Risk management is a process where to identify, analyse, treat and control the risk that possible to occur during construction. By applying the risk management, certain risk in the project can be predicted and the parties involve can control the risk. Industrialised Building System (IBS) is a type of construction that using precast concrete- which are made from manufacture. In Malaysia, although IBS has been well known, only few contractors agree to do it. This is because the IBS components or structures are very expensive. So, there are three objectives to be achieved in this final project. The objectives are to identify the factors that contributed to high cost of using IBS, to identify the implication that occur due to high cost in IBS and to determine the precaution taken due to high cost in IBS. In order to achieve the objectives, primary and secondary research methodology had been applied. Primary data are gathered from interview session with few project's team members. In addition, secondary data are obtained from literature review. From the analysis, it can be concluded that risk management in IBS is very important as it will determine the project cost. If the project team can identify and control the risk that possibly to happen, so the project can be completely done as scheduled.
| Item Type: | Student Project |
|---|---|
| Creators: | Creators Email / ID Num. Pandi, Muhamad Firdaus 2017488508 |
| Subjects: | H Social Sciences > HD Industries. Land use. Labor > Construction industry T Technology > TH Building construction > Systems of building construction. Industrialized building |
| Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
| Programme: | Bachelor of Quantity Surveying (Hons) |
| Keywords: | Risk management, Industrialised Building System, IBS, Precast concrete, Construction cost, Malaysia |
| Date: | 2019 |
| URI: | https://ir.uitm.edu.my/id/eprint/144317 |
144317.pdf