Items where Division is "Faculty of Architecture, Planning and Surveying" and Year is 2018

Group by: Creators | Item Type | No Grouping
Jump to: A | B | D | E | F | H | I | J | K | M | N | O | R | S | T | W | Z
Number of items: 154.

A

Management and supervising of mechanical and electrical work at Phase Two The Havre Bukit Jalil / Azad Bukhari Aziz. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation methods of precast concrete beams & columns, Campus UniSZA Tembila, Besut / Zakaria Abd Hamid. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Maintenance work at Kuala Lumpur International Airport / Nur Adlin Khairina Azewan. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pre-cast wall panel and steel frame construct by using Industrialised Building System (IBS) / Muhammad Abdul Jazmi Abdul Harrith. (2018) [Student Project] (Submitted)

Nuisance control in renovation works of public hospital / Alyaa Anisah Azmi. (2018) [Student Project] (Unpublished)

Employers’ perception towards technical, vocational, educational and training (TVET) graduates / Abdul Amir Asraf Abdul Latif. (2018) [Student Project]

Refurbishment works of shopping malls in Ipoh Perak / Ardina Umais Aminudin. (2018) [Student Project] (Unpublished)

Dilapidation works for Mass Rapid Transit (MRT) at Jalan Tun Razak, Kuala Lumpur / Ahmad Hafiz Ahmad Latfi. (2018) [Student Project]

Superstructure for double storey semi – detached house / Azri Asri. (2018) [Student Project]

Building condition assessment at the asset of PKNP / Hajar Asikin Ab Azis. (2018) [Student Project]

Tender and quotation / Siti Nur Amirah Abdul Rahim. (2018) Industrial Training. Universiti Teknologi Mara, Perak.

Steel structure construction use in Merasam Hall, Limbang Sarawak / Awang Arif Afiqah Awang Azman. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar. (Unpublished)

The installation of bored pile foundation / Nur Ashikin Abdul Rahman. (2018) Industrial Training. Universiti Teknologi Mara, Perak, 2018.

Quotation process / Nurul Nabila Aqera Abu Samah. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Tendering process for kindergarten in the indigenous community in Perak / Nur Azmalia Ahmad Kamal. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Defect inspection during defect liability period : housing project Elvina Type at Bandar Sri Sendayan / Muhammad Shaffi Abdol Johar. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Building condition survey of Sri Cemerlang Bungalow House / Muhammad Hazim Abdul Ghafar. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Construction process of reinforced concrete beam / Muhammad Syazwan Azman. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Defect liability period, DLP (contractor responsibilities) / Abdillah Azizi Abdul Mu’en. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Installation of precast reinforcement concrete (R.C) piles for double-storey building / Noor A’kashah Amir Hamzah. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

The procedures of obtaining building licenses for high-rise building / Adlina Syazana Azman. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Foundation works for construction of Heal TH Clinic (type-7) / Ahmad Shafiq Shahmi Ahmad Sabri. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Defect management during defect liability period (for roadwork) / Muhammad Zulkifli Abd Rahim. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Raft foundation process for school construction in Pasir Mas, Kelantan / Muhammad El-Husairi Abdul Roni. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Building condition assessment for TLDM Lumut / Muhammad Amirul Mustaqim Abu Bakar. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Defect liability period, DLP (Home buyer responsibilities) / Siti Nur Fadiah Abdul Aziz. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Handling bandar baru Setiawan P\Perdana site progress work, valuation on site and preparation of interim payment certificate / Shazieta Adlika Ahmad Zaki. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Process of renovation work for roof of existing building (school) / Nooraizat Ahmad. (2018) Industrial Training. Universiti Teknologi MARA, Perak, Seri Iskandar, Perak. (Unpublished)

SIRIM Berhad Tower Shah Alam (Block 5: Centre of the Customer Service) Selangor Darul Ehsan / Nur Fazira Abdullah ... [et al.]. (2018) [Student Project] (Unpublished)

Ministry of Tourism and Culture (MOTAC) / Muhamad Asyraf Asbar ... [et al.]. (2018) [Student Project] (Unpublished)

Crack on reinforcement concrete beam / Norsyasya Firzanah Azame. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

Building quality inspection for vacant possession / Syabil Arissa Azizi. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

Cube test and slump test / Nor Fathin Fakhira Abdul Aziz. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)

The construction of pad foundation / 'Ainaa 'Arifah Awang Omar. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction of pad footing / Ahmad Danial Ahmad Tarmiji. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Defects works at KL Traders Square Gombak / Nor Najwa Abd Rahman. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Roof construction (mild steel truss) of cafeteria and student affairs building at University Tun Hussein Onn Malaysia / Nur Hidayah Abd Aziz. (2018) [Student Project] (Submitted)

