Items where Division is "Faculty of Architecture, Planning and Surveying" and Year is 2003
A
A. Rahman, Noor Izzati (2003) Kerja-kerja, masalah-masalah dalam aktiviti cerucuk serta penggunaan tetulang / Noor Izzati A. Rahman. (2003) Industrial Training. Faculty of Architecture, Planning and Surveying. (Unpublished)
A.Aziz, Azrul Faiz
(2003)
Prosedur kerja penyenggaraan bagi kontraktor kelas f di KTMB / Azrul Faiz A.Aziz.
(2003)
[Student Project]
(Unpublished)
Ab Aziz, Noor Azizan
(2003)
Prosidur penyediaan dokumen meja tender dan pengurusan dokumen kontrak / Noor Azizan Ab Aziz.
(2003)
[Student Project]
(Unpublished)
Ab Karim, Haliza (2003) Prima board / Haliza Ab Karim. (2003) Industrial Training. UNSPECIFIED. (Unpublished)
Abd Khalib, Mohd Hafiz (2003) Kerja-kerja cerucuk untuk pembinaan bangunan pejabat dan makmal bioteknologi / Mohd Hafiz Abd Khalib. (2003) Industrial Training. Universiti Teknologi MARA (UiTM). (Unpublished)
Abdul Aziz, Mardiana
(2003)
Maintenance of historical timber palace / Mardiana Abdul Aziz.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Abdul Ghani, Siti Syahielah
(2003)
Kepentingan memahami undang-undang kecil bangunan dalam proses kelulusan pelan / Siti Syahielah Abdul Ghani.
(2003)
[Research Reports]
(Unpublished)
Abdul Latiff, Puteri Zanzarina
(2003)
Kajian kesan fizikal pembangunan perindustrian terhadap pembangunan kawasan sekitar di Zon Perindustrian Sg. Way, Petaling Jaya / Puteri Zanzarina Abdul Latiff.
(2003)
Diploma thesis, thesis, Universiti Teknologi MARA.
Abdullah, Norazlan
(2003)
Kajian pelepasan dan pengaliran asap kebakaran dari bangunan / Norazlan Abdullah.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Abu Hassan Saari, Ahmad Shaharuddin
(2003)
Piawaian dan syarat-syarat pembinaan bangunan dan binaan sementara di tapak binaan: kajian kes di Majlis Bandaraya Shah Alam / Ahmad Shaharuddin Abu Hassan Saari.
(2003)
[Research Reports]
(Unpublished)
Agus Salim, Husaini Aras and Ariffin, Muhamad Azizan and Mohd Roji, Aelinawati and Arrifin, Syafawati and Daud, Lesanizan
(2003)
Hotel De Palma Ampang / Husaini Aras Agus Salim.
(2003)
[Student Project]
(Unpublished)
Ahamad, Erlina
(2003)
Water treatment conventional treatment against Dissolved Air Flotation (DAF) / Erlina Ahamad.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Ahmad, Siti Rahayu
(2003)
Solid waste disposal system: incineration against landfill system / Siti Rahayu Ahmad.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Arshad, Khairul Nizam
(2003)
Study of trend facilities in the shopping complexes / Khairul Nizam Arshad.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Aziz, Amirul Azwan
(2003)
Kajian menaiktaraf kawasan rekreasi Hutan Lipur Sekayu, Hulu Terengganu, Terengganu / Amirul Azwan Aziz.
(2003)
[Research Reports]
(Unpublished)
B
Baharudin, Nooreen Hasikin
(2003)
Study on delay of JKR project (school) in the state of Kelantan / Nooreen Hasikin Baharudin.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Bakri, Rudy Irawan
(2003)
Effectiveness of operational on ice thermal energy storage system / Rudy Irawan Bakri.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
C
Che Mohd Yusoff, Mohd Aswady
(2003)
The leadership style of project manager in Malaysian (contractor firms) / Mohd Aswady Che Mohd Yusoff.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
F
Fadzil, Nur Suriya Farah
(2003)
Pengurusan tender dan projek pembinaan / Nur Suriya Farah Fadzil.
(2003)
[Student Project]
(Unpublished)
G
Gotisin Sudang, Elsie and Saadon, Fadhlin and Abduk Razak, Razwin and Zainuddin, Rosmawati
(2003)
Baklava Dessert House / Elsie Gotisin Sudang ... [et al.].
