Notification of completion rectification / Ahmad Hassanuddin Md Ishak. (2019) [Student Project]
Menara Sunway / Ahmad Izzulhafiz Musalakmal ... [et al.]. (2019) [Student Project] (Unpublished)
TH Selbon Tower, Kuala Lumpur / Andrea Daling ... [et al.]. (2019) [Student Project] (Unpublished)
(PriCotton Brotherz Group) Printing and clothing business / Aniq Izdihar Khuzairi Roslam ... [et al.]. (2019) [Entrepreneurship Project] (Unpublished)
Wisma Sime Darby / Ahmad Dhiyauddin Ahmad Khair ... [et al.]. (2019) [Student Project] (Unpublished)
Belle Vie' Café (Café) / Athirah Abdul Aziz ... [et al.]. (2019) [Entrepreneurship Project] (Unpublished)
Moleque Cosmetics Sdn. Bhd / Amera Irrisya Fadzil Akhma ... [et al.]. (2019) [Entrepreneurship Project] (Unpublished)
The defects in housing project / Fatin Sabiha Abdullah. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Defect of floor tiling / Muhammad Akram Hafiy Ahmad Sabri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method and procedure of pile load test in PTD 182919, Bukit lndah, Iskandar Puteri, Johor / Nur Erisha Emalin Alwi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Progress payment claims / Nurul Ain Ayuhibullah. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Tiles installation at 3-storey bungalow / Nurfarhana Ahmad Fauzi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Total quality management for site supervision / Muhammad Aiman Abd Jaafar. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
2-storey terrace house structure construction / Rabiah Nashamirah Abd Rahman. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction defect issue involving method of rectified of double storey house / Amir Fakhrullah Ahmad Asmadi. (2019) [Student Project] (Submitted)
Brickwall installation / Aqilah Abdullah. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Honeycomb defects works / Muhammad Hafiz Abdullah. (2019) [Student Project] (Submitted)
Method construction of retaining wall for onsite storm water detention pond (OSD Pond) / Izzah Nur Imanina Ahmad Safawi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Plasterboard gypsum ceiling finishes at Tijani Ukay, Ampang / Muhammad Fakhrul Fu'ad Amir Ridza. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Post tensioned slab system / Nurul Hazirah Abdul Halim. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Tendering process for Cadangan Menaiktaraf Laman MBPJ Dan Kerja-Kerja Berkaitan Untuk Tetuan Majlis Bandaraya Petaling Jaya / Nur Ain Syahira Asri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Temporary work systems used for concrete frame construction / Nur Asmeehan Abu Bakar. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of RC pile for double storey semi-D houses / Nursyamimi Asyiqin Ahmad Nizam. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
External cold water supply system / Ahmad Razlan Alif Zuraimi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of raft foundation / Muhammad Adam Azrai Abdul Rahman. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Investigation of defects during liability period / Azfar Danial Isyraf Anuaridhuan. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Piling works: Jack in piles / Ariff Irwan Asmawi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Drainage work / Ahmad Faris Hakim Azrin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Storage tank erection / Muhammad Haikal Haziq Abdul Halim. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of pad footing for semi-detached houses project / Farah Husna Azmi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of pad footing at Gong Pauh, Kemaman, Terengganu / Nurul Afina Abdullah Khari. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
B
The enabling factors for green building development of housing projects in Malaysian / Nur Atifah Bahruddin. (2019) Masters thesis, thesis, Universiti Teknologi MARA, Perak.
