Browse by Types of Document
Gas treatment (air scrubber) / Mohamad Fadli Mohd. Yusoff, Muhd. Syarif Khalid and Rosita Baslan.
(1996)
[Student Project]
(Unpublished)
Efficiencies of finger joint of Light Red Meranti (experimental work) / Arshad Jamaluddin.
(1996)
[Student Project]
(Unpublished)
Peranan institusi pondok dalam pendidikan masyarakat kajian di Pondok Pasir Tumboh, Kota Bharu, Kelantan / Norizam@Nor Risham Ismail … [et al.].
(1996)
[Student Project]
(Submitted)
A study on the role of credit management unit of Telekom Malaysia Bhd (Kuching) / Faridah Ismail.
(1996)
[Student Project]
(Unpublished)
Kajian implikasi pembangunan industri di kawasan luar bandar serta implikasi terhadap kawasan dalaman dan persekitarannya . kajian kes : Kampung Gajah , Perak / Mariani Harun.
(1996)
[Student Project]
(Unpublished)
The probable modal split of commuters in Jalan Pudu with the introduction of LRT System 1 / Esrifairuz Subohi.
(1996)
[Student Project]
(Unpublished)
Documentation storage: integrated documents management (IDM ) at Integrated Logistics Berhad - Warehouse No. 6 Subang Jaya / Al Azmi Abdul Rahman.
(1996)
[Student Project]
(Unpublished)
A study towards improving road safety through accident prevention and accident reduction measures (Kinta Kellas) / Ahmad Azzineizar Md. Jaffni.
(1996)
[Student Project]
(Unpublished)
A study on the importance of production planning in an automobile industry / Hashiroh Omar.
(1996)
[Student Project]
(Unpublished)
Implementation of JIT: focusing on Matsushita Electronic Device (M) Sdn Bhd (MEDEM) / Zaiton Mohd Napiah. (1996) [Student Project] (Unpublished)
Magnetic ceramic / Norzaidi Khamis and Md. Azmi Baba.
(1996)
[Student Project]
(Unpublished)
Pembangunan pelancongan Jeram Besu di Daerah Raub / Razlina Raus. (1996) [Student Project] (Unpublished)
A study on complaints related to residential fixed line telephone service provided by Telekom Malaysia within Setapak Exchange / Tengku Badreeshah Raja Hussin. (1996) [Student Project] (Submitted)
A study on the KTM komuter’s customer service performance provided by the tele-marketeer team / Norzatulcima Jamaluddin.
(1996)
[Student Project]
(Unpublished)
Jendela automatik / Mazlan Berahim and Khairul Nizam Darus.
(1996)
[Student Project]
(Unpublished)
Pengurusan taman rekreasi. Kes kajian : Taman Tasik Titiwangsa, Kuala Lumpur / Fadzilah Ahmad. (1996) [Student Project] (Unpublished)
Unit Saham Amanah dan pengurusannya.
Kes kajian : Permodalan Nasional Berhad / Azimah Abdullah.
(1996)
[Student Project]
(Unpublished)
Kajian keberkesanan penggunaan garispanduan bagi kompleks perniagaan. Kes kajian : Ampang Point / Intan Zara Kusina Abd Manap.
(1996)
[Student Project]
(Unpublished)
Sistem pengurusan penyelenggaraan Kampus UiTM Shah Alam. Kes Kajian : Kolej Kediaman Seroja dan Kolej Kediaman Anggerik / Kartini Nordin.
(1996)
[Student Project]
(Unpublished)
Kajian keberkesanan nisbah plot di dalam mengawal pembangunan / Hishhram Hussain.
(1996)
[Student Project]
(Unpublished)
Implikasi pembinaan lebuhraya Utara-Selatan terhadap kawasan sekitar. Kes kajian : Rawang / Mohamad Ya'cub.
(1996)
[Student Project]
(Unpublished)
Kajian kepentingan penyediaan perancangan kemudahan sukan oleh Pihak Berkuasa Tempatan / Norafidah Salleh.
(1996)
[Student Project]
(Unpublished)
Kajian kesesuaian dan keberkesanan perletakan sesebuah jejantas kepada pejalan kaki di kawasan perbandaran. Kajian kes : pusat bandar Petaling Jaya SS52 / Mohd Zaki Ismail.
