Lembaga Tabung Haji Ipoh Perak Darul Ridzuan / Nik Muhammad Fazrul Hassan ... [et al.]

Hassan, Nik Muhammad Fazrul and Atan, Aizal Amri and Mohd Jamil, Fakhri Arif and Henry Bok, Debbie Sophia and Mjstafa, Fatini Izzati (2015) Lembaga Tabung Haji Ipoh Perak Darul Ridzuan / Nik Muhammad Fazrul Hassan ... [et al.]. [Student Project]
Abstract

Tabung Haji Ipoh building costs approximately RM23 million and was constructed in the year 1998 and finished in the year 2000. It has a total of 11 floor levels and 2 levels of basement. For the maintenance organization, Tabung Haji Ipoh has a technical department which consists of 5 staffs for in-house maintenance and 11 out-source contractors. The maintenance strategy for Tabung Haji Ipoh uses both Planned and Unplanned Maintenance. Other than that, the design of the building creates the aesthetic value and has its own image that reflects the scope of work undertaken by Tabung Haji. The building is in a very condition from all aspects such as safety and comfort for occupants. Tabung Haji Ipoh uses Preventive Maintenance, by referring to the Schedule Based Maintenance more than the Condition Based Maintenance. The our-source contractors are evaluate with Service Level Agreement (SLA). Besides that, Tabung Haji Ipoh building follows the given regulations and acts given by the Local Authority. Lastly, the total profit Tabung Haji Ipoh gained in the Year 2014 is RM406,987.82, where it is the average profit obtained that year. Overall, every maintenance system and strategy used in the building is still systematic.

Item Details
Edit Item
Edit Item
Downloads & Files
[thumbnail of 65090.pdf]
Text
65090.pdf
Download (744kB)
Location & Physical Holdings
Digital Copy
Physical Location
  • Bilik Koleksi Akses Terhad, PTAR Kampus Seri Iskandar, Perak
Item Status
On Shelf
Indexing & Metrics