Items where Subject is "Construction industry"
- Library of Congress Subject Areas (1)
- H Social Sciences (1)
- HD Industries. Land use. Labor (1)
- Construction industry (54)
- Malaysia (54)
- Construction industry (54)
- HD Industries. Land use. Labor (1)
- H Social Sciences (1)
A
Development of main contractor and subcontractor relationship (MACSOR) framework for Malaysian construction projects / Siti Hamidah Abdull Rahman. (2018) In: The Doctoral Research Abstracts. IGS Biannual Publication, 14 . Institute of Graduate Studies, UiTM, Shah Alam.
A study in the production sharing contract in the oil and gas industry and public private partnership in the construction industry / Surya Fareeza A. Rahim.
(2013)
Masters thesis, thesis, Universiti Teknologi MARA.
Safety at construction site / Muhammad Naim Firdaus Ab Manaf. (2016) [Student Project] (Unpublished)
The effect of market capitalization on portfolio construction / Nurul Huda Ab. Samat.
(2007)
[Student Project]
(Submitted)
Conceptual protocol model for improving preliminaries in conventional contract / Abdul Aziz Abas.
(2020)
PhD thesis, thesis, Universiti Teknologi MARA.
The relationship of real estate between foreign direct investment, gross domestic product, interest rate and inflation rate in Malaysia / Nurul ‘Izzati Abd Latif. (2013) [Student Project] (Unpublished)
Establishment of cost-benefit analysis (CBA) sustainable indicators for industrialised building system (IBS) projects: best practice / Siti Nur Atikah Abd Rashid.
(2021)
Masters thesis, thesis, Universiti Teknologi MARA.
Framework development of quality control for construction site inspection / Nur Nabihah Abd Razak.
(2017)
Masters thesis, thesis, Universiti Teknologi MARA (UiTM).
Impact of sustainability practices on developer companies’ performance in the Malaysia construction industry / Muhammad Izhuan Abdul Manaff.
(2017)
Masters thesis, thesis, Universiti Teknologi MARA (UiTM).
Portfolio construction and performance evaluation empirical study in industrial sector in Malaysia from 2007 -2016 / Fadilah Abdul Rahim. (2017) Degree thesis, thesis, UiTM Cawangan Johor.
Strategies and challenges in implementing green roof in the construction project / Nurul Nabilah Abdul Rahim. (2020) [Student Project] (Unpublished)
Project management : qualities of construction project manager / Asniza Hamimi Abdul Tharim ... [et al.]. (2012) In: 1st International Conference on Innovation and Technology for Sustainable Built Environment 2012 (ICITSBE 2012), 16-17 April 2012, Universiti Teknologi MARA Cawangan Perak.
Construction waste practice: barrier and initiatives by construction parties to implement waste management in Sarawak / Ainul Fakhirah Abdul Wahab.
(2020)
[Student Project]
(Unpublished)
Safe school from bullying through environmental design in secondary school / Azna Abdul Wahab.
(2020)
Masters thesis, thesis, Universiti Teknologi MARA.
Abdullah, Nor Ainah Basic of construction contracts: PAM, CIDB, PWD and FIDIC standard forms / Nor Ainah Abdullah. (2022) 2nd edition ed. UiTM Press, Shah Alam, Selangor. ISBN 9789673638000
Bid evaluation strategy among G7 construction companies in Sarawak / Ika Syafiqa Abdullah.
(2020)
Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
Case Study : MYR Construction Sdn. Bhd / Noor Syameera ‘Aina Abdullah. (2020) [Entrepreneurship Project] (Unpublished)
Case Study : Myr Construction Sdn.Bhd. / Nur Baizura Abdullah. (2020) [Entrepreneurship Project] (Unpublished)
Performance of construction company in Malaysia during recession market based on internal factors (financial) / Siti Nor Hayati Abdullah.
(2012)
[Student Project]
(Submitted)
Enforcement safety and health in Majlis Perbandaran Sepang facilities for TABAS / Nur Hanis Abdullah Thani. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
Benchmarking on infrastructure maintenance management culture for local authorities in Malaysia / Hamimah Adnan and Zafrul Fazry Mohd Fauzi. (2012) [Research Reports]
Implementation of performance - related - pay among freshly graduated quantity surveyors in Sabah / Dg Nur Amalina Ag Buhtamam. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
The hiring of illegal workers: a case study of construction sector in Kota Kinabalu Sabah / Faizah Ahmad and Nurhain Awang.
(2016)
[Student Project]
(Unpublished)
Training and Trainer's challengers:The case of ABM Sarawak / Abdul Rahman Ahmad and Ikhwan Mohd Ibrahim. (2014) Masters thesis, thesis, Universiti Teknologi Mara Cawangan Sarawak.