(1996)
[Student Project]
(Unpublished)
Pengurusan penyelenggaraan bangunan ITM cawangan Kelantan yang baru / Mohd. Aminudin Abdul Muluk.
(1996)
[Student Project]
(Unpublished)
Behaviour of reinforced concrete beam under dynamic loading / Md Rasul Mohamad Nor.
(1996)
[Student Project]
(Unpublished)
Behaviour of reinforced concrete beam under dynamic loading / Azmi Aznan.
(1996)
[Student Project]
(Unpublished)
Kecacatan fasad luar bangunan di iklim panas dan lembap dengan penumpuan khusus kepada bangunan-bangunan sekitar Lembah Klang / Ghazali Mohd Amin.
(1996)
[Student Project]
(Unpublished)
Effect of loading rates to the fracture toughness on carbon manganese steel ASTM 516 grade 70 / Abdullah Abd. Ghani and Mohd Fadhir Abd. Rahman.
(1996)
[Student Project]
(Unpublished)
Blanking die process for production product / Marwan Hasan and Kamarul Baharin Mansor.
(1996)
[Student Project]
(Unpublished)
Prodstar - an application of MRP II software to production planning and control / Muzafar Ahamad,Mamat Tarmizi Abdul Ghani and Musa Mohd Ehsan.
(1996)
[Student Project]
(Unpublished)
Merekabentuk dan fabrikasi klip gauge untuk ujian dinamik dan keretakan / Norhisham Idris.
(1996)
[Student Project]
(Unpublished)
Zon keselesaan terma bagi siswa dan siswi di Institut Teknologi MARA / Patrick Juking, Rizal Omar dan Yusaini Samsudin.
(1996)
[Student Project]
(Unpublished)
Kajian mengenai proses "powder metallurgy" / Razali Abdul Rahman Bakar.
(1996)
[Student Project]
(Unpublished)
Capabilities study to produce 50 units of dining chair / Suhazley Hamid, Hisham Mat and Mohamad Khalid Mohd Yatim.
(1996)
[Student Project]
(Unpublished)
Stugdy of steel roof and wall-cliding sheet metals and computer-aided drafting / Walter Andrew Maurice, Azmie Jumit and Victor Glance Tiongin.
(1996)
[Student Project]
(Unpublished)
Design and fabrication of an extrusion teaching aid RIG / Wan Ali Wan Daud and Mohd Amijar Kadimon.
(1996)
[Student Project]
(Unpublished)
Determination of valuation techniques for target company on trading / services sector / Noor Azizah Zi. (1996) [Student Project] (Unpublished)
A study on the performance of government or state backed unit trusts / Nor Azlinah Rohani.
(1996)
[Student Project]
(Unpublished)
Islamic evaluation of bimb performance in relation to the conventional banks / Norsuhailaniza Abdullah.
(1996)
[Student Project]
(Unpublished)
Larkin Terminal : meeting the operators requirements / Nor Rashman A. Rahman.
(1996)
[Student Project]
(Unpublished)
Masalah pengabaian caruman di kalangan majikan: satu kajian di Pejabat Kumpulan Wang Simpanan Pekerja Batu Pahat Johor / Zeti Akhtar Mohamad Jaya.
(1996)
[Student Project]
(Unpublished)
Compression Coil Spring System / Nik Shaphiran Nik Wan and Nik Sulhan Nik Ariff.
(1996)
[Student Project]
(Unpublished)
Study on the effect of loading rate on fracture toughness of welded plate material / Khairul Azhan Zainal Abidin and Sukri Bakar.
(1996)
[Student Project]
(Unpublished)
A study on new consolidation services in United Seino Transportation (Malaysia) Sdn. Bhd. / Ahmad Qahar Yusoff.
(1996)
[Student Project]
(Unpublished)
A study on transport services for airline crew and the costing process / Ahmad Zuhairi Mohd. Amin.
(1996)
[Student Project]
(Unpublished)
The quality of service standard in MASKargo claim section / Azroy Majid Abu Bakar.
(1996)
[Student Project]
(Unpublished)
A case study of Malaysia Airlines (MAS) B737-400 domestic routes turnaround activity adherence to Malaysia Airlines (MAS) turnaround precision timings / Mimi Mendora Mushardin.
(1996)
[Student Project]
(Unpublished)
Customers' perceptions towards stationery section at Yaohan, The Mall / Mohamad Nazri Rob A'i.
