Items where Subject is "Contractors"

Group by: Creators | Item Type
Jump to: A | B | C | F | G | H | I | J | K | L | M | N | O | P | R | S | T | W | Y | Z
Number of items at this level: 123.

A

Development of main contractor and subcontractor relationship (MACSOR) framework for Malaysian construction projects / Siti Hamidah Abdull Rahman. (2018) In: The Doctoral Research Abstracts. IGS Biannual Publication, 14 . Institute of Graduate Studies, UiTM, Shah Alam.

The capability of class f contractor towards implementing IBS / Nurul Huda Abd Samad. (2010) [Student Project] (Unpublished)

Identification of common problems faced by the Bumiputera contractors / Ad. Johan Abdullah. (2006) [Student Project] (Submitted)

An integrated value management (IVM) framework for contractors in design and build (D&B) projects / Siti Hamidah Abdul Hamid. (2014) Masters thesis, thesis, Universiti Teknologi MARA.

Payment of sub-contractor at project pembinaan kuaters dan dewan tertutup bagi Jabatan Imigresen Malaysia di Bandar Baru Uda, Johor Bahru, Johor. / Muhammad Zikri Hafiz Ab. Aziz. (2017) [Student Project]

The construction of Malay identity in the media: a literature review / Siti Hajar Abd Aziz. (2012) In: The 9th Regional Symposium of the Malay Archipelago, 11-12 December 2012, UiTM Perak.

Abandoned housing at Taman Kelisa Ria, Sungai Petani, Kedah / Muhammad Amir Aiman Abd Hamid. (2021) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Tender process of issu selective tender for changing Cooling Tower at Menara Perbadanan / Siti Norhayyana Nashuha Abdollah. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Building condition survey of Sri Cemerlang Bungalow House / Muhammad Hazim Abdul Ghafar. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

An Integrated Value Management (IVM) framework for contractors in Design and Build (D&B) projects / Siti Hamidah Abdul Hamid. (2014) Masters thesis, thesis, Universiti Teknologi MARA.

Sick building syndrome: lighting assessment for computer lab in UiTM Shah Alam / Hawa Abdul Majid. (2005) Degree thesis, thesis, Universiti Teknologi MARA.

Defect liability period, DLP (contractor responsibilities) / Abdillah Azizi Abdul Mu’en. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Contract implementation for public works / Nur Azean Abdul Rahim. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Preparation of tender document / Wan Abdullah. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Renovation work for a meeting room at Faculty of Art and Surveying / Norazizah Abu. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Contract management for interim certificates and payment / Azlan Abu Bakar. (2017) [Student Project]

The implementation of corporate social responsibilities (CSR) among G7 contractors in Malaysia / Hamimah Adnan ... [et al.]. (2019) Built Environment Journal (BEJ), 16 (1). pp. 13-22. ISSN 1675-5022

Critical success factors for UiTM contractors in Malaysia / Hamimah Adnan … [et al.]. (2012) [Research Reports]

Process of renovation work for roof of existing building (school) / Nooraizat Ahmad. (2018) Industrial Training. Universiti Teknologi MARA, Perak, Seri Iskandar, Perak. (Unpublished)

Tendering process for kindergarten in the indigenous community in Perak / Nur Azmalia Ahmad Kamal. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Developers’ perspectives on the root causes of project postponement in Malaysia / Nur Syahirah Ahmad Shabri and Shahela Mamter. (2020) In: QS Colloquium 2020 Series XII.

Handling bandar baru Setiawan P\Perdana site progress work, valuation on site and preparation of interim payment certificate / Shazieta Adlika Ahmad Zaki. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Maintenance management: A case study at UiTM Pulau Pinang / Nadira Ahzahar, Hazrina Ahmad and Siti Hafizan Hassan. (2009) [Research Reports] (Unpublished)

Renovation work in office building: renovation permits. Case study: K Builders Training & Consulting Office / Noor Athirah Aksar. (2015) [Student Project]

Procedure of post contract administration (Damansara City 2, Kuala Lumpur) / Izzat Fadzrul Nazreen Anas. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Handing over process for Kompleks Alor Star / Aizal Amri Atan. (2016) [Student Project] (Unpublished)

The adoption of 5D building information modelling for quantity surveyors towards better productivity / Husna Nazifa Awang Abdul Kadir. (2020) [Student Project] (Unpublished)

Strategic construction waste management model for Contractors of large residential projects / Siti Merianna Awang Rosppa ... [et al.]. (2021) In: UNSPECIFIED.