ETR 300 Hi-Tech Sdn. Bhd. / Norhayati Ahmad... [et al.]. (1999) [Entrepreneurship Project] (Unpublished)
Supplier procedure in construction company: Alshem Group (M) Sdn Bhd / Ruzanna Ahmad Fuad.
(2009)
[Student Project]
(Unpublished)
De' Globe Consult: cadangan membina rumah banglo 2 tingkat di Lot 10, Jalan Padi Mahsuri 2/6, Bandar Barunuda, 81200, Johor Bahru / Ahmad Amsyar Aizulkamal ... [et al.]. (2017) [Student Project] (Unpublished)
The influence of capital structure on construction company profitability : a study of Malaysian Resources Corporation Berhad (MRCB) AND WCT Berhad / Malisa Ajis. (2013) [Research Reports] (Submitted)
Project Siemen Craft / Mohd Faidzul Amar... [et al.]. (2000) [Entrepreneurship Project] (Unpublished)
Shortage of local general workers in Malaysia construction industry / Muhammad Hafiz Anuar and Khalida Mohd Sukur. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.
IRA Teknik Consulting Engineers / Nur Nadia Ashari. (2014) Industrial Training. UiTM Cawangan Johor Kampus Pasir Gudang, UiTM Pasir Gudang. (Unpublished)
The adoption of 5D building information modelling for quantity surveyors towards better productivity / Husna Nazifa Awang Abdul Kadir. (2020) [Student Project] (Unpublished)
The determinants of financial distress in Malaysian construction sector / Muhammad Danial Azalan and Nur Zulaiqa Abd Rahman.
(2016)
[Student Project]
(Unpublished)
A methodology to evaluate the effectiveness of designers' cognitive process when using multi-user virtual reality / Adlin Shaflina Azizo ... [et al.]. (2022) Built Environment Journal, 19 (2): 1. pp. 60-66. ISSN 2637-0395
Industrialized Building System (IBS) as green technology towards the sustainability building construction in Perak / Nur Amira Azman.
(2021)
[Student Project]
(Unpublished)
Construction project cost estimation software utilization in construction industry / Khairul Izzuddin Shah Azman Shah. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
B
Safety and health for construction workers in bridge construction / Muhamad Ekwan Haniffah Baharudin and Syarifah Nur Nazihah Syed Jamalulil. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.
Beyond eco-efficiency in the built environment / Kelley Beaverford. (2012) In: 1st International Conference on Innovation and Technology for Sustainable Built Environment 2012 (ICITSBE 2012), 16-17 April 2012, Universiti Teknologi MARA Cawangan Perak.
Customer understanding and confident toward service quality in construction industry / Amiezaitul Asyikin Berahim.
(2015)
[Student Project]
(Unpublished)
Factors contributing to the business failure of a construction firm : a case of Suprawell Sdn Bhd / Azarudin Berudin and Daphne Gayle Manggala.
(2015)
Masters thesis, thesis, Universiti Teknologi MARA, Sabah.
Challenges and drivers of green procurement among construction practitioners in Malaysia / Zafikha Aida Bidin ... [et al.]. (2020) International Journal of Service Management and Sustainability (IJSMS), 5 (1). pp. 1-28. ISSN 2550-1569
Factors affecting health and safety performance in Kuching's construction project / Reelaiah Brum. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
C
Proposed 56 units of detached house phase 3c2 at Panji / Muhamad Zulhilmi Che Haris ...[et al.]. (2016) [Student Project] (Unpublished)
International market entry strategies by Malaysian construction firms / Che Khairil Izam Che Ibrahim, Jazuri Abdullah and Muhammad Hafeez Osman.
(2009)
[Research Reports]
(Unpublished)
ETR 300 : Miracle Container Sdn. Bhd. / Sakina Che Sab ... [et al.]. (2002) [Entrepreneurship Project] (Unpublished)
A study on the fire safety system for timber longhouse / Eunice Harika Clarence. (2019) [Student Project] (Unpublished)
D
Perception of affordability of PR1MA project among the department of academic affairs staff of Universiti Malaysia Sabah (UMS), Kota Kinabalu, Sabah / Gloria Danius and Nurizan Mujim.
(2016)
[Student Project]
(Unpublished)
Integration of Supply Chain Management (SCM) in Industrialised Building System (IBS) / Roland Royston Runggah Dunging. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
Mega Build Sdn. Bhd.: Cadangan membina dan menyiapkan sebuah rumah murah kos sederhana dua tingkat, No: 4126 Ptd: 65440, Jalan Jati 8, Bandar Putra, 81000, Kulai, Johor / Fathol Qhorib Dzulkefly...[et al.]. (2018) [Student Project] (Unpublished)
E
Using the UTAUT Model to analyze e-procurement adoption in Malaysian Construction Industry/ Suhaidi Elias @ Alias. (2018) Insight Journal (IJ), 1 (1). pp. 90-99. ISSN 2600-8564
Discovery of geological and archaeological things in construction site / Janidah Eman... [et al.].