The process for obtaining the Sewerage Works Application (SWA) approval and Sewerage Works Completion (SWC) approval / Mohd Mustafa Abdul Malik. (2018) [Student Project] (Submitted)

B

Construction method of soil improvement for new surau of Taman Anika, Batu 9, Port Dickson and other related works / Norhikmah Ieman Baharudin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of fire door and high security lockset at IPK Perlis project / Ahmad Syahidi Bokhri. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Comparison of wall construction between interlocking brick system and conventional system / Badrulmunir Berhan. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

The construction of ground floor slab for administration building, Sakj Lebai Mohd Yaakob, Ayer Baloi, Pontian, Johor / Siti Nur Azirah Bachok. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

D

Air-conditioning system at Gleneagles Kota Kinabalu / Nurul Shafa Nazihah Donny Asmy. (2018) [Student Project]

The production of on site precast concrete components for Industrialised Building System / Muhamad Asyraf Hakeem Dzulkafli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

E

Compliance of documents in draft for authorities approval / Enaz Amani Ezali. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

F

Proposed to construct rehabilitation building at Klinik Kesihatan (KK3) Tunjang, 06000 Jitra, Kedah Darul Aman / Nur Fazilah Fadzil. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

H

Repairing work during defect liability period case study at TPI Jalan Halimah, Tampoi, byJohor / Mohamad Hafiq Danial Hamdan. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Road pavement maintenance / Afiq Nazran Husairi. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

I

The installation of waterproofing system / Elina Ilias. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Gabion wall installation at Akademi Binaan Malaysia Wilayah Utara Sintok, Kedah / Anis Sofea Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

RC column and beam construction / Noor Ismanajwa Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Roof trusses / Muhammad Safuan Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of chain barrier post for P3 PETRONAS RAPID Project, Pengerang, Johor / Fatin Nurshazleen Ismail. (2018) [Student Project] (Submitted)

J

Types of waterproofing system / Syahida Jamil. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Menara Seri Wilayah, Putrajaya / Mohd Faiz Juhari ... [et al.]. (2018) [Student Project]

The addition of admixture into concrete for the construction of roof slab / Nur Aini Jamaludin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Use of UAC concrete wall panels as Industrialised Building System in school project at Putrajaya / Syafiq Najmuddin Jamali. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Preparation of bill of quantities / Mohamad Aiman Hafiz Jamil. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

K

Method construction of pad foundation / Nur Naimie Nadjwa Khairuddin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Restoration of roof and ceiling / Muhammad Faiz Ahda Khairol. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction of flat roof on 27-storey serviced apartments in Utropolis Batu Kawan, Penang / Kamarul Asyraf Kamarulzaman. (2018) Industrial Training. Universiti Teknologi MARA , Perak. (Submitted)

Wakaf construction process / Khairul Azhar Khalid. (2018) [Student Project]

Raft Foundation / Mohamad Nazreen Kamalullail. (2018) [Student Project] (Unpublished)

Concrete structure for slab construction / Abdul Jalil Kasim. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Refurbisment of shopping mall / Noor Liana Husna Kasim. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

The installation of water reticulation pipe system in Universiti Sultan Zainal Abidin, Kuala Terengganu / Nur Liyana Kamarudin. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Type of bonding in brick wall construction in rugby grand stand Ipoh,Perak / Muhammad Najib Khairul Anuar. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Construction supervisor's scope of work during the building construction and construction process / Muhammad Fithri Khamaruzzaman. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Installation of chiller at Impiana Hotel Ipoh / Muhammad Roziqin Khalid. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Method statement of installation precast concrete column and beam at Mukim Seriab, Perlis / Nur Fitrah Khalid. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

M

The installation of deep foundation (pile) using jack in machine / Mohd Asyraf Mohd Rozaidi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Fabrication and installation of steel truss / Mohammad Firdaus Mohd Ismail. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Static load test for spun pile piling / Mohamad Fazrul Arhan Mohamed Shaharudin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The installation of column and beam for the construction of two storey hangar building / Nur Amira Syuhada Mohamad Salleh. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction of driveway / Izzat Farhan Mohd Razali. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of standard pier / Nur Ainin Sofiya Mohamed Sufian. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Leaking: the failure of design / Muhammad Abduh Almubarak Mohammad Shukor. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The Adaptation of artificial intelligence in the malaysian construction industry / Mohammad Ashril Nadzim Abu Seman. (2018) Degree thesis, thesis, Universiti Teknologi Mara, Perak.

