Barrier and successful factor of IBS system (case study in hostel construction, UiTM Pulau Pinang) / Siti Hafizan Hassan, Mohamad Zain Hashim and Janidah Eman

Hassan, Siti Hafizan and Hashim, Mohamad Zain and Eman, Janidah (2011) Barrier and successful factor of IBS system (case study in hostel construction, UiTM Pulau Pinang) / Siti Hafizan Hassan, Mohamad Zain Hashim and Janidah Eman. [Research Reports] (Unpublished)

Download

[thumbnail of 36177.PDF] Text
36177.PDF

Download (83kB)

Abstract

The Industrialized Building Systems (IBS) concept was adopted and applied during early sixties in Malaysia. There are need to identify reason of the unresponsive and uninterested local contractor to the IBS. This study identifies knowledge of IBS components among respondents. The methodology adopted for the study includes literature review, observation and questionnaire survey. These questionnaires were distributed to the respondents, which represent the construction industry players in Penang. This study identified the level of knowledge and understanding of IBS system among the construction player. The study had been concluded that the level of understanding and knowledge of respondents on industrial building systems are in medium level. The study also evaluated the opinion of respondents on advantages of IBS. There are five main advantages that most agreed by respondents. There are (l) Good Quality Control, (II) Faster Completion, (III) Easy Installation, (IV) Reduce Time and (V) Higher Quality. Those five advantages of IBS should be promoted by the authority in order to attract more IBS users.

Metadata

Item Type: Research Reports
Creators:
Creators
Email
Hassan, Siti Hafizan
UNSPECIFIED
Hashim, Mohamad Zain
UNSPECIFIED
Eman, Janidah
UNSPECIFIED
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > Systems of building construction. Industrialized building
T Technology > TH Building construction > Systems of building construction. Industrialized building > Malaysia
Divisions: Universiti Teknologi MARA, Pulau Pinang > Permatang Pauh Campus
Item ID: 36177
Uncontrolled Keywords: Industrialized Building Systems (IBS), Contractor, Questionnaires
URI: https://ir.uitm.edu.my/id/eprint/36177

Fulltext

Fulltext is available at:
  • Bilik Koleksi Akses Terhad PTAR | Kampus Permatang Pauh, Pulau Pinang
  • ID Number

    36177

    Indexing


    View in Google Scholar

    Edit Item
    Edit Item