(2008)
[Research Reports]
(Unpublished)
Safety aspect in management of construction project / Janidah Eman...[et al.]. (2010) In: ICOPS 2010 : International Conference on Public Polices & Social Sciences : E-Proceedings, 26 to 27 May 2010, SP Inn Hotel, Sungai Petani Kedah, Malaysia.
F
Post occupancy evaluation of hostel building in public university / Fatin Farzana Fakhruddin.
(2021)
[Student Project]
(Unpublished)
ENT 300 Brick and Cement Supplier / Cassandra Ubar Felix George... [et al]. (2010) [Entrepreneurship Project] (Unpublished)
Workplace skills: a study of the skills taught in UiTMCS and its relevance to the construction industry in Sarawak / Foo Kien Kheng, Nagarajah Lee and Rudy Tawie. (2003) [Research Reports] (Unpublished)
Workplace skills : A study of the skills taught in UiTM CS and its relevance to the construction industry in Sarawak / Foo Kien Kheng ... [et al.]. (2003) [Research Reports] (Unpublished)
Implementing of total quality management (TQM) in Malaysian construction industry / Khairul Nizam Fourzan.
(2021)
[Student Project]
(Unpublished)
Contractors' perception towards behavior-based safety (BBS) system in construction industry / Nina Sakina Fourzan. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
G
The impact of shortage construction materials in construction industry at Southern Sarawak / Jordan Evin Guntor. (2020) [Student Project] (Unpublished)
H
Gazette of 30% indigenous entitlement in every government’s tender the case study of Seri Gelam Enterprise / Harnizah Hajar.
(2011)
[Student Project]
(Unpublished)
Sharia compliance in the construction industry: is this something to build upon? / Carrie Amani Annabi, Mujtaba Ummesalma Husein, Fatima Hassan, Nouman Nasir. (2017) Journal of Emerging Economies and Islamic Research (JEEIR), 5 (1). pp. 1-16.
Case Study : MYR Construction Sdn Bhd / A’isyatul Humaira’ Halim. (2020) [Entrepreneurship Project] (Submitted)
Constraints in implementing qlassic for stratified housing / Sofia Nadhirah Harun and Nadira Ahzahar. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.
Nothern Survey Equipment & Company / Zambri Hassan ... [et al.]. (2002) [Entrepreneurship Project] (Unpublished)
ETR 300 : Zealous Marble Manufacturing / Kamarul Liza Hashim ... [et al.]. (2000) [Entrepreneurship Project] (Submitted)
E-Procurement benefits framework for construction industry / Norfashiha Hashim … [et al.]. (2014) In: IIDEX 2014: invention, innovation & design exposition. Research Innovation Business Unit, Shah Alam, Selangor, p. 28. (Submitted)
The adoption of building information modelling (BIM) in enhancing facilities management performance / Zariel Irfan Hattono.
(2021)
[Student Project]
(Unpublished)
I
The motives of strategic alliances among construction companies in Johor Bahru / Marlina Ismail.
(2011)
[Student Project]
(Unpublished)
Adopting building information modelling (BIM) into industrialised building system (IBS) in Malaysian construction industry / Irma Hanie Ibrahim ... [et.al.]. (2022) Journal of Smart Science and Technology, 2 (2): 4. pp. 40-51. ISSN 2785-924X
A Sustainable and Systematic MEDIF System / Norizzati Ibrahim ... [et al.]. (2021) In: UNSPECIFIED.
Construction Industry Waste Control Practice in Kuching, Malaysia / Roseline Ikau... [et al.]. (2013) [Research Reports] (Unpublished)
A framework for effective private dispute resolution in the Malaysian construction industry / Zulhabri Ismail.
(2010)
PhD thesis, thesis, Universiti Teknologi MARA (UiTM).
Malaysian contractor and their globalisation awareness / Mohamad Najib Ismail.
(2006)
[Student Project]
(Unpublished)
The competitive advantage of getting tender: a case study of United Engineers Malaysia Berhad / Nurul Azwa Ismail.
(2010)
[Student Project]
(Unpublished)
J
Personal competency of women project managers / Mastura Jaafar and Liyana Othman. (2012) In: 1st International Conference on Innovation and Technology for Sustainable Built Environment 2012 (ICITSBE 2012), 16-17 April 2012, Universiti Teknologi MARA Cawangan Perak.
The negative effects of conflict to construction industry : a Malaysian perspective / Noraidawati Jaffar ... [et al.]. (2012) In: 1st International Conference on Innovation and Technology for Sustainable Built Environment 2012 (ICITSBE 2012), 16-17 April 2012, Universiti Teknologi MARA Cawangan Perak.
