Items where Subject is "T Technology > TH Building construction > Systems of building construction. Industrialized building"

Up a level
Export as [feed] Atom [feed] RSS 1.0 [feed] RSS 2.0
Group by: Creators | Item Type
Jump to: A | D | I | J | K | M | N | O | R | S | T | Z
Number of items at this level: 30.

A

Ali, Mohd Hamidi (2009) Facilities management of public hall / Mohd Hamidi Ali. [Student Project] (Unpublished)

Awang, Mohd Hanif (2010) An investigation on the type of refurbishment works in UiTM Shah Alam / Mohd Hanif Awang. [Student Project] (Unpublished)

Abidin, Noraima Shafinaz (2014) Assessing construction players awareness with the machinery utilization in Malaysian construction sites / Noraima Shafinaz Abidin. [Student Project] (Unpublished)

Abu Bakar, Norashikin (2010) Implementation of energy efficiency system in office buildings / Norashikin Abu Bakar. [Student Project] (Unpublished)

Abu Samah, Nur Liyana (2013) Rainwater harvesting system for buildings in Malaysia / Nur Liyana Abu Samah. [Student Project] (Unpublished)

D

Dugel, Johari (1999) Kajian keselamatan pekerja dalam melakukan kerja penyelengaraan bangunan komersil / Johari Dugel. Degree thesis, Universiti Teknologi MARA.

I

Ibrahim, Mohd Aizuddin (2009) Maintenance safety in food factory / Mohd Aizuddin Ibrahim. [Student Project] (Unpublished)

Ibrahim, Mohd Alfi Syahrin (2013) A study on the fire fighting system in UiTM Shah Alam / Mohd Alfi Syahrin Ibrahim. [Student Project] (Unpublished)

Ismail, Faridah Hanim and Mohamad Yusuwan, Norazian and Baharuddin, Har Einur Azrin (2018) Success factors for initial works of industralised building system process of projects implementation / Faridah Ismail, Norazian Mohamad Yusuwan and Har Einur Azrin Baharuddin. Asian Journal of Environment-Behaviour Studies, 3 (9). pp. 1-13. ISSN 2514-751X

Ismail, Muhammad Zaidi (2015) The challenges implementation of photovoltaic system in the office buildings / Muhammad Zaidi Ismail. [Student Project] (Unpublished)

J

Jalil, Amirul Hafiz (2015) The awareness of sustainable construction in Malaysia / Amirul Hafiz Jalil. [Student Project] (Unpublished)

K

Kamaruddin, Siti Syariazulfa (2018) A framework of the economic factors and cost in the implementation of mechanisation and automation (M&A) in Industrialised Building System (IBS) approach / Siti Syariazulfa Kamaruddin. In: The Doctoral Research Abstracts. IGS Biannual Publication, 14 . Institute of Graduate Studies, UiTM, Shah Alam.

M

Mohd Nor, Nor Ain (2009) Refurbishment: a study of critical factor to be considered for building refurbishment / Nor Ain Mohd Nor. [Student Project] (Unpublished)

Mohd Rodzi, Mohd Ridhwan (2010) Zero energy building in Malaysia / Mohd Ridhwan Mohd Rodzi. [Student Project] (Unpublished)

Mohd Aseri, Nur Farahizyan (2019) Building 3D modelling of UiTM Arau Perlis Campus using Agisoft software / Nur Farahizyan Mohd Aseri. Degree thesis, Universiti Teknologi Mara Perlis.

Mat Nazir, Muhd Asyraf (2015) A study on the implementation of energy management system (EnMS) in the green building / Muhd Asyraf Mat Nazir. [Student Project] (Unpublished)

Md.Samsudin, Muhammad Amiruddin (2015) Assessing workplace ergonomic towards facilities satisfaction / Muhammad Amiruddin Md.Samsudin. [Student Project] (Unpublished)

Mohammad, Shasharina (2014) The awareness of BCA implementation among government school in Selangor / Shasharina Mohammad. [Student Project] (Unpublished)

Mohd Safian, Edie Ezwan (2015) Building and locational characteristics’ quality of purpose-built offices in Malaysia and their relationship with rentals / Edie Ezwan Mohd Safian. PhD thesis, Universiti Teknologi MARA.

Muhamad Halil, Faridah (2013) The implementation of strategic partnering in industrialised building system / Faridah Muhamad Halil. In: The Doctoral Research Abstracts. IPSis Biannual Publication, 4 (4). Institute of Graduate Studies, UiTM, Shah Alam.

N

Nik Kob, Nik Sharifullah (2000) Sistem pengurusan penyelenggaraan bangunan Institut Kemahiran MARA / Nik Sharifullah Nik Kob. Degree thesis, Universiti Teknologi MARA.

O

Osman, Azmin (1999) Penyelenggaraan sistem lif (Kes Kajian: Plaza Perangsang, Intekma Resort, Kajian Sains Gunaan I.T.M S.Alam, Kajian Kejuruteraan I.T.M S.Alam dan Kajian Sains Kesetiausahaan I T.M S.Alam) / Azmin Osman. Degree thesis, Universiti Teknologi MARA.

R

Romli, Mohd Razif (2009) Study of waterproofing failures and proper installation method / Mohd Razif Romli. [Student Project] (Unpublished)

Raja Prasad, S.V.S. (2018) Sensitivity analysis of safety performance of Indian construction organizations / S.V.S. Raja Prasad. Built Environment Journal (BEJ), 15 (1). pp. 41-56. ISSN 1675-5022

Rohimi, Muhammad Khusairy (2014) A study on resident perception towards rainwater harvesting application in domestic building / Muhammad Khusairy Rohimi. [Student Project] (Unpublished)

Rusli, Umi Fathiah (2015) The effectiveness of using effective microorganism (EM) for wastewater treatment in residential and industrial area / Umi Fathiah Rusli. [Student Project] (Unpublished)

S

Sinuzulan Shahalun, Mohd Ferdaus (2009) Major causes of lift breakdown in high rise building at Shah Alam / Mohd Ferdaus Sinuzulan Shahalun. [Student Project] (Unpublished)

Stephanie, Simson (2013) Assessment of lightning protection system in building / Stephanie Simson. [Student Project] (Unpublished)

T

Tomin, Mohd Najib (2010) Fire safety audit in library buildings / Mohd Najib Tomin. [Student Project] (Unpublished)

Z

Zainol Abidin, Nursyida (2009) A study on ventilation system at office building / Nursyida Zainol Abidin. [Student Project] (Unpublished)

This list was generated on Sat May 30 06:46:48 2020 +08.