Items where Division is "Faculty of Architecture, Planning and Surveying" and Year is 2018

Group by: Creators | Item Type | No Grouping
Jump to: A | B | D | E | I | J | K | M | N | O | R | S | W | Z
Number of items: 80.

A

Building condition assessment at the asset of PKNP / Hajar Asikin Ab Azis. (2018) [Student Project]

Roof construction (mild steel truss) of cafeteria and student affairs building at University Tun Hussein Onn Malaysia / Nur Hidayah Abd Aziz. (2018) [Student Project] (Submitted)

Installation methods of precast concrete beams & columns, Campus UniSZA Tembila, Besut / Zakaria Abd Hamid. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Defects works at KL Traders Square Gombak / Nor Najwa Abd Rahman. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Employers’ perception towards technical, vocational, educational and training (TVET) graduates / Abdul Amir Asraf Abdul Latif. (2018) [Student Project]

Pre-cast wall panel and steel frame construct by using Industrialised Building System (IBS) / Muhammad Abdul Jazmi Abdul Harrith. (2018) [Student Project] (Submitted)

The process for obtaining the Sewerage Works Application (SWA) approval and Sewerage Works Completion (SWC) approval / Mohd Mustafa Abdul Malik. (2018) [Student Project] (Submitted)

SIRIM Berhad Tower Shah Alam (Block 5: Centre of the Customer Service) Selangor Darul Ehsan / Nur Fazira Abdullah ... [et al.]. (2018) [Student Project] (Unpublished)

Dilapidation works for Mass Rapid Transit (MRT) at Jalan Tun Razak, Kuala Lumpur / Ahmad Hafiz Ahmad Latfi. (2018) [Student Project]

The construction of pad footing / Ahmad Danial Ahmad Tarmiji. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Nuisance control in renovation works of public hospital / Alyaa Anisah Azmi. (2018) [Student Project] (Unpublished)

Refurbishment works of shopping malls in Ipoh Perak / Ardina Umais Aminudin. (2018) [Student Project] (Unpublished)

Ministry of Tourism and Culture (MOTAC) / Muhamad Asyraf Asbar ... [et al.]. (2018) [Student Project] (Unpublished)

Superstructure for double storey semi – detached house / Azri Asri. (2018) [Student Project]

The construction of pad foundation / 'Ainaa 'Arifah Awang Omar. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Maintenance work at Kuala Lumpur International Airport / Nur Adlin Khairina Azewan. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Management and supervising of mechanical and electrical work at Phase Two The Havre Bukit Jalil / Azad Bukhari Aziz. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

B

The construction of ground floor slab for administration building, Sakj Lebai Mohd Yaakob, Ayer Baloi, Pontian, Johor / Siti Nur Azirah Bachok. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction method of soil improvement for new surau of Taman Anika, Batu 9, Port Dickson and other related works / Norhikmah Ieman Baharudin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of fire door and high security lockset at IPK Perlis project / Ahmad Syahidi Bokhri. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

D

Air-conditioning system at Gleneagles Kota Kinabalu / Nurul Shafa Nazihah Donny Asmy. (2018) [Student Project]

The production of on site precast concrete components for Industrialised Building System / Muhamad Asyraf Hakeem Dzulkafli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

E

Compliance of documents in draft for authorities approval / Enaz Amani Ezali. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

I

Gabion wall installation at Akademi Binaan Malaysia Wilayah Utara Sintok, Kedah / Anis Sofea Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of chain barrier post for P3 PETRONAS RAPID Project, Pengerang, Johor / Fatin Nurshazleen Ismail. (2018) [Student Project] (Submitted)

Roof trusses / Muhammad Safuan Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

RC column and beam construction / Noor Ismanajwa Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

J

Use of UAC concrete wall panels as Industrialised Building System in school project at Putrajaya / Syafiq Najmuddin Jamali. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The addition of admixture into concrete for the construction of roof slab / Nur Aini Jamaludin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Preparation of bill of quantities / Mohamad Aiman Hafiz Jamil. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Menara Seri Wilayah, Putrajaya / Mohd Faiz Juhari ... [et al.]. (2018) [Student Project]

K

Raft Foundation / Mohamad Nazreen Kamalullail. (2018) [Student Project] (Unpublished)

The construction of flat roof on 27-storey serviced apartments in Utropolis Batu Kawan, Penang / Kamarul Asyraf Kamarulzaman. (2018) Industrial Training. Universiti Teknologi MARA , Perak. (Submitted)

Restoration of roof and ceiling / Muhammad Faiz Ahda Khairol. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method construction of pad foundation / Nur Naimie Nadjwa Khairuddin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Wakaf construction process / Khairul Azhar Khalid. (2018) [Student Project]

M

Installation process of reinforced concrete square pile for toll Plaza Complex Damansara - Shah Alam / Noraisya Mis Suan. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The installation of column and beam for the construction of two storey hangar building / Nur Amira Syuhada Mohamad Salleh. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Static load test for spun pile piling / Mohamad Fazrul Arhan Mohamed Shaharudin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of standard pier / Nur Ainin Sofiya Mohamed Sufian. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The Adaptation of artificial intelligence in the malaysian construction industry / Mohammad Ashril Nadzim Abu Seman. (2018) Degree thesis, thesis, Universiti Teknologi Mara, Perak.