UEM Edgenta Propel Berhad / Aida Aqila Jafri. (2018) Industrial Training. Faculty of Civil Engineering, Pasir Gudang. (Unpublished)
Smart construction concept: perception of G7 contractors in Sarawak / Elissa Sandy Jalong.
(2021)
[Student Project]
(Unpublished)
Asaka Construction Company: Cadangan membina banglo 2 tingkat Lot 59, Jalan Kurt Donald, Cahaya Masai, 81750 Masai, Johor / Mohd Afif Aiman Jamil ... [et al.]. (2016) [Student Project] (Unpublished)
A study on safety climate at construction site Gerbang Nusajaya Sdn Bhd / Nurul Etylia Jefli and Nurul Asmida Hailudin.
(2016)
[Student Project]
(Unpublished)
Fundamentals of Entrepreneurship ENT300 Abram Cement Enterprise / Nick Mattaaari Jefri... [et al.]. (2011) [Entrepreneurship Project] (Unpublished)
The awareness of the application of sustainable materials through developer’s perspective / Nur Atiqah Jepri Nor. (2020) [Student Project] (Unpublished)
The relationship between factors of work life balance and job satisfaction among support staff in Jabatan Kerja Raya (JKR) Bahagian Samarahan/ Mimi Fazzira Johari. (2018) [Student Project] (Unpublished)
Case Study : MYR Construction Sdn. Bhd / Muhammad Hafizzullah Juha Seman. (2020) [Entrepreneurship Project] (Submitted)
K
A framework for successful delivery of stakeholder management in public-private partnership infrastructure projects in Malaysia / Sakinah Khalidah Kaharuddin.
(2021)
Masters thesis, thesis, Universiti Teknologi MARA.
Implications and strategies of safety management in high rise building construction to contractor / Akalili Husna Kamall Rudin and Siti Nurhayati Hussin. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.
The mechanisation and automation of the ibs construction approach in Malaysia / Siti Syariazulfa Kamaruddi ... [et al.]. (2018) Asian Journal of Environment-Behaviour Studies, 3 (10). pp. 1-11. ISSN 2514-751X
Effectiveness of whistleblowing procedure and strategy in construction developer companies: a conceptual paper / Muhammad Afham Kamaruzaman and Kartina Alauddin. (2018) Academic Journal of Business and Social Sciences (AJoBSS), 2. pp. 1-9. ISSN 2590-440X
Issues and challenges faced by quantity surveyors during final account preparation / Nur Khairina Khairul Hisham. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
Site management of high rise building in Kuching Sarawak / Farith Hamizan Kushairi.
(2021)
[Student Project]
(Unpublished)
L
Perception of sustainable refurbishment in Sarawak construction industry / Muhd Afiq Qayyum Latif.
(2021)
[Student Project]
(Unpublished)
M
A study on construction industry: the capital structure of Malaysian firms / Amirah Hanim Mohammed Isa.
(2012)
[Student Project]
(Unpublished)
A study on how the delayed claims from buyer’s loan can affect Bulatan Mekar Sdn Bhd / Anis Aliya Mohd Yusoff.
(2009)
[Student Project]
(Unpublished)
Factors of the dependency on foreign workforce in Malaysian construction industry / Mohd Arif Marhani and Har Einur Azrin Baharuddin.
(2010)
[Research Reports]
(Unpublished)
Covid-19: factors affecting on awareness level of the force majeure clause in the construction contract / Norzaihan Mad Zin and Ezlina Mohd Ahnuar. (2022) Built Environment Journal, 19 (1): 2. pp. 15-22. ISSN 2637-0395
Performance supply chain management on construction site : a research proposal / Shahela Mamter, Wan Nur Azma Izzati Wan Amran and Mohd Esham Mamat. (2012) In: 1st International Conference on Innovation and Technology for Sustainable Built Environment 2012 (ICITSBE 2012), 16-17 April 2012, Universiti Teknologi MARA Cawangan Perak.
OHSAS 18001: sustainable construction / Mohd Arif Marhani, Hamimah Adnan and Faridah Ismail. (2018) Asian Journal of Environment-Behaviour Studies, 3 (9). pp. 1-10. ISSN 2514-751X
Strategic business development A case study On EGM Development SDN BHD / Emmy Marina Marzuki... [et al.]. (2013) Masters thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
Investigation on roles and task of construction managers in developing construction management competency: perspectives from Malaysian construction industry / Siti Sarah Mat Isa, Wan Norizan Wan and Farhan Md. Dahlan. (2012) In: The 9th Regional Symposium of the Malay Archipelago, 11-12 December 2012, UiTM Perak.