Assessing the compliance of employers in contract agreement towards foreign employees in maintenance works / Morsidi Ayob. (2015) [Student Project] (Unpublished)

Proposed construction and completion one unit of stall for Majlis Daerah Tampin / Mohammad Amierul Aiman Azmie. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

B

Arbitration in construction industry in Malaysian / Nor Azmi Bakhary and Azmi Othman. (2005) [Research Reports] (Unpublished)

Effectiveness of operational on ice thermal energy storage system / Rudy Irawan Bakri. (2003) Degree thesis, thesis, Universiti Teknologi MARA.

C

A study on maintenance management of school building in Perak Tengah District / Ahmad Fahmi Che Lah and Mohd Azian Zaidi. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

The proposed designs modular of low-cost workers camp housed by using recycling container at the construction site / Jacksmith L. drecksson Claudius and Zainal Abidin Akasah. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch. (Unpublished)

F

Contractors' perception towards behavior-based safety (BBS) system in construction industry / Nina Sakina Fourzan. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.

G

Pre-construction and post construction dilapidation survey / Muaz Ghazali. (2017) [Student Project]

H

Repairing work during defect liability period case study at TPI Jalan Halimah, Tampoi, byJohor / Mohamad Hafiq Danial Hamdan. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Contractors’ perspective on construction waste minimisation : strategies and barriers / Nik Nurul Salsabila Hasan Nualdin and Norazlin Mat Salleh. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

Awareness of contractors in CIDB Green Card Program / Mohammad Jusri Hashim. (2004) Degree thesis, thesis, Universiti Teknologi MARA.

I

Construction manager's (CMs) skills and project performance / Irewolede Ijaola and Olabode Ogunsanmi. (2018) Built Environment Journal (BEJ), 15 (1). pp. 1-11. ISSN 1675-5022

Solution to avoid mistakes done by the contractor in tender submission / Megat Aridh Ilmi and Mohd Esham Mamat. (2020) In: QS Colloquium 2020 Series XII.

Challenges faced by G1 contractors / Fatin Nabilah Imam and Mohd Esham Mamat. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

A framework of the safety culture for the Malaysian construction organisations / Faridah Ismail. (2009) PhD thesis, thesis, Universiti Teknologi MARA.

The knowledge of contractors on alternative dispute resolution (ADR) in Kuching, Sarawak / Noor Akmal Adillah Ismail ... [et al.]. (2011) [Research Reports] (Unpublished)

Identification of construction quality parameters / Rafidah Ithnin. (2006) [Student Project] (Unpublished)

J

The employment of foreign workers in maintenance industry / Nor Syizwani Jamawi. (2009) [Student Project] (Unpublished)

Factors that led to poor involvement of local labour in Malaysian construction industry / Nur Shazana binti Jeffri and Teh Zahariah binti Nasaruddin. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

K

Process of pre-dilapidation on survey at Bandar Damai Perdana 56000 Cheras, Kuala Lumpur / Zarina Kadis. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Success factors for stakeholder management for public-private partnerships infrastructure projects / Sakinah Khalidah Kaharuddin, Hamimah Adnan and Har Einur Azrin Baharuddin. (2020) Built Environment Journal (BEJ), 17 (2). pp. 1-10. ISSN 1675-5022

The installation of water reticulation pipe system in Universiti Sultan Zainal Abidin, Kuala Terengganu / Nur Liyana Kamarudin. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Issues and challenges faced by quantity surveyors during final account preparation / Nur Khairina Khairul Hisham. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.

L

Identifying level of awareness on sufficiency of safety and health requirements amongst contractors / Nor Suzila Lop, Izatul Farrita Mohd Kamar and Norazlin Mat Salleh. (2012) In: The 9th Regional Symposium of the Malay Archipelago, 11-12 December 2012, Al Khawarizmi Lecture Hall, UiTM Perak.

