Construction and completion of anti-climb fencing at Pusat Kecemerlangan Lembaga Getah Malaysia (LGM) Lot 481, Mukim Sungai / Siti Syahirah Ahmad Badli Sah

Ahmad Badli Sah, Siti Syahirah (2017) Construction and completion of anti-climb fencing at Pusat Kecemerlangan Lembaga Getah Malaysia (LGM) Lot 481, Mukim Sungai / Siti Syahirah Ahmad Badli Sah. [Student Project] (Submitted)
Abstract

Enabling works is a must for a huge construction. This report will discuss the construction of Anti Climb Fencing along Persiaran Cakeralawa, Subang Bestari. The purpose of this report is to investigate the requirement resources to construct anti-climb fencing, the equipment, and material used. This report will focus on the problems encountered and the solution method during the work for each phase of construction. The purpose of this report is to investigate the requirement resources to construct anti-climb fencing, the equipment, and material used, and also to explain the procedure work before, during and after the construction. The main objective of the report is to illustrate the construction method of anti-climb fencing. Observation and interview session on site had been done as one of the methods to collect data and information in order to produce this report.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 77730.pdf]
Text
77730.pdf
Download (1MB)
Location & Physical Holdings
Digital Copy
Physical Location
  • Bilik Koleksi Akses Terhad, PTAR Kampus Seri Iskandar, Perak
Item Status
Processing
Indexing & Metrics