Strategies for international market expansion: Strength, Weakness, Opportunity and Threat (SWOT) attributes of Malaysian construction firms / Che Maznah Mat Isa, Hamidah Mohd Saman and Christopher Nigel Preece. (2014) Jurnal Intelek, 9 (1). pp. 69-78. ISSN 2682-9223
Kajian penerokaan peluang kerjaya sebagai pekerja binaan di Negeri Perak / Norazlin Mat Salleh ... [et al.]. (2012) In: 1st International Conference on Innovation and Technology for Sustainable Built Environment 2012 (ICITSBE 2012), 16-17 April 2012, Universiti Teknologi MARA Cawangan Perak.
Cost control during construction stage among G6 and G7 contractors in Kuala Lumpur / Siti Munirah Mat Zuhari.
(2021)
[Student Project]
(Unpublished)
Professional competency for building control personnel in Malaysian local authorities / Nur Fazirah Mazlan. (2021) [Student Project] (Unpublished)
Case Study : AZ Akif Resources / Nur Atha’illah Husna Mazri.
(2021)
[Entrepreneurship Project]
(Unpublished)
A 4-quadrant framework on strategy, community, learning and innovation for the application of knowledge management in public sector organisations in construction / Khairil Hizar Md Khuzaimah.
(2017)
PhD thesis, thesis, Universiti Teknologi MARA (UiTM).
Bina Mekar Sdn Bhd / Nur Syazilia Md Nazry. (2014) Industrial Training. Faculty of Civil Engineering, Pasir Gudang. (Unpublished)
The industrialised building systems (IBS) in construction building project / Asmah Alia Mohamad Bohari, Kumalasari Kipli and Noorsaidi Mahat.
(2012)
[Research Reports]
(Unpublished)
E-Procurement implementation from quantity surveyors’ perspective / Nur Syazrin Mohamad Radzi and Kharizam Ismail. (2020) In: QS Colloquium 2020 Series XII.
An analysis of the causes of non-excusable delays by contractor for public projects in Sarawak/ Mohamad Rafiq Mohamad Radzuan. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
Creative Energy Enterprise / Zailiya Mohamad Yatim... [et al. (2000) [Entrepreneurship Project] (Unpublished)
Extension of time claim assessment in Malaysian construction industry: views from professionals / Norazian Mohamad Yusuwan and Hamimah Adnan. (2018) Asian Journal of Environment-Behaviour Studies, 3 (10). pp. 1-8. ISSN 2514-751X
Interdependencies of quarter report announcement in stock price volatility: comparative analysis of construction industries/ Mohamed Farhan Mohamed Firdaus. (2017) Degree thesis, thesis, Universiti Teknologi MARA, Johor.
Self-healing buildng: Level of awareness on nanomaterials / Nurul Natasha Mohamed Yusuf. (2020) [Student Project] (Unpublished)
A construction manager's technical knowledge competency model for the Malaysian construction Industry / Hairuddin Mohammad.
(2018)
PhD thesis, thesis, Universiti Teknologi MARA (UiTM).
The Adaptation of artificial intelligence in the malaysian construction industry / Mohammad Ashril Nadzim Abu Seman. (2018) Degree thesis, thesis, Universiti Teknologi Mara, Perak.
Identification of causes and mitigation measures of construction fall accidents of class a and class b contractors in Shah Alam area / Normadiana Mohammad Hanapi … [et al.]. (2013) In: Prosiding KONAKA Konferensi Akademik (Sains Sosial) 2013, 28-29 Oktober 2013, Bukit Gambang Resort City, Gambang, Pahang, Malaysia.
Identifying root causes and mitigation measures of construction fall accidents / Normadiana Mohammad Hanapi...[et. al.]. (2013) Gading Journal for the Social Sciences, 17 (01). pp. 65-79. ISSN 2600-7568
RAF Consult Sdn. Bhd. / Muhammad Zaki Ikmal Mohammad Shahir. (2018) Industrial Training. UiTM Cawangan Johor Kampus Pasir Gudang, UiTM Pasir Gudang. (Unpublished)
ICHI Ban Unggul Enterprise / Muhammad Afif Firdaus Mohd Ali. (2018) Industrial Training. Faculty of Civil Engineering, Pasir Gudang. (Unpublished)
Upgrading works / Nurul Hidayah Mohd Faizul Aris. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
Determinants on the performance of the construction companies in Malaysia [2008-2017] / Siti Amirah Mohd Fuaad. (2020) Degree thesis, thesis, Universiti Teknologi Mara Perlis.
The awareness of three dimensional printing in construction industry / Adry Andik Hakim Mohd Johari. (2018) [Student Project] (Unpublished)
Identifying the key social factors in post occupancy evaluation of a green building / Siti Nurul Ainun Mohd Mustafa ... [et.al.]. (2022) International Journal of Service Management and Sustainability (IJSMS), 7 (1). pp. 167-184. ISSN 0128-3057
An analysis of the financial performance of construction companies listed on main board on Kuala Lumpur Stock Exchange (KLSE) by using Financial Ratio Analysis / Noriza Mohd Saad.