Upgrading work and improving facilities for Bengkel Usahawan Asas Tani (IAT), Jabatan Pertanian Negeri Selangor / Muhammad Muaz Mohd Asri. (2018) [Student Project] (Unpublished)

Installation of waterproofing / Nurul Atikah Mursidi. (2018) [Student Project] (Unpublished)

Construction of lean-to-roof at walkway / Muhammad Raihan Mohd Razlan. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar. (Unpublished)

Vacant possession (VP) / Muhammad Adib Hizami Mohd Shariffuddin. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Dilapidation inspection project at Damansara / Mohamad Zulkifli Mazlan. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Study on customer satisfaction with the performance of cleaning service / Nurul Fadzlin Najwa Mohd Makki. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Upgrading works / Nurul Hidayah Mohd Faizul Aris. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Types of building services at mall / Soraya Baizureen Mustafa. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Method statement for substructure / Muhammad Aniq Hilmie Mohd Nafi. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Quality standard for architectural works / Muhammad Hisyamuddin Mat Ariffin. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Road routine maintenance / Nur Irina Aminah Mohamed. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Foundation works for toilet at International Islamic University College, Selangor / Muhammad Aliff Fahmi Mohd Saufii. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Building maintenance lift and fire protection system at Menara MPSPK, Sungai Petani, Kedah / Ahmad Daniel Faiz Mahadzir. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Structure strengthening test / Aina Marina Muszaide. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Installation of brickwall for Spice Hotel on Jalan Tun Dr Awang , Mukim 12 Daerah Barat Daya Pulau Pinang / Mohamad Irwan Mohamad Azlan Shah. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Construction of RC frame / Mohammad Huzairi Mohd Husni. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Upgrading parking work at JKR's Workshop Gong Medang, Besut, Terengganu / Mohd Firdaus Mohd Ropi. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Dilapidation survey for infrastructure case study : Project cadangan perumahan bercampur berstrata di atas Lot 614 dan Lot 11, Pekan Templer, Daerah Gombak, Selangor Darul Ehsan untuk Tetuan Setia Eco Templer Son Bhd - Jalan Bukit Anaktakun / Nurul Iman Fakhira Mohd Nasir. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Process of home improvement management for poor houses under "Program Pembasmian Kemiskinan Bandar" (PPKB) in Majlis Bandaraya Melaka bersejarah (MBMB) area of administrations (phase 1) 2018 / Noor Marahaini Mohd Ali Janah. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Method construction of building foundation / Muhamad Fariz Mat Rodi. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

The work flow of building inspection at training nurse hostel: Block E / Nur Farhanah Ma'zin. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

Community contributing factors towards sustainable mobility in residential neighbourhood / Nurain Mohd Talmizi. (2018) Masters thesis, thesis, Universiti Teknologi MARA, Perak.

Procurement of roller shutter for Masjid Kota Kemuning, Seksyen 31 Shah Alam / Mohammad Zulfazdley Mohd Zulkifli Cheng. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction of car porch steel structure / Muhammad Danish Haykal Mohd Tarmizi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Process of road maintenance works / Muhammad Alif Mokhtar. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Building maintenance project at Menara Tabung Haji, JB / Zhimiya Muhammad. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Earthwork and piling works / Nik Ahmad Bakri Mohd Iburadi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

RC pile and pile cap construction / Nur Zulaikha Mohd Razip. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation process of reinforced concrete square pile for toll Plaza Complex Damansara - Shah Alam / Noraisya Mis Suan. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

N

Method construction of pre-bore spun pile / Nor Sharfieza Nor Shamsul. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Parent's awareness towards escalators accidents involving children safety at shopping complex / Nur Rashidah Mohd Baharudin. (2018) [Student Project] (Unpublished)

Social and environment impact of land reclamation works at Seri Tanjung Pinang,Pulau Pinang / Nur Syaza Nadhirah Musa. (2018) [Student Project] (Unpublished)

Determining the satisfaction level on safety aspects from visitors perspective in I-City Theme Park / Nik Nurul Nisrina Nik Yusoff. (2018) Degree thesis, thesis, Universiti Teknologi Mara, Perak.

