Abstract
Generally, report some practical training is to tell about all related to the construction, types , materials used in the construction of a ( structure stage) , the construction of the wall and foundation construction musolla . This report is available from day to day, and for the past 5 months I underwent practical training at Yayasan Pahang . This report began with a narration about the company background and depertment background. Based on the experience I have gained, the investment department has a part of the development of acting in all projects related to the foundation Pahang and its subsidiaries. Besides that, the use of technology brought in from USA such as aluminum and plastic formwork has helped to save the cost of building this musolla .Normally,it use for the bigger construction at a Malaysia. Besides that, also included a report on the problems that occur in the course of construction of the walls and the foundation, but the solution has helped solve. And in conclusion, some practical report tells everything related to the construction of walls and foundations as well as the use of technology that has been spent in the construction of the Mosulla, Tanjung Lumpur, Kuantan.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Abdul Halim, Fatin Nabiela 2011452874 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Yahya, Mohamad Ridzuan UNSPECIFIED |
Subjects: | N Fine Arts > NA Architecture > Walls T Technology > TA Engineering. Civil engineering > Structural engineering > Specific structural forms, analysis, and design > Walls T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Hydraulic filling T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Foundations T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Foundations > Piles and pile-driving |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Wall construction, Wall, Foundation |
Date: | 2014 |
URI: | https://ir.uitm.edu.my/id/eprint/48870 |