Extension of time / Izzah Syazaliana Zulkarnain

Zulkarnain, Izzah Syazaliana (2020) Extension of time / Izzah Syazaliana Zulkarnain. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Abstract

Construction delays can be seen as a risk for the projects as it affects project success in terms of time, cost and quality. Therefore this report will discuss further on Extension of Time (EOT) for construction in Malaysia, according to the P.W.D. Form 203A (Rev.1/2010). This report was conducted based on the case study of Project Proposed Construction and Completion of Muzium Setem Negeri Selangor, located at Bandar Shah Alam, Daerah Petaling, Selangor. The objective of this report is to shed light on the provision of extension of time in construction contracts and how important it should be included in construction contracts. It will focus on the procedure to be adhered to for the application of extension of time. To determine the grounds, to focus on the eligibility of the contractor to claim for extension of time and then to evaluate how this provision can provide benefits to contractors where delays occur which are prescribed based on P.W.D. Form 203A (Rev.1/2010). This report will also look at the conditions precedent and sufficient information of the claim based on the relevant contractual provisions to ensure the S.O. to grant for extension of time and issues the Certificate of Delay and Extension of Time to the contractor.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 83848.PDF]
Text
83848.PDF
Download (880kB)
Indexing & Metrics