Preparation of operation and maintenance manual / Nurul Batrisyia Noor Amali. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

The construction of staircase using aluminium formwork at Impiana Sky Residensi, Bukit Jalil / Muhamad Imran Nor Halim. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Passenger lift installation in Academic Complex at Sultan Azlan Shah Campus, Universiti Pendidikan Sultan Idris, Tanjong Malim, Perak Darul Ridzuan / Nur Anati Husna Norisham. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

O

Water-proofing / Fariha Ilyany Onn. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Installation of starken Autoclaved Aerated Concrete (AAC) block wall / A'fif Rusydan Othman. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

R

The construction of reinforced concrete slab at Riana South Condominium / Qamarul Azarin Rusli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Soil investigation & JKR/Mackintosh probe / Nurhazwaninajwa Ruslan. (2018) Industrial Training. Universiti Teknologi Mara, Perak, 2018. (Unpublished)

Replacing existing bridges at FT07/025/90 Kubang Pasu (Sungai Sanglang), Kedah / Fatin Nadira Ramu. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Study on cleaning work at Laguna Biru Apartment / Norfatihah Rusli. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

The work of repairing damages roof and trusses structure and other related work at Pusat Kokurikulum Pejabat Pendidikan Lama, Hulu Terengganu, Terengganu / Nur Ainun Izzati Ramli. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

Construction of road at Desa Bangau Parit, 28000 Temerloh, Pahang Darul Makmur / Nur Hidayah Rahim. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of precast column and beam (Industrialised Building System) / Nur Syakira Huda Radzi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction method of roof at Panji Kota Bharu Kelantan / Muhammad Naim Rosaly. (2018) [Student Project] (Submitted)

S

Failure in construction and its rectification at Riana South Condominium / Suaidah Shima Shahrin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Progress claims and site valuation / Syazatul Aliya Shamsudin. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pre-cast concrete pile for deep foundation at Arena Square, Gerik / Raudhatul Jannah Sapani. (2018) [Student Project] (Submitted)

Method installation of precast concrete pile using hydraulic injection (Jack-In Pile) system / Muhammad Amir Syahmi Sukhairul. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Substructure in Raub biomass power plant / Ahmad Fikri Saipuzzaman. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Building defect management: a case study at The Havre, Bukit Jalil / Muhamad Afiq Hakim Shamsul Anuar. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction for structure of single storey terrace house (Slabs, ground beam, roof beam and columns) / Muhammad lrfan Syarqawi Sulaiman. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction of steel framing system for Project Pembangunan Program Khas Perumahan Perwira Negeri Perak (PKPPNP) bagi Daerah Manjung, Negeri Perak / Nurinfarzana Syafiqah Salpian. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Conservation and refurbishment work of the warehouse building at Georgetown Penang / Irdani Farzzana Suzaidi. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

Unauthorized building Restaurant Go Bang Maju / Fatin Nabila Sabri. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Construction of Perumahan Rakyat Miskin Tegar (PPRT) House / Vanessa Simon. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Maintenance practice in Palm Seremban Hotel / Muhammad Farhan Syazwan Shafizal. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Internal audit of asset in National Metrology Institute of Malaysia / Syed Yazid Syed Ritthuddin. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

The implementation of Computerized Maintenance Management (CMMS) in Facility Management Services (FMS) company / Muhammad Taufiq Shaharuddin. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Building condition survey report at Lot 2, Jalan Hang Lekiu, Bandar Hilir Melaka / Syarifah Nur Adlin Syed Abdul Wahed. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Procedure of application and renewing the fire certificate / Muhammad Asyraaf Shohar. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Building Condition Assessment (BCA) at Rumah Keluarga Angkatan Tentera Blok A24 Pangkalan TLDM, Lumut, Perak Darul Ridzuan / Nur Fatinah Shaharim. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Reconstruction and improvement of poor schools using Industrialised Building System (IBS) methods / Hazreezan Sarip. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Concrete frame structure of block 11 and block 12 of Academic Building for Faculty of Geoscience and Petroleum Engineering at University Teknologi Petronas Seri Iskandar Perak / Siti Fatin Najihah Samsul Bahari. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of floor and wall finishes for bathroom at Apple 99 Hotel / Siti Noor Aida Samsuri. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

T

Process of building condition assessment / Muhammad Saifuddin Tukirin. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

W

Preventive maintenance and adhoc corrective in Menara Tabung Haji Tun Razak / Shafiyah Wan Md Suhaimi. (2018) [Student Project] (Unpublished)

Z

Invitation to tender / Izhar Hairee Zawawi. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The installation method of u-beam and box girder / Nur Aqilah Zolkefli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Implemantation of industrialized building system / Ahmad Hafiz Hizri Zulkefli. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Concreting works / Nur Atiqah Najihah Zakaria. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

Finishing work in construction at PPR Melana Indah / Muhammad Firaz Zainal Abidin. (2018) Industrial Training. Universiti Teknologi MARA, Perak.

Dilapidation survey on property and infrastructure at Manjoi, Perak / Muhammad Fakhruddin Zulkefli. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Rectification work before handing over / Muhamad Khairul Aziem Zulkifli. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

A case study of building defects at Bank Negara Malaysia (lower ground 1) / Nur Syamira Zamri. (2018) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

This list was generated on Sat Dec 21 23:36:56 2024 UTC.