Method installation of fencing works / Muhammad Shahrul Syazwan Bajuri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
C
The construction of substructures / Norshahira Che Soh. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
D
The construction for Ismail Petra Mosque extended building / Norhafizai Daud. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
E
Repair works on foor and wall / Muhammad Daniel Hakim Eddy Azuan. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
F
Concrete crossing slab as cover or closing for drainage at residential area / Saiful Hakim Fazal. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
H
Menara Tabung Haji Platinum, KLCC Kuala Lumpur / Hamzah Faris Hilmi Habri ... [et al.]. (2019) [Student Project] (Unpublished)
Superstructure work Industrial Building System (IBS) / Muhammad Izwan Izzuddin Hamidin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of skillion roof / Nurul Hanis Hadi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
I
Kids Bakery (Services) /Izzati Amani Mohd Mazlan ... [et al.]. (2019) [Entrepreneurship Project] (Unpublished)
Slope stabilization / Aina' Wahida Imran. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
J
Workplace safety inspection at project site of renovation and maintenance work / Ahmad Azrul Ikhwan Juhar Arifin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The importance of Quality Assurance and Quality Control (QA/QC) in construction / Muhammad Mursyid Jumali. (2019) [Student Project] (Submitted)
Steel structures / Nurul Zafirah Jamaluddin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
K
Upgrading of road safety infrastructure (divider) / Nur Liely Syafiqah Khairuddin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of billboard type gantry structures at KM 12.50 Elite Highway / Aina Awatif Kamarul Azizi. (2019) [Student Project] (Submitted)
Method construction of raft foundation / Mohammad Faqhrul Adzmi Khairuddin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Concrete mansory unit: characteristic, method, advantages and disadvantages installation / Nur Haziqah Izzati Khairilanuar. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction process of precast reinforced concrete of frame structure for Industrialised Building System (IBS) / Muhammad Aminuddin Kamarul Zaman. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
L
Internal cold water supply system of office building at chemical factory / Maizatul Hanisah Lani. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
M
The Effectiveness of plastic jersey barriers on work zone control during road construction / Muhammad Hakim Mohd Radin. (2019) [Student Project] (Unpublished)
Dewan Bandaraya Kuala Lumpur (DBKL 1) / Mohammad Hariz Mohd Yunus ... [et al.]. (2019) [Student Project] (Unpublished)
Botgo (FAS Sdn. Bhd) / Muhammad Aiman Kamarudin ... [et al.]. (2019) [Entrepreneurship Project] (Unpublished)
D'Nimbe Sdn Bhd : wireless weighing scales and braided cable / Muhammad Firdaus Md Khider ... [et al.]. (2019) [Entrepreneurship Project] (Unpublished)
Knowledge sharing model for facilities management of private finance initiative projects performance / Irwan Mohammad Ali. (2019) PhD thesis, thesis, Universiti Teknologi MARA, Perak.
Tree preservation order in local authorities administration / Mohammad Fitry Md Wadzir. (2019) Masters thesis, thesis, Universiti Teknologi MARA, Perak.
Street design towards safe city: snatch theft hotspot area / Anith Nabilah Mustafa. (2019) Masters thesis, thesis, Universiti Teknologi MARA, Perak.
Autoclaved Aerated Concrete (AAC) blocks for wall element at Pejabat Kesihatan Daerah Jeli, Kelantan / Alif Ikmal Mat Izman. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Piling works of reinforced concrete pile / 'Ayuni Nadhirah Mohamad Yamin. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Quality control of Sekolah Agama Kebangsaan Johor (SAKJ) project / Farah Aina Mohd Zam. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Superstructures work of housing / Mohamad Nurfakhrul Azizi Mohd Zalani. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of the precast U-drainage / Mohamad Farhan Mohd Ayob. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Defect list at semi-D housing project / Muhammad Izzat Farhan Mustapa. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Light weight concrete panel wall / Badrul Hisham Mohd Zamri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of pile cap / Nur Syahira Liyana Mohd Ghazali. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Defects in construction / Putri Saghirah Nur Mohamed Nasri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Renovation work for a house / Mohd Shafiq Helmi Mohamad Sharif. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Beam, slab and shear wall construction / Muhammad Abdillah Mohamad Nor. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of central air conditioning system / Muhammad Zaieful Danial Mohd Zaidi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Reinforced concrete wall using steel formwork / Muhamad Khairul Nizam Mahmood. (2019) Industrial Training. Universiti Teknologi MARA, Perak +. (Submitted)
Load bearing masonry wall construction / Nur Fakhira Mohd Allif Effendy. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction method of leachate water collection drain / Nur Najwa Natasya Muhamad Nasri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Retaining wall / Nur Fatin Azini Mohd Zulkifli. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Certification of completion and compliance of cadangan sebuah gudang 1 tingkat di Jalan Perigi Nenas 8/7 Taman Perindustrian, Pulau Indah, Pelabuhan Barat, Klang / Muhammad Aqmal Ziqri Mohd Najib. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of bored pile (substructure) for condominium Trinity Pentamont, Mont Kiara / Wan Nurelly Nazjiha Mohd Nor. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of asphalt road in flexible pavement / Nur Syahira Muhd Zailani. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of floor finishes / Nurul Izzah Mohd Nawawi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Ground beam construction process of Complex Islam Pasir Puteh, Kelantan / Siti Nur Atira Mohd Nasir. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of pad foundation / Muhammad Zulhadzhim Md Sharif. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Underground piping installation at the construction site / Nurul Sarah Mohamad Sinatra. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Process brickwork at the construction site (wall construction) / Yusrizal Aizat Mohd Yusoff. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
N
The application of liquid membrane waterproofing system for water tank work at kolej Pasir Salak / Nur Fatin Syamimi Mohd Afandi. (2019) [Student Project] (Unpublished)
Issuing certificate of completion and compliance for public building Surau Al-Muqarrabin, Kg. Baru Mambau Seremban / Nurin Nabilla Ramlan. (2019) [Student Project] (Unpublished)
Smartex Sdn Bhd / Nur Hanis Fitriah Mohd Hasni ... [et al.]. (2019) [Entrepreneurship Project] (Unpublished)
BTB Hardware Enterprise : Lorries Rental Service / Nurul Atikah Mahadzir ... [et al.]. (2019) [Entrepreneurship Project] (Unpublished)
Users’ satisfaction level towards the facilities provided at the Mass Rapid Transit (MRT) Station / Nurul Ashiqin Rosman. (2019) Degree thesis, thesis, Universiti Teknologi Mara, Perak.
