Items where Subject is "Construction by phase of the work (Building trades)"

Group by: Creators | Item Type
Jump to: A | B | C | D | H | I | J | K | L | M | N | O | R | S | W | Y | Z
Number of items at this level: 104.

A

Variation order contribute to delay / Mohd Azizi Jamil A. Aziz. (2004) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

A study on selected cases in Malaysian construction contract / Md. Afandi Ab. Aziz. (1993) [Student Project] (Unpublished)

Communications in the construction projects / Zainal Rahman Abd Kadir. (2005) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Testing and commissioning procedure on installation of single tower crane / Noor Azira Abdul Aziz. (2014) Industrial Training. Universiti Teknologi Mara, Perak.

The degree of industrialized building systems implementation for projects in Malaysia / Nader Ardalan Abdul Ghani. (2008) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Pengurusan penyelenggaraan bangunan ITM Kelantan yang baru / Mohd. Aminudin Abdul Muluk. (1996) Degree thesis, thesis, Universiti Teknologi MARA.

Pelebaran jambatan (superstruktur) / Nor Aida Rafidah Abdul Razak. (2008) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Factors causing variation orders of mosque construction in Perak, Malaysia: a case study / Mohd Nazri Abdullah and Syed Haris Syed Mustapa. (2021) In: Virtual Go-Green: Conference and Publication (V-GoGreen 2020), 29-30 September 2020, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.

Construction of pad footing at Gong Pauh, Kemaman, Terengganu / Nurul Afina Abdullah Khari. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

BIPV system: the effectiveness of its usage for school buildings (comparison between BIPV system building with non-BIPV system building) / Ahmad Ezzani Abu Bakar. (2009) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Drain closure: method and safety aspects / Ahmad Syahid Adnan. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Prosedur-prosedur yang dijalankan oleh industri pembinaan mengikut MS ISO 9000:2000 / Ahmad Tarmimi Adnan. (2008) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Employer compliance in providing safety equipment at construction site / Nurazwani Ahmad. (2021) [Student Project]

Raising a Telecommunication Line Pole (TLP) / Muhammad Amin Ahmad Fauzi. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Handling bandar baru Setiawan P\Perdana site progress work, valuation on site and preparation of interim payment certificate / Shazieta Adlika Ahmad Zaki. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Building plan approval / Asriady Amran. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Construction of structure bridge in Kelantan Darul Naim / Muhammad Fahmi Arifin. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Augmented Reality (AR) for Promoting Public Participation in Urban Planning / Ahmad Johari Awang, M. Rafee Majid and Noradila Rusli. (2020) Built Environment Journal (BEJ), 17 (3). pp. 51-56. ISSN 1675-5022

The process of construction of 1 unit telecomunication tower type 3 legged / Athiqah Nurkhalisyah Azinuddin. (2021) [Student Project] (Unpublished)

The Industrialized Building System (IBS) as an alternative to the conventional construction method / Nurul Fatin Idayu Azman. (2021) [Student Project] (Unpublished)

Preliminary construction of reservoir water level control / Muhammad lkmal Ariff Azmee. (2012) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pengurusan dan perancangan kerja-kerja sementara / Az' Qusyairi Aznan. (2007) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

B

Construction of in-situ concrete beam / Muhamad Arif Baharim. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Concrete in construction site / Nur Asma’Ul-Husna Baharuddin. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Proses pembinaan semula bangunan / Nor Hanisah Bahrudin. (2009) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Redesign of kiosk spaces of Batu Gajah Wet Market towards new norms / Anis Syaziyah Basharudin. (2021) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Internal environmental policy based on green procurement for construction project / Zafikha Aida Bidin ... [et al.]. (2022) In: e-Proceedings V-GoGreen 2021: Virtual Go Green: Conference and Publication, 29-30 September 2021, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.

