Browse by Types of Document

Number of items: 50.

Buletin Kampus Isu Dis 2012-Jan 2013 Bil. 13/ UiTM Kampus Kuala Terengganu. (2012) Bulletin. UiTM Kuala Terengganu, Kuala Terengganu, Terengganu.

Wall construction / Zulkifli Jali. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of cast in situ bored pile / Nurhamizah Md Anuar. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Sistem acuan konkrit besi / Mohamad Najmi Zahid Yahya. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The acceptance towards islamic banking product among non-muslim: A study at Bank Simpanan Nasional Pengkalan Chepa / Khairun Mohamed @ Ismail. (2012) Industrial Training. Universiti Teknologi MARA Cawangan Kelantan, Universiti Teknologi MARA Cawangan Kelantan. (Unpublished)

Industrial training report at Universiti Sains Malaysia Kubang Kerian 16150 Kota Bharu Kelantan / Fadila Amira Razali. (2012) Industrial Training. Faculty of Computer and Mathematical Sciences, Kota Bharu. (Submitted)

Prosedur sebelum, semasa dan selepas mendapat tender projek Universiti Sains Malaysia / Muhammad Nashrul Hafizh Nazri. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Buletin Kampus Isu Mei 2012 Bil. 11/ UiTM Cawangan Terengganu Kampus Kuala Terengganu. (2012) Bulletin. UiTM Press, UiTM Kuala Terengganu, Kuala Terengganu, Terengganu.

Kaedah pemasangan bumbung / Ahmad Adzim Mohd Akhir. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Faktor-faktor kelewatan projek / Nur Rasyidah Kamaruddin. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kecacatan pada bangunan / Nur Aisyah Zainal Abidin. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pemasangan kamera litar tertutup (CCTV) / Nurul Amalina Rashid. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah penanaman 'spun pile' / Awatif Mohd Radzi. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pembuatan konkrit siap bancuh di kilang / Afiq Faiz Ahmad. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Bored pile construction / Siti Arfah Mohd Radzuan. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Prosedur pembinaan sistem perparitan kotak pembentung / Muhammad Fahmi Ahmad Kamarudin. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Defect on plastering and its method of rectification / Kamil Fahmi Sazili. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Certificate of Completion and Compliance / Siti Solehah Hassan. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah ikatan bata / Zulfikar Mohamed Raji. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Perlantakan cerucuk konkrit bertetulang (R.C. Pile) untuk Masjid Batu 8, Kuantan Pahang / Ros Hidayu Harun. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Proses pemasangan kemasan bagi 1 unit rumah banglo 2 tingkat dipetak 1-6, PT 3244-PT3253, Seksyen 69 Mukim Guntong, Daerah Limbat, Jajahan Kota Bharu, Kelantan / Nor Diana Ibrahim. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pengurangan air tanpa hasil / Muhammad Suhaili Fadzil. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pengurusan sumber di tapak bina / Muhammad Shahaidil Ami Nuzairi. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah penanaman cerucuk konkrit bertetulang untuk membina bangunan pejabat 4 tingkat di Universiti Teknologi MARA Shah Alam / Muhammad Ameerul Yacob. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pembinaan kekuda bumbung dan pemasangan kekuda bumbung / Muhamad Nurfakiq Fauzi. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The method construction to build roof trusses / Muhammad Amirul Abdul Rahman. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The doctoral research abstracts Vol:2 2012 / Institute of Graduate Studies, UiTM. (2012) Bulletin. Institute of Graduate Studies, Shah Alam.

Buletin Perpustakaan Tengku Anis Edisi 2012 / Perpustakaan Tengku Anis. (2012) Bulletin. Perpustakaan Tengku Anis, Machang, Kelantan.

Wahana Lestari: Bil.5 2012 / Perpustakaan Tun Dr. Ismail Cawangan Johor, UiTM Johor. (2012) Bulletin. Perpustakaan Tun Dr Ismail, UiTM Johor, PTDI, UiTM Kampus Segamat, Johor.

Impact of digital marketing on customer relationship of Icon Smart Home company / Nur Faziera Zaidi. (2012) Industrial Training. Bachelor of Business Administrations (Hons) Marketing, Segamat, Johor.

Kaedah pembinaan loji rawatan kumbahan/ Siti Nurfarrahafiqah Mohammad Rosli. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction of pile foundation / Adila Syahira Aris Kamalizan. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Bahan, mesin dan peralatan di tapak / Nabilah Sarip. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pemasangan lantai kayu / Mohamad Asrul Nizam Mohd Asari. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Sistem batu-bata saling bertaut (IBS) / Muhammad Adam Mahmood. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Cerucuk konkrit bertetulang / 'Adil Azman. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pemasangan struktur komponen konkrit pra-tuang / Ainur Fatheen Nadiha M. Hatta. (2012) Industrial Training. Universiti Teknologi MARA, Perak.

Pembinaan lantai bawah (non-suspended ground slab) / Muhammad Amirul Shafiq Amran. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The doctoral research abstracts Vol:1 2012 / Institute of Graduate Studies, UiTM. (2012) Bulletin. Institute of Graduate Studies, Shah Alam.

Kaedah pembinaan dinding kedap bunyi di pawagam / Mohamad Saufi Ismail. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Preliminary construction of reservoir water level control / Muhammad lkmal Ariff Azmee. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Micropiling and its fundamentals / Syed Ahmad Najib Syed Mohd Naim. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pembinaan asas pad dan asas jalur / Muhammad Hamdi Omar. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kaedah pembinaan struktur bangunan berasaskan konkrit bertetulang / Nur Atirah Kamaruzaman. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Proses mendapatkan Sijil Perakuan Siap dan Pematuhan (CCC) / Nur Liyana Zakaria. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kecacatan bangunan: jenis, punca dan prosedur / Muhammad Hafeez Amran. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pengeluaran Perakuan Pematuhan Siap (CCC) bagi projek perumahan di Tanjung Lumpur, Kuantan / Nor Syakila Nordin. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction methods of sewage treatment plant / Mohd Shah Kimi Reduan Mohd Zaki. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Proses pemilihan kontraktor / Nur Hidayah Razali. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pembinaan sistem saliran permukaan (surface drainage system) / Mohd Hafizi Mohamad Shukri. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

This list was generated on Thu Mar 28 09:42:41 2024 UTC.