Items where Division is "Faculty of Architecture, Planning and Surveying" and Year is 2015

Group by: Creators | Item Type | No Grouping
Number of items: 95.

Construction of staircase/ Asma Abdul Aziz. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of reinforced concrete and Gabion retaining wall for a proposed of upgrading Kajang Silk Highway from UNITEN Interchange to UPM Interchange / Muhammad Aimi Adzmi. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Caisson construction / Amirul Syafiq Zainal Abidin. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The important factor of construction site management: Case study of doubles storey bungalow project Darulaman Lakehome Phase 2 / Nadzirah Nasir. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

High Density Polyethylene (HDPE) / Siti Aminah Misman. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Ancillary works for proposal to build and complete a two-storey bungalow on Lot 315549, Mukim Hulu Kinta, 31400 Ipoh, Perak / Norasyikin Mahamad Ali. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Inspection defect / Muhammad Afif Aidid. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of roof main trusses / Ruzaini Abdul Rahman. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Aluminium formwork system / Filzah Atikah Yusop. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The steel reinforcement concrete piling works for 2 ½ storey bungalow at Simpang Kuala, Alor Setar Kedah / Muhamad Hilmi Azri Ismail. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Progress claim / Amalina Aziema Ahmad Azam. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Contract administration / Diyanah Abdul Gani. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method statement of strip foundation and detail of the design / Amir Rusydi Zolkfle. (2015) [Student Project] (Submitted)

Menara Umno, Pulau Pinang / Mohd Khaizuran Aqil Naharuddin ... [et al.]. (2015) [Student Project]

British Telecom Tower Bangsar South City / Mohd Hafizul Esa ... [et al.]. (2015) [Student Project]

Lembaga Tabung Haji Ipoh Perak Darul Ridzuan / Nik Muhammad Fazrul Hassan ... [et al.]. (2015) [Student Project]

Palace of Justice (POJ) Putrajaya / Amy Ezrina Che Man ... [et al.]. (2015) [Student Project]

Ixora Hotel Seberang Prai, Pulau Pinang / Izzat Fadzrul Nazreen Anas ... [et al.]. (2015) [Student Project]

Jabatan Kerja Raya Ipoh, Perak Darul Ridzuan / Muhammad Zairul Bardan ... [et al.]. (2015) [Student Project]

Kementerian Pendidikan Malaysia Wilayah Persekutuan Malaysia / Mohd Faizal Yahya ... [et al.]. (2015) [Student Project]

Wisma Naza Building Sungai Besi Kuala Lumpur / Muhammad Zulhilmi Mohd Yusof ... [et al.]. (2015) [Student Project] (Unpublished)

Bangunan UMNO Ipoh Perak / Muhammad Zahir Ismail ... [et al.]. (2015) [Student Project]

Majlis Agama Islam Wilayah Persekutuan Menara Daruzzakah / Siti Nur Syafhiqah Mohd Razali ... [et al.]. (2015) [Student Project]

Tierra Crest Petaling Jaya Selangor Darul Ehsan / Ahmad Rashdan Mohd Rizan ... [et al.]. (2015) [Student Project] (Unpublished)

The construction of staircase at Genting Mall, Genting Highland / Ahmad Kamal Ezany Azizan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

OKU toilet construction / Muhamad Zahran Ahmad Daud. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Case study: Menara Kementerian Belia dan Sukan Putrajaya / Muhammad Haziq Pauzi ...[et al.]. (2015) [Student Project] (Unpublished)

Arch / Darren Tan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Steel circular column formwork system / Muhammad Nasaruddin Mat Zaid. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of RC tower for elevated water tank / Nadiatul Nasuha M. Mazhan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Quality assessment system in construction (QLASSIC) at PB Sentral and KP Perdana sites at Kuala Terengganu / Fatin Nabila Othman. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Bridge construction / Muhammad Zulfikaar Hariri Mazlan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Structural work of 8 storeys car park podium (Post Tension Method) / Faizatul Azlin Gani. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The installation of roof trusses / Muhammad Akmal Che Wan. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Roof construction / Shahrizan Osman. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Road construction / Rifky Farhan Ruazlizam. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Immigration building / Mohamad Aziz Izzuddin Baharom... [et al.]. (2015) [Student Project]