M

A case study on demolition work in Malaysia / Mohd. Zafarizan Mohd. Sarbini. (2009) [Student Project] (Unpublished)

Pengurusan dan pentadbiran pembinaan oleh kontraktor menurut perspektif islam / Fadzleen Syaheeda Mohd Shukri. (2002) Degree thesis, thesis, Universiti Teknologi MARA.

Industrialised building system’s business model in improving the performance of SME contractors in Malaysia / Mohamed Rizal Mohamed. (2021) PhD thesis, thesis, Universiti Teknologi MARA.

Satu kajiselidik mengenai pandangan penghuni-penghuni terhadap rumah awam kos rendah di kawasan Bandar Tun Abdul Razak, Cheras, Kuala Lumpur / Mahdan Mohamed. (1985) [Student Project] (Unpublished)

Investigation on roles and task of construction managers in developing construction management competency: perspectives from Malaysian construction industry / Siti Sarah Mat Isa, Wan Norizan Wan and Farhan Md. Dahlan. (2012) In: The 9th Regional Symposium of the Malay Archipelago, 11-12 December 2012, UiTM Perak.

Development of underground structure case study: additional car parking space at Sogo complex / Nur Syaimira Mat Rosli. (2010) [Student Project] (Unpublished)

Professional competency for building control personnel in Malaysian local authorities / Nur Fazirah Mazlan. (2021) [Student Project] (Unpublished)

Dilapidation inspection project at Damansara / Mohamad Zulkifli Mazlan. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Kelambatan dan lanjutan masa : implikasi kepada kontraktor pembinaan / Nor Ashikin Mazlan. (2005) Degree thesis, thesis, Universiti Teknologi MARA.

Ineffective implementation of risk management among sub-contractors: a conceptual paper / Nurqameela Md Radzi, Kartina Alauddin and Mohmad Mohd Derus. (2018) In: 3rd International Conference on Rebuilding Place (ICRP2018), 13-14 September 2018, Impiana Hotel, Ipoh, Perak, Malaysia.

Staindard Operation Procedure (SOP) to appoint contractor in maintenance work / Muhammad Faizul Md Rani. (2017) [Student Project] (Unpublished)

Delay in school project in Lembah Klang / Hasniza Md. Kasa. (2005) Degree thesis, thesis, Universiti Teknologi MARA.

Peranan Juru Ukur Bangunan dalam penyelenggaraan bangunan bagi konteks pihak berkuasa tempatan / Rosman Mohamad. (2009) [Student Project] (Unpublished)

A study on the implementation of in-house authority / Hasbullah Mohamed @ Ibrahim. (2006) Degree thesis, thesis, Universiti Teknologi MARA.

Concept of partnering in Malaysian construction industry / Asmaa Mohamed @ Salleh. (2001) Degree thesis, thesis, Universiti Teknologi MARA.

Leadership style influence on adoption of an improved process innovation by Malaysian construction companies / Shazwan Mohamed Shaar. (2017) PhD thesis, thesis, Universiti Teknologi MARA.

Leadership style influence on adoption of an improved process innovation by Malaysian construction companies / Shazwan Mohamed Shaari. (2018) In: The Doctoral Research Abstracts. IPSis Biannual Publication, 13 (13). Institute of Graduate Studies, UiTM, Shah Alam.

A generic competency framework for entry level construction managers in Malaysia / Haryanti Mohd Affandi. (2014) PhD thesis, thesis, Universiti Teknologi MARA.

Process of home improvement management for poor houses under "Program Pembasmian Kemiskinan Bandar" (PPKB) in Majlis Bandaraya Melaka bersejarah (MBMB) area of administrations (phase 1) 2018 / Noor Marahaini Mohd Ali Janah. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Planned maintenance management case study (Kompleks Islam Kuala Selangor, Selangor Darul Ehsan) / Nurzulaikha Mohd Arif. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

The contractors’ attributes for the construction project success / Mohd Hafiz Saberi ... [et al.]. (2015) In: Proceedings of Postgraduate Conference on Global Green Issues (Go Green), 7-8 October 2015, Dewan Kuliah Al-Khawarizmi Universiti Teknologi MARA Cawangan Perak.

