Defect studies during defect liability period / Muhammad Aliff Imran Suardi

Suardi, Muhammad Aliff Imran (2019) Defect studies during defect liability period / Muhammad Aliff Imran Suardi. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Abstract

Defect Liability Period (DLP) is essential in every building as the warranty of the building. It is also the period a contractor is liable to make good the defects. Therefore, the aims and purposes of this report was to identify the types of defects in a building and to investigate the problems and solutions of every defect in this building. It was conducted at Avisena Women's and Children's Specialist Hospital. This report also will focus on all the works related to how to prevent defects in a building. As a result, the building will mainly be safe from any hazards in the future. In conclusion, DLP was shown to be an important role in a contract to keep a building safe.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 97699.pdf]
Text
97699.pdf
Download (14MB)
Indexing & Metrics