Items where Division is "Faculty of Architecture, Planning and Surveying" and Year is 2012

Group by: Creators | Item Type | No Grouping
Number of items: 55.

Proposed new interior design of 4x4 centre for 4x4 Shoppe & Service Sdn Bhd at Lot 211, Seksyen 24, Jalan Empayar Off Persiaran Sultan Ibrahim KU1, Mukim Klang, Klang Bandar Diraja, Daerah Klang, Selangor Darul Ehsan / Muhammad Arif Abd Latif. (2012) [Student Project] (Unpublished)

The method construction to build roof trusses / Muhammad Amirul Abdul Rahman. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pembuatan konkrit siap bancuh di kilang / Afiq Faiz Ahmad. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Prosedur pembinaan sistem perparitan kotak pembentung / Muhammad Fahmi Ahmad Kamarudin. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Proposed new interior design of Skateline One - Stop Training Centre at Lot 2395, Seksyen 41, Jalan Sultan Ismail, Bandaraya Kuala Lumpur for Eco Sports Malaysia Sdn. Bhd / Muhammad Syazwan Fitri Ahmad Zama. (2012) [Student Project] (Unpublished)

Kaedah pengurusan sumber di tapak bina / Muhammad Shahaidil Ami Nuzairi. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pembinaan lantai bawah (non-suspended ground slab) / Muhammad Amirul Shafiq Amran. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kecacatan bangunan: jenis, punca dan prosedur / Muhammad Hafeez Amran. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction of pile foundation / Adila Syahira Aris Kamalizan. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Cerucuk konkrit bertetulang / 'Adil Azman. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Preliminary construction of reservoir water level control / Muhammad lkmal Ariff Azmee. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kolej kediaman sebagai keperluan semasa dalam meningkatkan kualiti kehidupan pelajar di UiTM Perak / Muhammad Fadhil Bahrin. (2012) [Student Project] (Unpublished)

Penerapan aktiviti riadah bagi golongan orang kurang upaya (OKU) di taman rekreasi awam, Taman Perbandaran Pulau Pinang / Nurazureen Daud. (2012) [Student Project] (Unpublished)

Pengurangan air tanpa hasil / Muhammad Suhaili Fadzil. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pembinaan kekuda bumbung dan pemasangan kekuda bumbung / Muhamad Nurfakiq Fauzi. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Prosedur sebelum, semasa dan selepas mendapat tender projek Universiti Sains Malaysia / Muhammad Nashrul Hafizh Nazri. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Perlantakan cerucuk konkrit bertetulang (R.C. Pile) untuk Masjid Batu 8, Kuantan Pahang / Ros Hidayu Harun. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Certificate of Completion and Compliance / Siti Solehah Hassan. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Proses pemasangan kemasan bagi 1 unit rumah banglo 2 tingkat dipetak 1-6, PT 3244-PT3253, Seksyen 69 Mukim Guntong, Daerah Limbat, Jajahan Kota Bharu, Kelantan / Nor Diana Ibrahim. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Penerapan konsep dan nilai-nilai Islam di Taman Tasik Shah Alam, Selangor Darul Ehsan / Muhammad Fariz Ishak. (2012) [Student Project] (Unpublished)

Kaedah pembinaan dinding kedap bunyi di pawagam / Mohamad Saufi Ismail. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Wall construction / Zulkifli Jali. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Proposed interior new design of theme café at No.32, 32A & 32B, Jalan Plumbum Q7/Q, Seksyen 7, 40000 Shah Alam, Selangor Darul Ehsan for Mat Salai Sdn Bhd / Mohamad Haniff Johar. (2012) [Student Project] (Unpublished)

Faktor-faktor kelewatan projek / Nur Rasyidah Kamaruddin. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pembinaan struktur bangunan berasaskan konkrit bertetulang / Nur Atirah Kamaruzaman. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Proposed new interior design sheme of Buntil D’Genuine for Buntil at P.T No.7, Batu Tiga Federal Highway, Mukim Damansara, Daerah Petaling, Selangor / Mazliatun Nur Hidayah Khairuddin. (2012) [Student Project] (Unpublished)

Reka bentuk sejagat di dalam kawasan taman awam, Taman Tasik Titiwangsa, Kuala Lumpur / Lukman Hakim Lias. (2012) [Student Project] (Unpublished)

Pemasangan struktur komponen konkrit pra-tuang / Ainur Fatheen Nadiha M. Hatta. (2012) Industrial Training. Universiti Teknologi MARA, Perak.

Sistem batu-bata saling bertaut (IBS) / Muhammad Adam Mahmood. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of cast in situ bored pile / Nurhamizah Md Anuar. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pembinaan sistem saliran permukaan (surface drainage system) / Mohd Hafizi Mohamad Shukri. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah ikatan bata / Zulfikar Mohamed Raji. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pembinaan loji rawatan kumbahan/ Siti Nurfarrahafiqah Mohammad Rosli. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pemasangan bumbung / Ahmad Adzim Mohd Akhir. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pemasangan lantai kayu / Mohamad Asrul Nizam Mohd Asari. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah penanaman 'spun pile' / Awatif Mohd Radzi. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Bored pile construction / Siti Arfah Mohd Radzuan. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Perletakan Sekolah Jenis Kebangsaan (Cina) Tsung Hwa di Pusat Bandar Kuala Kangsar, Perak / Fatin Farhana Mohd Suhaimi. (2012) [Student Project] (Unpublished)

Construction methods of sewage treatment plant / Mohd Shah Kimi Reduan Mohd Zaki. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pengeluaran Perakuan Pematuhan Siap (CCC) bagi projek perumahan di Tanjung Lumpur, Kuantan / Nor Syakila Nordin. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pembinaan asas pad dan asas jalur / Muhammad Hamdi Omar. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Proposed upgrading work of Pusat Kebudayaan dan Kesenian Negeri Sembilan at Jalan Sungai Ujong, Seremban for Jabatan Kebudayaan dan Kesenian Negeri Sembilan / Mohammad Firdaus Othman. (2012) [Student Project] (Unpublished)

Quality of construction / Mohd Munzir Othman. (2012) [Student Project] (Submitted)

Pantai Melawi sebagai destinasi pelancongan pantai, di Bachok, Kelantan / Tengku Noramira Raja Omar. (2012) [Student Project] (Unpublished)

Pemasangan kamera litar tertutup (CCTV) / Nurul Amalina Rashid. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Proses pemilihan kontraktor / Nur Hidayah Razali. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Perletakan stesen bas ekspres di bandar Kangar, Perlis Indera Kayangan / Muhammad Haikhal Saad. (2012) [Student Project] (Unpublished)

Construction of retaining rubble wall / Ahmad Shahreezdzakuan Said. (2012) [Student Project] (Submitted)

Bahan, mesin dan peralatan di tapak / Nabilah Sarip. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Defect on plastering and its method of rectification / Kamil Fahmi Sazili. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Micropiling and its fundamentals / Syed Ahmad Najib Syed Mohd Naim. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah penanaman cerucuk konkrit bertetulang untuk membina bangunan pejabat 4 tingkat di Universiti Teknologi MARA Shah Alam / Muhammad Ameerul Yacob. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Sistem acuan konkrit besi / Mohamad Najmi Zahid Yahya. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kecacatan pada bangunan / Nur Aisyah Zainal Abidin. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Proses mendapatkan Sijil Perakuan Siap dan Pematuhan (CCC) / Nur Liyana Zakaria. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

This list was generated on Thu Apr 25 10:43:16 2024 UTC.