C

Exploring international construction projects: Views from Malaysian construction firms / Che Khairil Izam Che Ibrahim … [et al.]. (2009) ESTEEM Academic Journal, 5 (2). pp. 72-91. ISSN 1675-7939

Method construction of superstructure work / Muhammad Afnan Che Kadir. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

D

The construction for Ismail Petra Mosque extended building / Norhafizai Daud. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kajian terhadap kepentingan dan penggunaan kawasan lapang bagi kawasan perumahan awam / Syamsuri Daud. (1999) Degree thesis, thesis, Universiti Teknologi MARA.

H

Smart Building Structure / Hasrul Halimoon. (2021) In: UNSPECIFIED.

Proses kelulusan perakuan siap dan pematuhan (CCC) / Nor Ashikin Hamdan. (2010) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The labour attitude towards personal protective equipment in high rise construction / Nur Azlina Hanafi. (2013) [Student Project] (Unpublished)

Improvement of constructability guidelines for design phase in highway project / Siti Hafizan Hassan, Nadira Ahzahar and Hazrina Ahmad. (2009) [Research Reports] (Unpublished)

I

A review of adjudication in Malaysia, United Kingdom and Hong Kong construction industry / Azira Ibrahim, Zulhabri Ismail and Natasha Khalil. (2021) In: Virtual Go-Green: Conference and Publication (V-Go Green 2020), 29-30 September 2020, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.

Construction Industry Waste Control Practice in Kuching, Malaysia / Roseline Ikau... [et al.]. (2013) [Research Reports] (Unpublished)

A review of construction waste management and initiatives in Malaysia / Noor Rizallinda Ishak and Siti Akhtar Mahayuddin. (2021) In: Virtual Go-Green: Conference and Publication (V-GoGreen 2020), 29-30 September 2020, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.

A systematic review on best practices of construction waste management in construction project / Noor Rizallinda Ishak, Siti Akhtar Mahayuddin and Hayroman Ahmad. (2022) In: Virtual Go Green: Conference and Publication (v-GoGreen 2021) “Rethinking Built Environment: Towards a Sustainable Future” 29th-30th September 2021, 29 - 30 September 2021, Universiti Teknologi MARA, Cawangan Perak.

Ascertained performance deduction based on key performance indicators guided by JKR Wilayah Persekutuan Putrajaya / Siti Rohayu Ismail. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Safety management among contractor g7 in the construction of high rise building / Zulaikha Ismail. (2013) [Student Project] (Unpublished)

J

Potential of virtual reality implementation in new era construction / Noraidawati Jaffar ... [et al.]. (2022) In: Virtual Go-Green: Conference and Publication (v-Gogreen 2021) “Rethinking Built Environment: Towards a Sustainable Future” 29th-30th September 2021, 29-30 September 2021, Universiti Teknologi MARA, Perak.

K

Method construction of raft foundation / Mohammad Faqhrul Adzmi Khairuddin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

L

Barriers in implementing the IBS formwork systems in Malaysian construction industry / Ikhwan Lokman. (2016) [Student Project] (Unpublished)

Development of performance measurement tool (PMT) for operational and maintenance phase in Malaysian Public Private Partnership (PPP) projects / Nor Suzila Lop. (2019) PhD thesis, thesis, Universiti Teknologi MARA.

M

Installation of tiling works in a building case study at Almyra Residence Bandar Putra Mahkota Bangi, Selangor / Nor Syamimi Mat. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Methods of store construction / Muhammad Danish Imtiyaz Mat Radzi. (2021) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Development of underground structure case study: additional car parking space at Sogo complex / Nur Syaimira Mat Rosli. (2010) [Student Project] (Unpublished)

Bridge construction / Muhammad Zulfikaar Hariri Mazlan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Delay in school project in Lembah Klang / Hasniza Md. Kasa. (2005) Degree thesis, thesis, Universiti Teknologi MARA.

