Defect studies during defect liability period / Muhammad Aliff Imran Suardi

Suardi, Muhammad Aliff Imran (2019) Defect studies during defect liability period / Muhammad Aliff Imran Suardi. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

Defect Liability Period (DLP) is essential in every building as the warranty of the building. It is also the period a contractor is liable to make good the defects. Therefore, the aims and purposes of this report was to identify the types of defects in a building and to investigate the problems and solutions of every defect in this building. It was conducted at Avisena Women's and Children's Specialist Hospital. This report also will focus on all the works related to how to prevent defects in a building. As a result, the building will mainly be safe from any hazards in the future. In conclusion, DLP was shown to be an important role in a contract to keep a building safe.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Suardi, Muhammad Aliff Imran
2017213228
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Ismail, Asmat
UNSPECIFIED
Thesis advisor
Mahyuddin, Muhammad Naim
UNSPECIFIED
Thesis advisor
Ismail, Dzulkarnaen
UNSPECIFIED
Subjects: T Technology > TH Building construction > Building failures, errors, defects, etc.
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus
Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Keywords: defect studies, defect liability period, contractor
Date: 2019
URI: https://ir.uitm.edu.my/id/eprint/97699
Edit Item
Edit Item

Download

[thumbnail of 97699.pdf] Text
97699.pdf

Download (14MB)

ID Number

97699

Indexing

Statistic

Statistic details