Items where Subject is "Hydraulic filling"

Group by: Creators | Item Type
Jump to: A | C | I | J | K | M | R | Z
Number of items at this level: 16.

A

Foundation and wall construction case study : Musolla at Tanjung Lumpur, Kuantan, Pahang / Fatin Nabiela Abdul Halim. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Implementation of piling work / Anis Shakirah Abdul Rahman. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Raft foundation process for school construction in Pasir Mas, Kelantan / Muhammad El-Husairi Abdul Roni. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Foundation works for construction of Heal TH Clinic (type-7) / Ahmad Shafiq Shahmi Ahmad Sabri. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Piling work at Seksyen 25 market project / Muhammad Norfitri Azhar. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

C

Piling works at Pasir Puteh Sentral ( PPS ) / Ahmad Rifaiā€™e Che Daud. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)

I

The concept of self-directed piling rig / Nur Syaza Ismail and Noor Azam Yahaya. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

J

Installation bored pile: Pembinaan Fakulti Perubatan dan Sains Kesihatan (fpsk), Universiti Sains Islam Malaysia (usim) di Nilai, Negeri Sembilan / Siti Nor Azuren Jamat. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

K

Raft Foundation / Mohamad Nazreen Kamalullail. (2018) [Student Project] (Unpublished)

M

The process of piling work with bore pile method / Muhamad Afiq Azfar Mat Zin. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

The innovation of pile driver : a review / Mohammad Asyraaf Aqil Mohamad. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

The work process of piles and pile caps / Mohamad Afif Mohamad Zaki. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Foundation works for toilet at International Islamic University College, Selangor / Muhammad Aliff Fahmi Mohd Saufii. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

R

Slope improvement using sheet pile / Muhamad Izzat Rosli. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Z

Nomograph modelling of hydraulic conductivity for landfill soil liner using boiler ash-based geopolymer / Atiqah Najwa Zainuddin. (2022) PhD thesis, thesis, Universiti Teknologi MARA (UiTM).

Construction of pile foundation for telecommunication tower / Muhammad Amzarfahmi Zubidi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

This list was generated on Thu Nov 21 19:59:34 2024 UTC.