Defect repairing work on building during Defects Liability Period (DLP) (Rural Health Clinics KD2G types 1 and 2 for Ministry of Health Malaysia): FN Communication Sdn. Bhd./ Mior Ahmad Ridzuan Mior Alhadi. (2015) [Student Project]

Renovation procedure follow by house rules at the address condo, Bukit Jambul, Penang / Khairun Aina Mohamad. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

A study on the construction and demolistion waste management at site Klang Valley / Nurul Yasarah Mohamad. (2021) [Student Project] (Unpublished)

Tendering process for renovation work case study: Maybank Malayan Banking / Nurul Asyiah Mohamad Fua’at. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of substructure / Mohamad Hakim Mohamad Hatta. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Building approval procedure / Nurul Syafiqah Mohamad Rosidi. (2021) Industrial Training. Universiti Teknologi MARA UiTM,Perak.

Method of lock-up construction / Ahmad Zaidi Mohamed Anuar. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Procedure of renovation work and site monitoring at Indera Sakti dining hall / Mohd Asyraf Syahmi Mohammed Zaini. (2014) [Student Project]

The competency criteria of Building Information Modelling (BIM) managers among construction stakeholders in Malaysia / Nurmazlina Nabilah Mohd Azmi. (2022) Masters thesis, thesis, Universiti Teknologi MARA, Perak.

Construction of RC frame / Mohammad Huzairi Mohd Husni. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

A study on homeownership constraints among millenials in Bandaraya Melaka / Mirrah Husna Mohd Razlin. (2023) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Agreement to built a new structure telco project and permission to work / Mohamad Hazazi Hazran Mohd Rizal. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Cause and effect of construction delay (Bumiputera Company) / Muhammad Faiz Mohd Tarjuddin. (2015) [Student Project] (Unpublished)

Project monitoring for construct Penampang State Court / Nia Ellya Mohd Yusop. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Challenging of Industrialized Building System (IBS) in construction process during COVID-19 in Malaysia / Alyani Izzati Mohd Zainal. (2021) [Student Project]

The concept of inter - firm partnering practice between client and contractor in the construction projects / Faridah Muhamad Halil, Mohamad suffian Hasim and Siti Mazuen Kamaruddin. (2021) Advances in Business Research International Journal, 7 (1): 5. pp. 94-104. ISSN 2462-1838

Approval of work / Muhammad Ariff Imran Ruzlan. (2017) [Student Project] (Unpublished)

Post-inspection work after handing over process / Muhammad Azizul Haqim Ramli. (2017) [Student Project] (Unpublished)

Piling Work Police District Headquarters, Pasir Mas, Kelantan / Muhammad Azri Che Wil. (2017) [Student Project]

Proses permohonan kelulusan pelan / Ahmad Zakhwan Muhammad Mazmillah. (2008) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Inspection process and procedure in architecture work on the Residence Condominium, Bukit OUG, Kuala Lumpur / Marni Ainin Syahirah Muksain. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Process building plan approval for 3 storey bungalow with swimming pool / Fatini Izzati Mustafa. (2016) [Student Project]

Process of building plan approval: housing scheme / Noor Fatehah Mustaffa. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Factors contributing high-rise residential overhang (district of Kinta) / Nur Atikah Mustapha. (2023) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

N

The suitability of implementing 3D printing construction towards Malaysian construction industry / Harith Nasir and Fairiz Miza Yop Zain. (2023) In: UNSPECIFIED.

Estimating for renovation works (builders training & consulting) / Rifhan Wardah Nordin. (2015) Industrial Training. Universiti Teknologi MARA, Perak.