Leaking: the failure of design / Muhammad Abduh Almubarak Mohammad Shukor. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Upgrading work and improving facilities for Bengkel Usahawan Asas Tani (IAT), Jabatan Pertanian Negeri Selangor / Muhammad Muaz Mohd Asri. (2018) [Student Project] (Unpublished)

Earthwork and piling works / Nik Ahmad Bakri Mohd Iburadi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Fabrication and installation of steel truss / Mohammad Firdaus Mohd Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction of driveway / Izzat Farhan Mohd Razali. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

RC pile and pile cap construction / Nur Zulaikha Mohd Razip. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The installation of deep foundation (pile) using jack in machine / Mohd Asyraf Mohd Rozaidi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Community contributing factors towards sustainable mobility in residential neighbourhood / Nurain Mohd Talmizi. (2018) Masters thesis, thesis, Universiti Teknologi MARA, Perak.

Construction of car porch steel structure / Muhammad Danish Haykal Mohd Tarmizi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Procurement of roller shutter for Masjid Kota Kemuning, Seksyen 31 Shah Alam / Mohammad Zulfazdley Mohd Zulkifli Cheng. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Process of road maintenance works / Muhammad Alif Mokhtar. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Building maintenance project at Menara Tabung Haji, JB / Zhimiya Muhammad. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of waterproofing / Nurul Atikah Mursidi. (2018) [Student Project] (Unpublished)

N

Determining the satisfaction level on safety aspects from visitors perspective in I-City Theme Park / Nik Nurul Nisrina Nik Yusoff. (2018) Degree thesis, thesis, Universiti Teknologi Mara, Perak.

The construction of staircase using aluminium formwork at Impiana Sky Residensi, Bukit Jalil / Muhamad Imran Nor Halim. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method construction of pre-bore spun pile / Nor Sharfieza Nor Shamsul. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Passenger lift installation in Academic Complex at Sultan Azlan Shah Campus, Universiti Pendidikan Sultan Idris, Tanjong Malim, Perak Darul Ridzuan / Nur Anati Husna Norisham. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Parent's awareness towards escalators accidents involving children safety at shopping complex / Nur Rashidah Mohd Baharudin. (2018) [Student Project] (Unpublished)

Social and environment impact of land reclamation works at Seri Tanjung Pinang,Pulau Pinang / Nur Syaza Nadhirah Musa. (2018) [Student Project] (Unpublished)

O

Installation of starken Autoclaved Aerated Concrete (AAC) block wall / A'fif Rusydan Othman. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

R

Installation of precast column and beam (Industrialised Building System) / Nur Syakira Huda Radzi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of road at Desa Bangau Parit, 28000 Temerloh, Pahang Darul Makmur / Nur Hidayah Rahim. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction method of roof at Panji Kota Bharu Kelantan / Muhammad Naim Rosaly. (2018) [Student Project] (Submitted)

The construction of reinforced concrete slab at Riana South Condominium / Qamarul Azarin Rusli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

S

Substructure in Raub biomass power plant / Ahmad Fikri Saipuzzaman. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction of steel framing system for Project Pembangunan Program Khas Perumahan Perwira Negeri Perak (PKPPNP) bagi Daerah Manjung, Negeri Perak / Nurinfarzana Syafiqah Salpian. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Concrete frame structure of block 11 and block 12 of Academic Building for Faculty of Geoscience and Petroleum Engineering at University Teknologi Petronas Seri Iskandar Perak / Siti Fatin Najihah Samsul Bahari. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of floor and wall finishes for bathroom at Apple 99 Hotel / Siti Noor Aida Samsuri. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pre-cast concrete pile for deep foundation at Arena Square, Gerik / Raudhatul Jannah Sapani. (2018) [Student Project] (Submitted)

Failure in construction and its rectification at Riana South Condominium / Suaidah Shima Shahrin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Progress claims and site valuation / Syazatul Aliya Shamsudin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Building defect management: a case study at The Havre, Bukit Jalil / Muhamad Afiq Hakim Shamsul Anuar. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method installation of precast concrete pile using hydraulic injection (Jack-In Pile) system / Muhammad Amir Syahmi Sukhairul. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction for structure of single storey terrace house (Slabs, ground beam, roof beam and columns) / Muhammad lrfan Syarqawi Sulaiman. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

W

Preventive maintenance and adhoc corrective in Menara Tabung Haji Tun Razak / Shafiyah Wan Md Suhaimi. (2018) [Student Project] (Unpublished)

Z

A case study of building defects at Bank Negara Malaysia (lower ground 1) / Nur Syamira Zamri. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Invitation to tender / Izhar Hairee Zawawi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The installation method of u-beam and box girder / Nur Aqilah Zolkefli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Implemantation of industrialized building system / Ahmad Hafiz Hizri Zulkefli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

This list was generated on Sun Feb 16 13:34:12 2025 UTC.