Highly developed safety vest for construction high-rise building / Fatin Hazira Mohd Jamil. (2021) [Student Project]

Standard operating procedure (SOP) of building dilapidation survey / Muhammad Syafiq Mohd Kamil. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Awareness level of contractors in Perak towards the sustainable practice of construction waste on site / Nur Farhana Mohd Nadzir and Zaiwannizar Zainal Abidin. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

Cost impact in implementing green materials in Malaysia’s housing construction / Nur Nabila Suhada Mohd Noh and Dr Suhaila Ali. (2020) In: QS Colloquium 2020 Series XII.

Faktor-faktor kelewatan penyiapan projek oleh kontraktor kelas A di Kuching, Sarawak / Siti Nur Aishah Mohd Noor … [et al.]. (2010) [Research Reports] (Unpublished)

Safety and health of foreign workers at construction site / Mohd Shafeeq Al Bakry Mohd Shailan. (2010) [Student Project] (Unpublished)

The management of abandoned project by local authority in Selangor / Mohd Sharafuddin Azaly Mohd Shukry. (2015) [Student Project] (Unpublished)

Antecedents of export performance : empirical evidence from Malaysian construction professional consultants / Datuk Ir Haji Abdul Latif Mohd Som. (2014) In: The Doctoral Research Abstracts. IPSis Biannual Publication, 6 (6). Institute of Graduate Studies, UiTM, Shah Alam.

Contract and tendering process / Nor Emyzan Mohd Yusak. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Civil Work Enterprise / Rosmazatul Hashima Mohd Khalil ... [et al.]. (2003) [Entrepreneurship Project] (Unpublished)

Case study on designing a standard single storey house building plan for Kampung Tebobon Baru / Michelle Majalap Mojiun. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Contractor’s perspective toward construction delay in road projects / Nur Nadhirah Muda and Nurul Huda Muhamad. (2020) In: QS Colloquium 2020 Series XII.

Peranan dan tanggungjawab Juruukur Bangunan di dalam pihak berkuasa tempatan di Lembah Klang / Siti Zubaidah Muhalid. (2004) Degree thesis, thesis, Universiti Teknologi MARA.

The concept of inter - firm partnering practice between client and contractor in the construction projects / Faridah Muhamad Halil, Mohamad suffian Hasim and Siti Mazuen Kamaruddin. (2021) Advances in Business Research International Journal, 7 (1): 5. pp. 94-104. ISSN 2462-1838

The necessity of the refurbishment at the shopping complex from the customers' points of view case study: Kompleks Teruntum, Kuantan,Pahang Darul Makmur / Mastura Musa. (2010) Degree thesis, thesis, Universiti Teknologi MARA.

Types of building services at mall / Soraya Baizureen Mustafa. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

N

Pengeluaran sijil perakuan menduduki bangunan oleh pihak berkuasa tempatan / Jannatul Akmal Nizamuddin. (2000) Degree thesis, thesis, Universiti Teknologi MARA.

Building condition assessment for community Hall of PR1MA Residensi Taman Kamunting Aman / Noor Nazliatul Natasha Nor Azmi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Tender process Medini Signature, 2 Blocks Apartment in Mukim Pulai, Daerah Johor Baru, Johor Darul Ta’zim / Nurulaina Iffah Norhisham. (2015) [Student Project]

O

Revitalization of Old Township, Little India, Ipoh / Nurul Maizatul Akmar Omarzaki. (2021) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

P

E-construction: in relation of implementation in local authorities / Romuald Kuha Pius Kuha. (2003) Degree thesis, thesis, Universiti Teknologi MARA.

R

Low cost housing defect / Nur Ain Rahamat. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Performance of contractor : project delay / Muhammad Hakam Ilhan Razali and Hafizah Mohd Latif. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

Renovation work process at Pusat Ilmu, Headquaters of Mardi Serdang, Selangor / Ainnur Amirah Roslan. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Delima Consult Sdn. Bhd.: Double-storey bungalow Shah Alam / Muhammad Nastha Shafiq Roslee. (2016) [Student Project] (Unpublished)

Communication barriers between local contractors and foreign unskilled labour / Muhamad Farhan Rosli and Kharizam Ismail. (2018) In: 3rd Undergraduate Seminar on Built Environment and Technology 2018 (USBET2018), September 2018, Universiti Teknologi Mara Perak Branch.

