / Mohd Noor Adam Mohd Nordin. (2008) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

Northern Glass Enterprise / Azarul Azlan Mohd Radhi ... [et al.]. (1999) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

The unsuccessful shopping centre : ruling out the phenomena and causes / Muhammad Zulhilmi Mohd Yusof and Aida Affina Abd Ghani. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

Manufacture of steel structure / Mohd Nadhir Mohd Zaini. (2015) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perak.

Investigation on the integrity of the reinforced concrete slab at the former civil engineering laboratory building / Fadhluhartini Muftah, Marzuki Ab. Rahman and Mohd Syahrul Hisyam Mohd Sani. (2010) In: Prosiding KONAKA Konferensi Akademik 2010, 8-9 Disember 2010, UiTM PAHANG.

Post-inspection work after handing over process / Muhammad Azizul Haqim Ramli. (2017) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara, Perak. (Unpublished)

The usage of polyurethane injection in waterproofing works / Izzati Thaqifah Muhammad Rosdi. (2016) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara, Perak.

Inspection process and procedure in architecture work on the Residence Condominium, Bukit OUG, Kuala Lumpur / Marni Ainin Syahirah Muksain. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

On site manufacturing (OSM) construction through lifting system for a modern high-rise building / Muhammad Fauzan Naim Murad and Mohd Rofdzi Abdullah. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, UiTM Perak. (Unpublished)

N

Nothern Aluminium Enterprise : fixing aluminium, glasses & PVC / Faizal Noh ... [et al.]. (2003) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

MNS Tiles Enterprise / Norfadli Nordin ... [et al.]. (1999) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perlis. (Unpublished)

Technology of house lifting for relocation purposes / Nur Syarfa Romli. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

O

Revitalization of Old Township, Little India, Ipoh / Nurul Maizatul Akmar Omarzaki. (2021) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

R

Selfclimbing scaffolding / Nor Ainaa Nabilah Razaki. (2021) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perak.

Renovation work process at Pusat Ilmu, Headquaters of Mardi Serdang, Selangor / Ainnur Amirah Roslan. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

The catalyst for property development in Bandar Tasik Selatan / Munirah Rosli. (2010) Degree thesis, thesis, Universiti Teknologi MARA.

Door construction for commercial building / Nur Shafiqah Rosli. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Blueprint : DuSe LADDER / Amirah Hazwani Roslin. (2020) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Kelantan. (Unpublished)

S

The effectiveness of ready mixed concrete / Norazman Shahabudin. (2005) Degree thesis, thesis, Universiti Teknologi MARA.

Blueprint : Hammer Magnetic Gloves / Khairil Aiman Faris Salim. (2020) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Kelantan. (Unpublished)

Advance mini trench machine / Muhamaad Fardhillah Samsudin. (2021) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perak.

Adjustable facade handling track / Suaidah Shima Shahrin. (2021) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perak.

T

Process of building condition assessment / Muhammad Saifuddin Tukirin. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

U

Puncak Teguh Cable Sdn. Bhd / Mohd Niqwan Uda Noor Abdul Karim... [et al.]. (2005) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

W

Energy efficient lighting system for building / Wan Norsyafizan W. Muhamad, Zulzilawati Jusoh and Mohamad Yusof Mat Zain. (2010) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Terengganu. (Unpublished)

A study on crane collapse in construction industry / Wan Azlinda W.Omar. (2015) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

Contractual behaviour framework for successful civil engineering projects / Wan Norizan Wan Ismail. (2021) PhD thesis, thesis, Universiti Teknologi MARA.

Construction process of bungalow / Wan Nazirul Adlan Wan Zaini. (2015) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA, Perak.

Y

The implementation of electrical energy conservation in industrial and commercial buildings / Beny Yusmar. (2009) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

Z

A study on energy use (Electricity) in residential buildings / Mohamad Hilman Azwan Zainal Abidin. (2010) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

Idyllic Tiles Enterprise / Intan Izida Zainal Amran ... [et al.]. (2002) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

Dinamic Kraft Sdn Bhd / Muhammad Imannuddin Zainol Abidin... [et al.]. (2001) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara Perlis. (Unpublished)

Building works and appraisals / Muhamad Azham Zakaria. (2017) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara, Perak. (Unpublished)

Assessing worker safety procedure of scaffold usage at the construction / Norzuliani Zakaria. (2014) UNSPECIFIED thesis, thesis, Universiti Teknologi MARA. (Unpublished)

Industrialized building system (IBS) : project proposed construction and completion two-levels building of Jabatan Audit Negara for Terengganu / Mohd Zazmir Ikhzal Zamri. (2017) UNSPECIFIED thesis, thesis, Universiti Teknologi Mara, Perak. (Unpublished)

This list was generated on Thu Aug 18 15:15:43 2022 UTC.