(2003)
[Entrepreneurship Project]
H
Hasnan, Noor Shazarina
(2003)
Problems in achieving maintenance service standard in four (4) star hotel / Noor Shazarina Hasnan.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Hassan, Mohd Budiman Putra
(2003)
Solid waste disposal comparison between open dumping and sanitary landfill (Kg. Pertok Machang, Kelantan (open dumping) and Puchong, Selangor (sanitary landfill) / Mohd Budiman Putra Hassan.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Hassim, Nurul Husna
(2003)
Kerja-kerja pemotongan lereng bukit / Nurul Husna Hassim.
(2003)
[Research Reports]
(Unpublished)
I
Ibrahim, Abd Razak
(2003)
Pengurusan dan senggaraan kajian kes; "Menara Perkeso" / Abd Razak Ibrahim.
(2003)
[Research Reports]
(Unpublished)
Ibrahim, Nor Ain
(2003)
A study of effectiveness safety plan implement at the Engineering Tower project in UiTM Shah Alam / Nor Ain Ibrahim.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Ishak, Atfan
(2003)
The effectiveness of air conditioning system at the UiTM main campus Shah Alam / Atfan Ishak.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Ismail, Muhammad Syakirin
(2003)
Risk on design and build for construction project faced by developer / Muhammad Syakirin Ismail.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
J
JAAFAR, RATHNA and OSMAN @ ADNAN, ADLINA and ABD. RAHMAN, NORAISYAH and CHAT, NURSUHANA and ZAWANI MOHD, NOR MOHD
(2003)
Property maintenance management of Kuala Lumpur City Hall / Rathna Jaafar ... [et al.].
(2003)
[Research Reports]
(Unpublished)
Jaafar@Mustapha, Norazianidawati
(2003)
Keberkesanan jenis sistem penghawa dingin dan tahap penyelenggaraan di Universiti Teknologi MARA Shah Alam, Selangor Darul Ehsan / Norazianidawati Jaafar@Mustapha.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Jamal, Khadijah
(2003)
Kajian keberkesanan tandas awam terhadap kepuasan pengguna (kes kajian: Jln. TAR, Hentian Jejantas Sg. Buloh dan Giant Shah Alam) / Khadijah Jamal.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Jani, Maznidatul Akmar Syihan
(2003)
Proses penyelenggaraan yang dijalankan oleh Majlis Bandaraya Johor Bahru (M.B.I.B) / Maznidatul Akmar Syihan Jani.
(2003)
[Student Project]
(Unpublished)
Jusoh, Mohd Abdul Fattah
(2003)
Proses pengurusan sijil layak menduduki bagi binaan projek / Mohd Abdul Fattah Jusoh.
(2003)
[Research Reports]
(Unpublished)
K
Kamaludin, Zaliha
(2003)
A study on the lateness factors in getting certificate of fitness (CFs) / Zaliha Kamaludin.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
M
M.Noor, Haswandi
(2003)
Pengurusan penyelenggaraan bangunan perpustakaan Institusi Pengajian Tinggi Awam (IPTA) / Haswandi M. Noor.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Mahat, Ahmad Irwan
(2003)
Kajian permasalahan pengurusan sisa pepejal di Bukit Kuda Klang / Ahmad Irwan Mahat.
(2003)
Diploma thesis, thesis, Universiti Teknologi MARA (UiTM).
Maslan, Masfarizan
(2003)
Ground improvement constructions with particular reference to stone column (case study : electrified double track project between Rawang and Ipoh) / Masfarizan Maslan.
(2003)
Degree thesis, thesis, Universiti Teknologi Mara (UiTM).
Mat Zai, Khairul Ariffin
(2003)
The life cycle cost for generator set / Khairul Ariffin Mat Zain.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Md Derus, Mohd Azlan Shah
(2003)
Tender perkhidmatan secara menyeluruh Bangunan Menara Perkeso 281, Jalan Ampang Kuala Lumpur / Mohd Azlan Shah Md Derus.