The catalyst for property development in Bandar Tasik Selatan / Munirah Rosli. (2010) Degree thesis, thesis, Universiti Teknologi MARA.

Measuring maintenance performance of food court under local authority : Ipoh City Council, Perak Malaysia / Nuriffah Ruslan and Junainah Mohamad. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

Study on cleaning work at Laguna Biru Apartment / Norfatihah Rusli. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

S

Quality management in property maintenance management focus on industrial building / Shuriati Samsu. (2001) Degree thesis, thesis, Universiti Teknologi MARA.

Leadership style in maintenance management / Norhayati Suid. (2009) [Student Project] (Unpublished)

Study on the determination of nominated subcontractor / Mohd Izwan Shah Fadzil. (2003) Degree thesis, thesis, Universiti Teknologi MARA.

Post occupancy evaluation on occupant comfort in Universiti Teknologi MARA (UiTM) Puncak Alam campus / Muhamad Mustakim Sali. (2012) Degree thesis, thesis, Universiti Teknologi MARA.

Construction of Perumahan Rakyat Miskin Tegar (PPRT) House / Vanessa Simon. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Critical success factors in workplace in relation with KPI in construction industry in Sarawak / Geraldine Emma Sinsoon. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.

Digitilising the integration of construction site information as a mean to reduce delay risks / Hanni Nur Hidayah binti Suria and Hafizah Mohd Latif. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

Building condition survey report at Lot 2, Jalan Hang Lekiu, Bandar Hilir Melaka / Syarifah Nur Adlin Syed Abdul Wahed. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

The effectiveness of maintenance management of services in shopping complex building : Plaza Alam Sentral, Shah Alam / Syed Mohamad Fahmi Wafa Syed Jalaluddin. (2009) Degree thesis, thesis, Universiti Teknologi MARA.

T

Contractor's perception towards communication barrier at construction site / Faezah Tairin. (2020) Degree thesis, thesis, Universiti Teknologi MARA Cawangan Sarawak.

Tendering process at Giat MARA Raub Pahang / Rabiatul Adawiyah Talib. (2015) [Student Project]

W

Site investigation practice among consulting engineers in Penang / W. Mohd Hijazi W. Isa. (2007) [Student Project] (Submitted)

The influence of project characteristics on contractual behaviour of key participants in civil engineering projects / Wan Norizan Wan Ismail and Hamimah Adnan. (2020) Built Environment Journal (BEJ), 17 (2). pp. 75-84. ISSN 1675-5022

Building information modelling (BIM) adoption in contractor organisations / Wan Nur Syazwani Wan Mohammad, Mohd Rofdzi Abdullah and Sallehan Ismail. (2018) In: 3rd International Conference on Rebuilding Place (ICRP2018), 13-14 September 2018, Impiana Hotel, Ipoh, Perak, Malaysia.

Y

Developing a framework for the success of international development projects in the Maldives / Mohamed Yamin… [et.al]. (2016) International Journal Of Service Management And Sustainability (IJSMS), 2 (1). pp. 1-15. ISSN 2550-1569

Keberkesanan penggunaan IT dalam membantu pengurusan kontrak-kontrak JKR (modul skala) / Mohd Fadzil Yusoff. (2003) Degree thesis, thesis, Universiti Teknologi MARA.

Z

The effectiveness of maintenance infrastructure work in UiTM / Meor Mohd Fadzli Zahid. (2005) Degree thesis, thesis, Universiti Teknologi MARA.

Penyesuaian peribadi eksekutif ekspatriat syarikat pembinaan Malaysia di negara tamu : satu analisis / Halmi Zainol dan Mohmad Mohd Derus. (2012) In: The 9th Regional Symposium of the Malay Archipelago, 11-12 December 2012, Al Khawarizmi Lecture Hall, UiTM Perak.

Rectification work before handing over / Muhamad Khairul Aziem Zulkifli. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

The significance of components of centralised labour quarter (CLQ) standard for workers’ housing and amenities / Muhamad Afiq bin Zully Romzi and Asmalia Che Ahmad. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

This list was generated on Sat Jun 25 07:31:17 2022 UTC.