(1996)
[Student Project]
(Unpublished)
Pengubahsuaian baby carrier / Amran Abu Bakar and Amriee Jelani.
(1996)
[Student Project]
(Unpublished)
Fatigue behaviour of sintered steel (HAP 10) under different tempering temperatures / Habiborlah Sheikh Salimullah and Awang Faizol Awang Sallam.
(1996)
[Student Project]
(Unpublished)
Pengurusan hartanah bidang niaga berpotensi / Mohd Rohaizad Abdul Rahman.
(1996)
[Student Project]
(Unpublished)
CAD/CAM application in manufacturing / Salwa Mohd Sayutti and Siti Jasmeen Mohd Hashim.
(1996)
[Student Project]
(Unpublished)
Penilaian kesan alam sekitar: sejauh manakah ianya mempengaruhi pembangunan hartanah kes kajian: Pulau Pinang / Mohamad Shahnaz Zubir.
(1996)
[Student Project]
(Unpublished)
Kajian ekonomi sampingan peneroka Felda Kahang Barat, Kluang, Johor Darul Takzim / Mohd Helmey Rahim.
(1996)
[Student Project]
(Unpublished)
Microwave nondestructive testing of composite materials (8 GHz TO 12 GHz) using a free-space technique / Abdul Hfiz Ahmed.
(1996)
[Student Project]
(Unpublished)
Projek kilang padi peranan dan masalah kajian kes di Pertubuhan Peladang Kangkong / Nural Ashikin Hamzah, Suryani Ismail and Zainul Adnan Mohd Rafek.
(1996)
[Student Project]
(Unpublished)
Pembangunan tanah rancangan (RPT Sungai Pas) masalah cabaran dan prospek masa hadapan / Ismail Awang ... [et al.].
(1996)
[Student Project]
(Submitted)
Fungsi elemen grafik yang terdapat pada aspek-aspek formal dalam seni pop di Malaysia / Shamsuddin Mohamed Safian.
(1996)
[Student Project]
(Unpublished)
Jasad lumpung berwarna: formulasi dan teknik / Norhaslinda Ismail.
(1996)
[Student Project]
(Unpublished)
Pengolahan bahan fiber dalam seni anyaman kontemporari / Ratni Khasuziyanti Mohd Khalid.
(1996)
[Student Project]
(Unpublished)
Kajian terhadap rekabentuk peralatan permainan gasing tradisional dan potensinya diperingkat antarabangsa / Norhayati Che Daud.
(1996)
[Student Project]
(Unpublished)
Kesan pembangunan pelancongan di pinggir pantai kes kajian: Teluk Kemang-Blue Lagoon (Batu 8-Batu 10) Port Dickson / Halijah Mohd Yassin.
(1996)
[Student Project]
(Unpublished)
Penggunaan elemen-elemen seni reka grafik pada jersi sukan bolasepak (tempatan) / Tuan Fadzlullah Tuan Yaacob.
(1996)
[Student Project]
(Unpublished)
Penerapan nilai budaya dan ragamhias Baba Nyonya dalam seni resist tekstil / Filzah Abd. Rahman.
(1996)
[Student Project]
(Unpublished)
Seramik studio di Malaysia / Raha Ja'afar.
(1996)
[Student Project]
(Unpublished)
Penggunaan unsur bunga-bungaan pada hiasan kepala masyarakat Melayu / Juhaida Kasim.
(1996)
[Student Project]
(Unpublished)
Pengenalan matawang di Malaysia (1786-1976) / Jasmizam Mansor.
(1996)
[Student Project]
(Unpublished)
Gerlis Tenmoku / Nor Azurah Seni.
(1996)
[Student Project]
(Unpublished)
Kelewatan perlaksanaan projek-projek pembangunan anjuran MARA / Yanti Sodimin.
(1996)
[Student Project]
(Unpublished)
Alat pembalut buah mangga / Abdul Rahim Musa.