Method construction of swimming pool slab / Nurul Hayati Mohamad. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Causes of defect on wharf residence and methods of rectification / Nur Ain Jasmine Zafri. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Building structure for double storey terrace house / Mohamad Razien Faiz Abdul Halim. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Project handover: On proposed design, construction, completion, commissioning of Mahallah LTAT at the International Islamic University Malaysia, Gombak, Selangor Darul Ehsan / Mohamad Hairul Asri Jamaludin. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of double aluminium louvers with glass naco louvers / Mohamad Arif Mohd Nasir. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of staircase / Asma' Abdul Aziz. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction method of scaffolding design / Nurul Syuhadah Atikah Shamsuddin. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Concrete test / Nur Syafiqah Mardhiyah Mohammed Daud. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Endbearing pile: spun pile / Abdullah Zamzami Azaiz. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

UCO solid wall system / Muhammad Azim Anuar. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Lightweight steel roof trusses / Khalifah Hafizi Mohd Jamil. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

User satisfaction on fire safety requirement at heritage school building in Ipoh, Perak / Noraini Zakaria. (2015) [Student Project]

Design process case study: Single storey semi detach, Damansara, Selangor Darul Ehsan / Siti Natasa Mohamed Din. (2015) [Student Project]

Road construction projects from Kg Banir to Route 1, Batang Padang District, Perak / Mohamad Nasaruddin Mohd Nasir. (2015) [Student Project]

Application of formwork systems for lot 1881 & 1882 at Mont Kiara / Benedict Sandin Joseph Garan. (2015) [Student Project]

Construction of sanitation and refuse disposal system for Sekolah Rendah Agama (SRA) / Luqman Nul Hakim Ab Razak. (2015) [Student Project]

Supervision of fit - out work / Nadiatul Aisha Azmi. (2015) [Student Project]

Designing and construction of access road to Ladang Besout Jaya, Mukim Sungkai Daerah Batang Padang, Perak Darul Ridzuan, trough Sim Darby Plantation Sdn.Bhd / Nur Sahida Abdul Rahman. (2015) [Student Project]

Tendering process and taking off works / Abdul Halim Kamaruzaman. (2015) [Student Project]

An investigation study on the implementation of material wastage management in construction site of residential housing and highrise building / Muhammad Khidir Abd Rahman. (2015) [Student Project] (Unpublished)

A study on safety management implementation by G7 contractor in Kelantan / Muhammad Shukri Makhatar. (2015) [Student Project] (Unpublished)

Implementation fire safety at Sekolah Menengah Agama Rakyat in Kelantan / Tengku Nor Maziah Raja Soh @ Raja Azmi. (2015) [Student Project]

An analysis of non compliance report based on quality assessment system in construction, case study: Perak Darul Ridzuan / Nur Anis Nawi. (2015) [Student Project] (Unpublished)

Process of submitting tender / Shafiq Taqiuddin Tajuddin. (2015) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)

A study on factors of flat roof defects and the effectiveness maintenance strategies in perspective of public work department / Tengku Hasmaliza Tengku Hussin. (2015) [Student Project] (Unpublished)

A study on a faulty design defects in newly completed public hospital buildings in Kelantan / Nor Syamimi Mohd Shafuldin. (2015) [Student Project]

The effectiveness of barrier wall for residential along highway in Malaysia / Siti Nur Syamimi Ab Karim. (2015) [Student Project] (Unpublished)

The challenges of Build Then Sell (BTS) concept in Malaysian housing development: The perspective of housing developers / Wan Lutfaniah Wan Mohamad. (2015) [Student Project] (Unpublished)

An effective approach for managing building defect during the Defect Liability Period (DLP) for residential building in Kelantan / Muhammad Hanif Zulhilmi Che Md Jusoh @ Ariffin. (2015) [Student Project] (Unpublished)

A study on parking problem at Raja Permaisuri Bainun Hospital, Ipoh / Mohd Faizal Hassan. (2015) [Student Project] (Unpublished)

A study on academic space condition at UiTM Perak (Case study: UiTM Seri Iskandar, UiTM Tapah, UiTM Teluk Intan) / Suhaimi Musani @ Mohd Mustakim. (2015) [Student Project] (Unpublished)

A study of conservation maintenance for heritage building in Ipoh Perak / Mohamad Rahizul Faiez Mat Rahim. (2015) [Student Project] (Unpublished)

The study of end user satisfaction at PFI building / Mohd Hafiz Mohamad. (2015) [Student Project]

Construction of grand staircase, Masjid Jamek / Nor Azrien Maaras. (2015) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Column and beam construction projects at Alor Lintang, Mukim Kampung Raja, Daerah Besut, Terengganu Darul Iman / Arif Ismail. (2015) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Piling work: purchase and service procedure / Mohamad Firdaus Ab. Jalil. (2015) Industrial Training. Universiti Teknologi MARA, Perak.