(2003)
[Research Reports]
(Unpublished)
Mohamed Razali, Nurhazalina
(2003)
Keberkesanan pengurusan penyelenggaraan sistem pembetungan di Shah Alam / Nurhazalina Mohamed Razali.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Mohammad, Mohd Nazeri (2003) Kerja-kerja cerucuk untuk pembinaan masjid baru Daerah Bentong / Mohd Nazeri Mohammad. (2003) Industrial Training. UNSPECIFIED. (Unpublished)
Mohd Salleh, Zuraidah
(2003)
Perlaksanaan program kitar semula di kawasan Majlis Bandaraya Shah Alam / Zuraidah Mohd Salleh.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Mohd Sulaiman, Norsuzaini
(2003)
A study on the implementation of safety and health policies at construction projects in relation to no. of accidents occur (contractors class ‘A’ and ‘C’) / Norsuzaini Mohd Sulaiman.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Muhamad Jamal, Ahmad Zaril
(2003)
Protection against corrosion of concrete reinforcement in marine environment - case study Westport, Klang / Ahmad Zaril Muhamad Jamal.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Muhammad, Ahmad Firdaus
(2003)
Komponen - komponen asas struktur bangunan bagi pembinaan Kolej Komuniti, Gerik, Perak / Ahmad Firdaus Muhammad.
(2003)
[Research Reports]
(Unpublished)
Muhd. Alias, Asrul Izham
(2003)
A study of chiller system and its cost effectiveness / Asrul Izham Muhd. Alias.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
O
Ogit, Mack Mayer
(2003)
Marphology of building leading to economical project / Mack Mayer Ogit.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Omar, Rosaidi
(2003)
Keberkesanan 'sewage aeration treatment system' sebagai alernatif kepada sistem kumbahan sedia ada / Rosaidi Omar.
(2003)
Degree thesis, thesis, Universiti Teknologi Mara (UiTM).
P
Pius Kuha, Romuald Kuha
(2003)
E-construction: in relation of implementation in local authorities / Romuald Kuha Pius Kuha.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
R
Ramli, Ahmad Nor Azlie
(2003)
The effectiveness of lift service in the main campus of UiTM Shah Alam / Ahmad Nor Azlie Ramli.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Razali, Mohamad Azmi
(2003)
Proposed methods and techniques for the conservation of Masjid Pernggit, Malacca / Mohamad Azmi Razali.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Razuan, Rohainiza
(2003)
Quality of construction for low cost flat in Klang Valley / Rohainiza Razuan.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
S
S. Yassin, Bahjat
(2003)
Kerja-kerja konkrit tetulang / Bahjat S. Yassin.
(2003)
[Research Reports]
(Unpublished)
Saat, Mohd Hisham
(2003)
A study on the effectiveness of the implementation of pest control work (termite) in building / Mohd Hisham Saat.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Saidun, Norazira
(2003)
The comparison of the effectiveness management of solid waste disposal between DBKL and Alam Flora Sdn. Bhd. / Norazira Saidun.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Selamat, Samsinah
(2003)
A study on precast concrete jointing systems for residential building in Klang Valley / Samsinah Selamat.
(2003)
Degree thesis, thesis, Universiti Teknologi Mara (UiTM).
Shah Fadzil, Mohd Izwan
(2003)
Study on the determination of nominated subcontractor / Mohd Izwan Shah Fadzil.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Sulaiman, Remi Azruddin
(2003)
Kesesuaian rekabentuk fizikal ruang pembelajaran terhadap mewujudkan persekitaran akademik (kes kajian: Kompleks Tahir Majid) / Remi Azruddin Sulaiman.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Syed Zin, Sharifah Nur Hafizah
(2003)
Keberkesanan kaedah teknologi pembinaan cepat / Sharifah Nur Hafizah Syed Zin.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
W
Wan Abdul Aziz, Wan Assad Qutubuldin
(2003)
Application of value management in construction industry during early stages / Wan Assad Qutubuldin Wan Abdul Aziz.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA (UiTM).
Wan Kadir, Wan Roslina
(2003)
The design and construction of timber truss / Wan Roslina Wan Kadir.
(2003)
[Research Reports]
(Unpublished)
Y
Yaacob, Suria
(2003)
Tender dan penilaian kerja projek sederhana / Suria Yaacob.
(2003)
[Research Reports]
(Unpublished)
Yaakub, Siti Rahayu
(2003)
Building construction on ex-mining land / Siti Rahayu Yaakub.
(2003)
Degree thesis, thesis, Universiti Teknologi Mara (UiTM).
Yusoff, Mohd Fadzil
(2003)
Keberkesanan penggunaan IT dalam membantu pengurusan kontrak-kontrak JKR (modul skala) / Mohd Fadzil Yusoff.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.
Z
Zainal, Siti Asiah
(2003)
Pemilihan bahan-bahan kemasan siling bangunan dan kesannya ke atas proses penyelenggaraan / Siti Asiah Zainal.
(2003)
Degree thesis, thesis, Universiti Teknologi MARA.