Abstract
The purpose of this report is to identify the rectification work in Centre of Foundation Studies, International Islamic University Malaysia, Gambang campus. In chapter 1 it will tell about all the company background, organizational chart and other related detail of the company.
In chapter 2, the general information about rectification, rectification cost, the types of rectification and also the handing over process is based on literature review through the relevant sources such as books, journal and others.
Next for the chapter 3 which is focus in case study. All the rectification and installation works must be presented clearly based on the case study selected. Through this information based on the case study, the primary sources based on working experience or practice on site will be clearly gathered. Lastly, the final chapter will discuss all the problem and recommendation in chapter 1 until chapter 3 which is problem solving matters.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Zulkifli, Muhamad Khairul Aziem 2015868674 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Baharuddin, Mohd Nurfaisal UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Contractors T Technology > TH Building construction > Contractors > Malaysia T Technology > TH Building construction > Building inspection T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings T Technology > TH Building construction > Architectural engineering. Structural engineering of buildings > Sustainable buildings. Sustainable construction |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Rectification work, Handing over, International Islamic University Malaysia, Gambang campus |
Date: | 2018 |
URI: | https://ir.uitm.edu.my/id/eprint/49281 |