(2001)
Degree thesis, thesis, Universiti Teknologi MARA, Kelantan.
User perception of energy consumption in two high-performance school buildings / Mohd Najib Mohd Salleh, Siti Rasidah Md Saki and Mohd Zin Kandar. (2018) In: 3rd International Conference on Rebuilding Place (ICRP2018), 13-14 September 2018, Impiana Hotel, Ipoh, Perak, Malaysia.
Basic principles and requirements of self compacting concrete / Mohd Syahrul Hisyam Mohd Sani and Ahmad Rasidi Osman. (2005) Jurnal Gading, 9 (1). pp. 107-123. ISSN 0128-5599
Vacant possession (VP) / Muhammad Adib Hizami Mohd Shariffuddin. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
Labour productivity based on construction industry performance: sectorial analysis / Siti Aisyah Mohmad Ileyes.
(2021)
[Student Project]
(Unpublished)
The effect of management and engineering knowledge in the
performance of class F contractor / Noor Tania Mokhtar.
(2001)
[Student Project]
(Unpublished)
Development of "Game of Contract" for Interactive edutainment / Sylvia Gala Mong ... [et.al.]. (2022) International Journal of Service Management and Sustainability (IJSMS), 7 (1). pp. 145-166. ISSN 0128-3057
Awareness and adoption of lean construction tools to enhance safety in construction projects / Zalikha Morshidi ... [et.al.]. International Journal of Service Management and Sustainability (IJSMS), 7 (2). pp. 1-20. ISSN 0128-3057
Implementation of lean construction in construction project towards safety improvement / Zalikha Morshidi. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
Supervision work at site (Recreational area in UiTM Seri Iskandar, Perak Darul Ridzuan) / Muhamad Daniesy Zamri. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)
Developing a resilient Crisis Management Plan (CMP) for the Malaysian construction sector / Anis Mardhiah Mukhtar ... [et al.]. (2022) Built Environment Journal, 19 (1): 5. pp. 42-52. ISSN 2637-0395
The factors influencing purchase decision of residential properties in Bandar Seri Iskandar, Perak / Nur Raihan Murtadza and Nor Aini Salleh. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.
Informal risk management practices for cost overruns in Malaysian public linear projects / Marina Musa.
(2015)
PhD thesis, thesis, Universiti Teknologi MARA (UiTM).
Adopting modular construction in the Malaysian construction industry / Muhamad Faiz Musa … [et al.]. (2018) Asian Journal of Environment-Behaviour Studies, 3 (10). pp. 1-9. ISSN 2514-751X
The challenges of Emergency Action Plan (EAP) implementation in construction project / Nur Naizatul Asyekin Mustafa.
(2021)
[Student Project]
(Unpublished)
N
NAS and auditor independence: evidence from Malaysian listed construction companies / Wan Zurina Nik Abdul Majid … [et al.]. (2021) Journal of Contemporary Social Science Research (JCSSR), 5 (1). pp. 10-19. ISSN 0128-2697
O
Entrepreneurship : Unique Planning & Consults / Kartika Malini Omar ... [et al.]. (2008) [Entrepreneurship Project] (Unpublished)
Industrialised Building System (IBS) In Malaysia / Norman Jafni Othman.
(2021)
[Student Project]
(Unpublished)
P
A study on the relationship of earning per share with capital structure, earning after tax and dividend payout ratio of construction companies / Harrison Para.
(2003)
[Student Project]
(Unpublished)
R
An assessment model for temporary multi-organisational (TMO) integration in construction projects / Arina Rahmat.
(2020)
PhD thesis, thesis, Universiti Teknologi MARA.
A case study on the construction and the maintenance of captive predators' enclosure in Sunway Lagoon Wildlife Park / Raja Azzmine Raja Azizdin. (2020) [Student Project] (Unpublished)
Development of success factor model for construction project / Norhalifah Ramlee.
(2018)
Masters thesis, thesis, Universiti Teknologi MARA (UiTM).
Factor affecting labour productivity in building construction project in Malaysia / Ahmad Nabil Ramli.
(2021)
[Student Project]
(Unpublished)
Delima Consult Sdn. Bhd: Double-storey bungalow Shah Alam & elevated water tank / Mohamad Amirul Aizat Rashid, Zarith Ashraf Muhammad Tarmizi, Izzah Mardhiah Md Aris. (2016) [Student Project] (Unpublished)
Industrial revolution 4.0 transformation : Challenges and opportunities in Malaysia construction industry / Esse Temi Ricky Lawat.
(2021)
[Student Project]
(Unpublished)
Mengapa pengawetan perlu untuk konkrit? / A.R.M. Ridzuan … [et al.]. (2002) In: Prosiding Seminar Kebangsaan Sains,Teknologi dan Sains Sosial “Ke Arah Pembangunan Negara”, 27 dan 28 Mei 2002, Hotel Vistana, Kuantan, Pahang.
