Suardi, Muhammad Aliff Imran
(2019)
Defect studies during defect liability period / Muhammad Aliff Imran Suardi.
Industrial Training.
Universiti Teknologi MARA, Perak.
(Submitted)
Abstract
Defect Liability Period (DLP) is essential in every building as the warranty of the building. It is also the period a contractor is liable to make good the defects. Therefore, the aims and purposes of this report was to identify the types of defects in a building and to investigate the problems and solutions of every defect in this building. It was conducted at Avisena Women's and Children's Specialist Hospital. This report also will focus on all the works related to how to prevent defects in a building. As a result, the building will mainly be safe from any hazards in the future. In conclusion, DLP was shown to be an important role in a contract to keep a building safe.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Suardi, Muhammad Aliff Imran 2017213228 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ismail, Asmat UNSPECIFIED Thesis advisor Mahyuddin, Muhammad Naim UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Building failures, errors, defects, etc. |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | defect studies, defect liability period, contractor |
Date: | 2019 |
URI: | https://ir.uitm.edu.my/id/eprint/97699 |