(1996)
[Student Project]
(Unpublished)
Mesin pengupas kelapa / Azli Mohamed, Ahmad Makhdzani Mohamed and Mohd Zaid Mat Jusoh. (1996) [Student Project] (Unpublished)
Analisis kesalahan tatabahasa (aspek morfologi) di kalangan pelajar sekolah menengah: kajian kes pelajar tingkatan dua Sekolah Menengah Dato' Mansor, Bahau, Daerah Jempol, Negeri Sembilan / Ab. Rahman Said, Baharuddin Suib and Abd. Aziz Awang Darus. (1996) [Student Project] (Submitted)
Satu kefahaman tentang HIV dan AIDS di kalangan pelajar-pelajar tingkatan satu sekolah menengah rendah: tumpuan di Sekolah Menengah Benut, Pontian / Abd. Jabar Othman and Jaziah Shahar. (1996) [Student Project] (Submitted)
Keberkesanan pembelajaran tulisan jawi di Sekolah Agama Bandar Segamat, Segamat, Johor Darul Takzim: kajian kes pencapaian pelajar-pelajar 1991 -1995 / Abdullah Said, Zainab Talib dan Hashim Majid.
(1996)
[Student Project]
(Submitted)
Solar water heater / Azizi Abdullah.
(1996)
[Student Project]
(Unpublished)
Reliability centered maintenance / Azlan Mohd. Yusoff and Kamarudin Saleh.
(1996)
[Student Project]
(Unpublished)
A study on properties of wax (palm oil based) for industrial uses on machining application / Muhamad Azli Alias and Badaruddin Abdul Wahab.
(1996)
[Student Project]
(Unpublished)
Instrumented Charpy impact test / Syamsul El-Adha and Haidil Mustafa.
(1996)
[Student Project]
(Unpublished)
Thermal energy system with chilled water storage / Ibrahim Mohamad and Maliki Abdul Ghani.
(1996)
[Student Project]
(Unpublished)
Power metallurgy / Razali Abdul Rahman Bakar and Dayang Norhayati Abang Ibrahim.
(1996)
[Student Project]
(Unpublished)
CAD/CAM of industrial product / Abdul Rahman Yusof and Rasli Mohamad.
(1996)
[Student Project]
(Unpublished)
Mesin mengambil dan meletak menggunakan sistem pengaturcaraan kawalan logik / Shamsudin Tahir, Ahmad Adzuan Kamaruddin and Ahmad Salehin Mohd. Sani.
(1996)
[Student Project]
(Unpublished)
Brace support / Rosli Samat and Mohammad Nazri Sulaiman.
(1996)
[Student Project]
(Unpublished)
Kajian kes penyenggaraan pam air di kampus induk Institut Teknologi MARA Shah Alam / Mohd. Azhar Taib.
(1996)
[Student Project]
(Unpublished)
Alat pengupas kelapa / Affandi Rumpa and Dayang Fatimah Abang Shebli.
(1996)
[Student Project]
(Unpublished)
Machining practies in Malaysia industries / Tony Jerry and Norizah Mohd Ghani.
(1996)
[Student Project]
(Unpublished)
Criteria that’s needs of hydropower in Peninsular Malaysia / Zailani Sabaludin, Azidah Puteri Buang and Saidin Syazli Rosli.
(1996)
[Student Project]
(Unpublished)
Menambah bilangan buaian sistem enjutan lebih dari satu unit dengan menggunakan satu penggerak / Rasyidah Othman and Mohd Daniel Abu Khanafiah.
(1996)
[Student Project]
(Unpublished)
Penjadualan menggunakan komputer / Nazzattul Shyma Mohd Hair and Norhanani Ahmad.
(1996)
[Student Project]
(Unpublished)
Penunjuk suhu bersiren / Megat Syamshul Anuar and Mohamad Arief Mohd Raffi.
(1996)
[Student Project]
(Unpublished)
Beban penyejuk di dewan kuliah besar / Ismail Aziz.
(1996)
[Student Project]
(Unpublished)
Computer aided cost estimating system / Abdul Halim Ali and Mohd Zulhairi Mohd Noor.
(1996)
[Student Project]
(Unpublished)
MRPII and its applications / Ahmad Joraimee Mohamad and Nazrin Zakaria.
(1996)
[Student Project]
(Unpublished)
Pengiraan untuk perawatan air buangan / Mohd Suhaimi Manan.
(1996)
[Student Project]
(Unpublished)
Troli pneumatik bagi penggunaan bahagian tangga / Suhidi Al-Zahar Ibrahim, Suhaihisam Mohd Saufi and Mohd Fariz Abd. Aziz.
(1996)
[Student Project]
(Unpublished)
Fabrication of automatic C.N.C. (computer numerical control) bar puller / Hairul Amri Abd. Rashid and Mohamad Ariff Juma'at.