Sinar Craft / Shah Imran Rosalie... [et al.]. (2012) [Entrepreneurship Project] (Unpublished)
The perspectives of small grade of the safety and health practices in Selangor / Muhammad Irfan Roslan.
(2021)
[Student Project]
(Unpublished)
Delima Consult Sdn. Bhd.: Double-storey bungalow Shah Alam / Muhammad Nastha Shafiq Roslee. (2016) [Student Project] (Unpublished)
Communication barriers between local contractors and foreign unskilled labour / Muhamad Farhan Rosli and Kharizam Ismail. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.
Precast Concrete Structure Limited / Ali Rosman...[et al.]. (2007) [Entrepreneurship Project] (Unpublished)
The awareness on crime prevention through environmental design in the construction industry / Nur Farah Aimi Rothman. (2020) [Student Project] (Unpublished)
S
Low cost house quality developed by Permodalan Negeri Selangor Berhad / Sumayyah Shaidan.
(2006)
[Student Project]
(Unpublished)
Factors affecting safety performance at construction site of Srimuda Jaya Sdn. Bhd. / Lily Shahzlyn Shaharuddin.
(2018)
[Student Project]
(Unpublished)
The challenges of virtual reality implementation in construction industry / Nabillah Sahmad.
(2021)
[Student Project]
(Unpublished)
Business Plan : Teguh Bestari Enterprise / Ashikin Salleh ... [et al.]. (2008) [Entrepreneurship Project] (Unpublished)
Aman Engineering Sdn Bhd / Mohd Shaiful Samsudin ... [et al.]. (2003) [Entrepreneurship Project] (Unpublished)
Effects of international contractors involvement in construction project / Ernie Aryanee Sapiyan. (2019) Masters thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
Effects of international contractors involvement in construction project / Ernie Aryanee Sapiyan. (2019) [Student Project] (Unpublished)
A study on the application of strategic management to the contractor’s firm / Norsyakila Shahrudin.
(2006)
[Student Project]
(Unpublished)
Ideal portfolio construction by using single index model based on bursa Malaysia data / Sidi Syaffiee Sidi Omar. (2015) Industrial Training. Universiti Teknologi Mara Kampus Kota Bharu, Kota Bharu. (Unpublished)
Critical success factors in workplace in relation with KPI in construction industry in Sarawak / Geraldine Emma Sinsoon. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
Peranan Unit Pendaftaran Kontraktor dalam membantu kontraktor bumiputra Sarawak, kajian kes di sekitar bandar Kuching / Hairani Solo ... [et al.]. (2000) [Student Project] (Unpublished)
Peranan Unit Pendaftaran Kontraktor dalam membantu kontraktor Bumiputra Sarawak: kajian kes di sekitar bandar Kuching / Hairani Solo ... [et.al.]. (2000) [Student Project]
Housing development and pr1ma : myth or reality? / Azlinor Sufian. (2012) In: 1st International Conference on Innovation and Technology for Sustainable Built Environment 2012 (ICITSBE 2012), 16-17 April 2012, Universiti Teknologi MARA Cawangan Perak.
Fundamental of Entrepreneurship ENT300 Apex Door Sdn Bhd / Dunstan Sugai... [et al.]. (2007) [Entrepreneurship Project] (Unpublished)
Application of safety and health assessment (SHASSIC method) in Malaysian construction sites / Nadia Syuhada Suhaili.
(2021)
[Student Project]
(Unpublished)
Impact of construction waste management towards environmental health / Mohamad Haziq Sulaiman. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
Indah Sebati Sdn Bhd / Nur Nabila Shafiqah Sulaiman. (2014) Industrial Training. UiTM Cawangan Johor Kampus Pasir Gudang, UiTM Pasir Gudang. (Unpublished)
Northern Property Development / Syed Muhammad Faris Syed Fuan ... [et al.]. (2000) [Entrepreneurship Project] (Submitted)
Payment in construction / Sharifah Natasha Iman Syed Mokhtar. (2017) Industrial Training. Universiti Teknologi Mara, Perak, 2017. (Unpublished)
T
Rural project construction workers' performance through health and safety strategies in Sarawak / Eylisia Edwin Anak Tagok. (2020) Degree thesis, thesis, Universiti Teknologi MARA Sarawak,Kampus Samarahan.
Contractor's perception towards communication barrier at construction site / Faezah Tairin. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
Development of axiomatic design-based High Strength Concrete framework / Rudy Tawie … [et al.].
(2014)
[Research Reports]
The impact of liquidity and leverage towards firms profitability: an evidence from construction industry listed in Bursa Malaysia / Andreaschristielysemie Tolish.