Potential of Pangkor Island as a tourism destination in Perak State / Nor Shahira Ahamad Shah. (2019) [Student Project] (Unpublished)
The accident cost ratio for Malaysian railway projects towards sustainable and safe construction / Nik Nur Khairunnisa Nik Mohammed Ainul Azman. (2019) Masters thesis, thesis, Universiti Teknologi MARA, Perak.
The key challenges of Green Retrofitting Project (GRP) for existing office building in Malaysia / Siti Maryam Norhasandi. (2019) Masters thesis, thesis, Universiti Teknologi MARA, Perak.
Method of rectifying defects (flooring, wall crack and window leaking) / Nik Afif Haziq Nik Noor Ahmazukee. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction process of superstructures for a single storey house / Sarah Nadhirah Nize. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
O
Achieving optimum natural daylighting strategies in a design studio of UiTM Perak / Muhammad Anas Othman. (2019) Masters thesis, thesis, Universiti Teknologi MARA, Perak.
R
Construction of additional roof truss steel structure for covered carpark / Natrah Munirah Rosli. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Introduction to epoxy waterproofing method / Nur Yasmin Adibah Ronizam. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of drainage / Muhammad Azmil Rosli. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Road construction / Muhammad Izzaidy Zikry Roslan. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Post concrete work / Amir Hamzah Rashid Ridha. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Superstructure work of astaka / Muhammad Hafizi Rosiman. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
S
Identification of shoreline erosion along Tanjung Tokong Penang / Nurashikin Shamsuddin. (2019) Degree thesis, thesis, Universiti Teknologi MARA, Perlis.
Cotidal datasets estimation using spatial interpolation methods in Geographical Information System / Khadijah Sahdan. (2019) Masters thesis, thesis, Universiti Teknologi MARA, Perak.
Construction of residential housing using shear wall method / Nursyarnini Izma Shaari. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The uses of Technical Material Sheet (TMS) for the maintenance of a government office building in Putrajaya / Nurul Izzati Shamsul Bahri. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction method for reinforced concrete frame structure / Syed Ahmad Najmi Shahabudin Syed Nasiruddin. (2019) [Student Project] (Submitted)
Defect studies during defect liability period / Muhammad Aliff Imran Suardi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
A case study of spun pile / Fatimah Atifah Seyed Mohamed Mohamed Nazim. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
T
Perimeter wall and gate / Tuan Muhammad Afif Husaini Tuan Asmawi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
W
The equation model of transaction price for green building certificate on the condominium in Selangor / Wan Nur Ayuni Wan Ab Rashid. (2019) Masters thesis, thesis, Universiti Teknologi MARA, Perak.
Construction method of superstructure for terrace house / Wan Nurul Izzah Wan Ibrahim. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction method of pre-boring works and spun pile installation at PTD 182919, Bukit Indah, Johor Bahru / Wan Mohd Danial Wan Najmi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Roadwork construction / Muhammad Azwan Arash Wan Salman. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Y
Method construction of pile cap / Nurul Afiqah Natasha Yahaya. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Post contract work during defect liability period / Nursyahirah Yusri. (2019) Industrial Training. Universiti Teknologi MARA, UiTM Perak. (Submitted)
Z
The extension of time of Kajang 2 commuter station / Siti Aisyah Afifah Zulkifli. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Type of tiles and their application in building / Muhammad Zahid Zainol. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Maintenance in residential building / Nurul Nabila Husna Zulkifli. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction of pile cap for double storey house renovation / Khairul Azhar Zainul Rashid. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of finishes in a unit of high rise condominiums of the Henge, Kepong Kuala Lumpur / Muhammad Faiz Zakaria. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Substructure construction method / Muhammad Haziq Zainul Rashidi. (2019) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)