Industrialised Building System installation for single storey house / Che Wan Nur Syazlyana Che Wan Sapawi

Che Wan Sapawi, Che Wan Nur Syazlyana (2021) Industrialised Building System installation for single storey house / Che Wan Nur Syazlyana Che Wan Sapawi. [Student Project] (Unpublished)
Abstract

IBS was initiated since the 1960s here in Malaysia and therefore the IBS proved to be a great success. Not only it is improving the standard and affordability of the projects but it also efficient in accelerating the development of housing projects. The objective of this report is to provide readers with a summary of experiences and learning to date associated with the IBS construction of 1 storey residential house. The implementation of IBS has encouraged production of fine quality materials within a shorter period of time, with lower material and labour cost. The property of homes is consistent and reliable, helping ensure homes with a protracted duration. Growth in adoption will accelerate economies of scale, meaning greater savings will be unlocked in future. To sum up, IBS implementation is able to maintain a consistent level of quality in construction projects by meeting the demands of contractors and clients. The three main benefits of IBS implementation that were identified through the course of this study are, increasing construction site productivity; reducing the time for in-situ concrete mixing activities; and reducing the overall construction duration. The common denominator among these three main benefits is the capability of IBS implementation to reduce the time frame for construction product completion. At the same time, IBS implementation is also be able to create an advance construction site working environment, as there would no longer be massive in-situ wet concrete works.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 72915.pdf]
Text
72915.pdf
Download (243kB)
Location & Physical Holdings
Digital Copy
Physical Location
Item Status
Indexing & Metrics