(2016)
[Student Project]
(Unpublished)
Stress management among construction professionals in Kuching, Sarawak / Elisha Tozen. (2020) [Student Project] (Unpublished)
U
The level of awareness of standard form of building contract by Asian International Arbitration Centre (AIAC) among construction professionals in Malaysia / Fifi Aiza Udin. (2020) [Student Project] (Unpublished)
V
Expected competencies of consultant quantity surveying firms in Malaysian Construction Industry: A client’s perspective / Valentina Tunga Victor Dindang.
(2021)
[Student Project]
(Unpublished)
W
Application of value management in construction industry during early stages / Wan Assad Qutubuldin Wan Abdul Aziz.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Ideal procurement system for Malaysian private sector construction clients / Wan Norizan Wan Ismail , Siti Sarah Mat Isa and Siti Nor Faizah Ab Malek. (2012) In: 1st International Conference on Innovation and Technology for Sustainable Built Environment 2012 (ICITSBE 2012), 16-17 April 2012, Universiti Teknologi MARA Cawangan Perak.
Development of building information modeling (BIM) adoption assessment tool for BIM-based projects in Malaysia / Wan Nur Syazwani Wan Mohammad. (2022) PhD thesis, thesis, Universiti Teknologi MARA (UiTM).
Asas Keusahawanan (ETR 300) : Sacis Engineering Sdn. Bhd. / Wan Norhidayah Hj. Wan Muntil ...[et al.]. (1999) [Entrepreneurship Project] (Unpublished)
Prospect of shipbuilding and related industries in Sarawak / Wan Ahmad Lutfi Wan Zainal Abidin… [et.al.].
(2002)
[Student Project]
(Unpublished)
Strategic analysis of Akademi Binaan Malaysia (Sarawak) Sdn. Bhd. / Wan Ahmadi Wan Zaine ... [et al.].
(2004)
[Student Project]
(Unpublished)
Push forward for safety management awareness among construction stakeholders / Sharifah Siti Nur Fatinah Wan Zurkarnain.
(2021)
[Student Project]
(Unpublished)
Financial statement analysis of Cergas Asli Sdn. Bhd. / Ramsis Anak William Agim... [et.al].
(2014)
Masters thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.
The knowledge, attitude and perception of undergraduate students towards sustainable construction / Antonius Munan Winston Tachil. (2020) [Student Project] (Unpublished)
Conceptualising risk culture on enterprise risk management (ERM) implementation in construction companies / Wong Ching Ching ... [et al.]. (2020) Built Environment Journal (BEJ), 17 (1). pp. 59-70. ISSN 1675-5022
Y
Lack of awareness among contractor in project management: delay construction / Suria Yaacob.
(2006)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
A framework on mitigating contractor’s claim on loss and expense due to extension of time / Nor Hidayah Yahya.
(2021)
Masters thesis, thesis, Universiti Teknologi MARA.
Case study : Millenium SKP Sdn. Bhd. / Mohamad Asyraf Fahmi Yahya.
(2020)
[Entrepreneurship Project]
(Unpublished)
GBI tools for interiors - sustainable planning & management / Rostam Yaman … [et al.]. (2014) In: IIDEX 2014: invention, innovation & design exposition. Research Innovation Business Unit, Shah Alam, Selangor, p. 30. (Submitted)
The potential of carbon footprint reduction of a mid-rise residential building in Sarawak / Nurdiyanah Yaman. (2020) Masters thesis, thesis, Universiti Teknologi MARA, Sarawak.
Attrition issues among technical female graduates in Malaysian construction industry / Nur Amani Yazid and Noor Aisyah Asyikin Mahat. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.
Strategic analysis of Citra Alti Sdn Bhd / Azlin Yusof… [et.al.].
(2009)
[Student Project]
(Unpublished)
Z
Interrelationship of quarter results announcement towards stock price: analysis of construction sector in Malaysia / Zafirah Nadia Zainal.
(2018)
Degree thesis, thesis, UiTM Cawangan Johor.
Determinants of capital structure: a study on Malaysian construction companies / Noor Sa’idah Zainuddin.
(2007)
[Student Project]
(Unpublished)
Issues in foreign workers management in construction project / Muhammad Ashrof Arifuddin Zakaria and Fairiz Miza Yop Zain. (2020) In: QS Colloquium 2020 Series XII.
Concreting works / Nur Atiqah Najihah Zakaria. (2018) Industrial Training. Universiti Teknologi MARA, Perak.
Agro Paint Decoration Enterprise / Mohd Nazri Zikiri ... [et al.].
(2009)
[Entrepreneurship Project]
(Unpublished)
Factors influencing workplace accidents among construction workers at Carita Sdn Bhd, Desa Aman Puri, Kepong, Selangor / Nurazlinda Zolkepre.
(2020)
[Student Project]
(Unpublished)
The customer preferences towards real estate property: The contributing factors / Muhammad Amir Asyraf Zulkefli. (2016) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.