The construction of substructure for Cure & Care Clinic 1Malaysia at Bandar Seri Iskandar, Perak / Nursuhada Hazuany. (2015) [Student Project]

O

New towns in Peninsular Malaysia: planning and development / Dasimah Omar. (2004)

Revitalization of Old Township, Little India, Ipoh / Nurul Maizatul Akmar Omarzaki. (2021) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Proposed upgrading work of Pusat Kebudayaan dan Kesenian Negeri Sembilan at Jalan Sungai Ujong, Seremban for Jabatan Kebudayaan dan Kesenian Negeri Sembilan / Mohammad Firdaus Othman. (2012) [Student Project] (Unpublished)

Scaffold weigher with alert speaker / Muhammad Izzat Syahmi Othman. (2021) [Student Project]

R

The construction of pad footing / Muhammad Firdaus Razali. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Impact of procurement methods and project types on construction projects performance / Jimoh Richard, Oyewobi Luqman and Aliu Nurayn. (2015) Built Environment Journal (BEJ), 12 (2). pp. 50-60. ISSN 1675-5022

Renovation work process at Pusat Ilmu, Headquaters of Mardi Serdang, Selangor / Ainnur Amirah Roslan. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Door construction for commercial building / Nur Shafiqah Rosli. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Building plan approval and the implementation at MBKT / Muhammad Shaharuddin Ruslan. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)

S

The construction of steel framing system for Project Pembangunan Program Khas Perumahan Perwira Negeri Perak (PKPPNP) bagi Daerah Manjung, Negeri Perak / Nurinfarzana Syafiqah Salpian. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Intelligent building system / Mohd Azni Selamat, Mohd Farid Jamlus and Mohd Alias Abdullah. (2001) [Student Project] (Unpublished)

Construction of concrete dome structure / Mohd Zulfakarudin Shukri. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Penilaian tahap keberkesanan program publisiti dalam penyediaan draf rancangan tempatan daerah Temerloh, Maran, dan Jerantut Pahang / Norshahidayah Sulaiman dan Zurina Mohd Sadali. (2011) [Student Project] (Unpublished)

Water supply system repair works / Muhammad 'Ainul Furqon Syarif. (2022) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

W

Construction and maintenance of aquaria Underwater World Langkawi Malaysia / Wan Shahrul Amin Wan Ismail. (2008) [Student Project] (Unpublished)

Key elements of Building Information Modeling (BIM) for BIM-based projects / Wan Nur Syazwani Wan Mohammad ... [et al.]. (2022) In: e-Proceedings V-GoGreen 2021: Virtual Go Green: Conference and Publication, 29-30 September 2021, Universiti Teknologi MARA, Cawangan Perak Kampus Seri Iskandar.

Construction process of bungalow / Wan Nazirul Adlan Wan Zaini. (2015) [Student Project]

Implementation of Industrial Revolution 4.0 in construction projects / Nicole Wee Zhen Zhi ... [et al.]. (2021) In: Property Talk 2021: Industrial Revolution 4.0 in Malaysia Property, November.

Y

Developing a framework for the success of international development projects in the Maldives / Mohamed Yamin… [et.al]. (2017) International Journal Of Service Management And Sustainability (IJSMS), 2 (1). pp. 1-15. ISSN 2550-1569

Factors that influence the customers satisfaction towards mall attributes in Seremban / Nur Batrisyia Aliah Yusmar. (2023) Degree thesis, thesis, Universiti Teknologi MARA (UiTM).

Aluminium formwork system / Filzah Atikah Yusop. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Z

Kesan pengangkutan LRT (Transit Laju Ringan) terhadap mobiliti penduduk bandar (kes kajian: Kuala Lumpur) / Maimoon Zainal. (1998) Degree thesis, thesis, Universiti Teknologi MARA.

Building works and appraisals / Muhamad Azham Zakaria. (2017) [Student Project] (Unpublished)

The public's level of awareness towards local authority's standard procedure for building plan approval and illegal building in Selangor/ Zairul Azri Zuhairi. (2021) [Student Project]

Raft foundation / Nudzul Aireena Zulkefli. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The implication of maintenance work to space management in UiTM branch campuses / Nurul Ain Aisyah Zulkifli. (2021) [Student Project] (Unpublished)

Blockwork laying an aac block / Muhammad Zulhaziq Zulkurnain. (2022) Industrial Training. Universiti Teknologi MARA UiTM,Perak. (Unpublished)

This list was generated on Tue Nov 12 19:49:46 2024 UTC.