(1996)
[Student Project]
(Unpublished)
Sistem pentadbiran Mahkamah Syariah Sarawak: satu tinjauan / Riza Johari and Hjh Korniati Hj Khalik.
(1996)
[Student Project]
(Unpublished)
The accuracy of profit forecast of initial public offer (IPOS) for the companies registered in Kuching, Sarawak/ Siten Siam.
(1996)
[Student Project]
(Unpublished)
A study on the effectiveness of Telekom Malaysia Payphone SBU Marketing strategies on public telephones services / Olek Enjo @ Olek Abdullah.
(1996)
[Student Project]
(Submitted)
Developing an efficient terminal: Kenderaan Klang Banting Berhad / Shamsul Amri Ekmal Hijaz.
(1996)
[Student Project]
(Unpublished)
A marketability study of Malaysia Airports Berhad retailing business at Kuching International Airport / Junaidi Hj. Ambol.
(1996)
[Student Project]
(Unpublished)
Role of the industrial court cawangan timur in maintaining industrial harmony to be submitted as a course requirement / Jimali Sunang, Let Rukim and Margaret Philip Bedus.
(1996)
[Student Project]
(Unpublished)
A study on vehicle scheduling system at Diperdana Corporation Berhad Pasir Gudang Johor / Noor Malinjasari Ali.
(1996)
[Student Project]
(Unpublished)
A study on order cycle process at Tamadam Bonded Warehouse / Hasmi Mokhlas.
(1996)
[Student Project]
(Unpublished)
Quantitative study on product damages at Hitachi Transport System ((M) Sdn. Bhd. warehouse, Bandar Baru Bangi Selangor Darul Ehsan / Musrizalie Abd. Mutalip. (1996) [Student Project] (Unpublished)
A feasibility study on export operation of EAC Transport Agencies (M) Sdn. Bhd. / Mazlil Rizal Abd. Majid.
(1996)
[Student Project]
(Unpublished)
Masalah penyalahgunaan dadah di bandaraya Kuching / Ameran Ali and Julaihi @ Ley Tol.
(1996)
[Student Project]
(Unpublished)
Computer control of batch process plant (software and hardware development) / Abd. Shukor Kelinng.
(1996)
[Student Project]
(Unpublished)
Active filter for harmonic and reactive power compensator / Abdul Manap Hanafi.
(1996)
[Student Project]
(Unpublished)
To study the impact of urbanisation on water quality of a river: a case study Sg. Damansara, Petaling Jaya / Anding Unchi.
(1996)
[Student Project]
(Unpublished)
An investigation on the punching shear capacity of plastered brickwall / Azhar Abdullah.
(1996)
[Student Project]
(Unpublished)
Heuristic approach to solution of unit commitment for electrical system / Azizan Harun.
(1996)
[Student Project]
(Unpublished)
Iron removal by intermittent sand flitration / Azlan Mohamad Saad.
(1996)
[Student Project]
(Unpublished)
Soil erodibility study at Sepang, Batu Dam and Puchong areas / Bakri Dahalan.
(1996)
[Student Project]
(Unpublished)
Optimization of batch process plant (software development) / Lob Muhammad Abdul Shukur.
(1996)
[Student Project]
(Unpublished)
A study on industrial location: a comparative analysis of Shah Alam and Klang industrial parks / Mulyadee Daud.
(1996)
[Student Project]
(Unpublished)
Analysis on the reliability of sclerometer test results / Mohd. Norli Md. Saleh.
(1996)
[Student Project]
(Unpublished)
Analysis of thin - walled frame structure / Rahman Slamat.
(1996)
[Student Project]
(Unpublished)
Nonlinear analysis of reinforced concrete beam : a case study / Zulkornain Yusoff.
(1996)
[Student Project]
(Unpublished)
Enhancement of the scheduling algorithm (software and interfacing development)/ Zuraini Ab Rashid.
(1996)
[Student Project]
(Unpublished)
The modelling of thermal behaviour of Kaolin clay at different temperatures / Adnan Abdullah and Zuraidi Hanafi Hanafi.
(1996)
[Student Project]
(Unpublished)
Solving problems of production process. A case study in a battery making factory / Ahmad Fakhrul Amin Mohd and Janting Nyanggau.
(1996)
[Student Project]
(Unpublished)