Tower B, Menara Bata PJ Trade Centre Damansara / Muhammad Syakir Abdullah ... [et al.]. (2015) [Student Project]

Perbadanan Nasional Berhad Tower 7 Avenue 7 Bangsar South Kuala Lumpur / Mohd Alif Che Azmi ... [et al.]. (2015) [Student Project]

Case study: Wisma Perbadanan Kemajuan Negeri Kedah Kedah Darul Aman / Mohammad Adam Asmadi ...[et al.]. (2015) [Student Project]

Bangunan Sultan Idris Shah (JAIS) / Mohd Ajwad Zuhair Elah ... [et al.]. (2015) [Student Project]

Menara PjH, Putrajaya / Aizat Ilman On ... [et al.]. (2015) [Student Project]

A study on the readiness of building owner in enhancing building performance by embracing green building concept / Wan Nur Farahin Wan Ismail. (2015) [Student Project] (Unpublished)

To study an application of contract framework for outsourcing of facility management in UiTM Branch: Following an implementation stage / Khirul Syazwani Zulkifli. (2015) [Student Project]

A study on leadership skills of project manager for a successful construction project / Mohamad Redhuan Mohamed. (2015) [Student Project]

A study of facade deterioration at the old shop houses in Ipoh, Perak / Muhamad Aizat Omar. (2015) [Student Project] (Unpublished)

Substructure work for project of single storey terraced houses at Mukim Rompin, Daerah Rompin, Pahang / Ernie Nurlela Mohamed. (2015) Industrial Training. Universiti Teknologi MARA, Perak.

Request for inspection: case study at female dorm 2 / Amir Izzuddin Arifin. (2015) Industrial Training. Universiti Teknologi MARA, Perak.

Estimating for renovation works (builders training & consulting) / Rifhan Wardah Nordin. (2015) Industrial Training. Universiti Teknologi MARA, Perak.

Safety procedure at construction site rumah keluarga blok A32 di Pangkalan TLDM Lumut, Perak Darul Ridzuan / Mohamad Zaidi Zamhuri. (2015) Industrial Training. UNSPECIFIED. (Unpublished)

Industrialized Building System (IBS) for concrete (Case study at Clinic 1Malaysia Cure & Care Nationnal Anti-Drug Agency) / Muhammad Haziq Pauzi. (2015) [Student Project]

The importance of Personal Protective Equipment (PPE) on the construction site / Mohamad Aziz Izzuddin Baharom. (2015) [Student Project]

Sri Tinggi Sdn Bhd (Pakej D49- Pembinaan rangkaian paip pembentungan di Kajang 1 dan Kajang 3, Kajang, Selangor) & MMC-Sumitomo Consortium (cadangan pembinaan Langat Centralized Sewage Treatment Plant dan penyambungan rangkaian paip pembentungan di kawasan tadahan Lembangan Sungai Langat secara reka dan bina) / Noor Syazwanish Ahmad Zamzamir. (2015) Industrial Training. Universiti Teknologi MARA, Perak.

Automatic waste collection system (case study at Menara Felda) / Nursaara Mohd Razali. (2015) [Student Project]

Defect repairing work on building during Defects Liability Period (DLP) (Rural Health Clinics KD2G types 1 and 2 for Ministry of Health Malaysia): FN Communication Sdn. Bhd./ Mior Ahmad Ridzuan Mior Alhadi. (2015) [Student Project]

Maintenance of road works at (ft 362) Jalan Labu-Nilai, District of Seremban, Negeri Sembilan / Mohd Fadhli Nordin. (2015) [Student Project]

Maintenance of sewerage plant / Muhamad Syukur Azizi. (2015) [Student Project]

Condition survey at Hospital Sultan Haji Ahmad Shah, Temerloh / Nur Emelia Mohamad Ripin. (2015) Industrial Training. Universiti Teknologi MARA, Perak.

Fees collection (joint management body) / Noor Shida Shahib. (2015) [Student Project]

This list was generated on Fri Dec 27 07:04:53 2024 UTC.