Items where Subject is "Piles and pile-driving"

Group by: Creators | Item Type
Jump to: A | B | C | D | H | I | J | K | M | N | R | S | Z
Number of items at this level: 32.

A

Kerja-kerja cerucuk untuk pembinaan bangunan pejabat dan makmal bioteknologi / Mohd Hafiz Abd Khalib. (2003) Industrial Training. Universiti Teknologi MARA (UiTM). (Unpublished)

Foundation and wall construction case study : Musolla at Tanjung Lumpur, Kuantan, Pahang / Fatin Nabiela Abdul Halim. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Implementation of piling work / Anis Shakirah Abdul Rahman. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

The installation of bored pile foundation / Nur Ashikin Abdul Rahman. (2018) Industrial Training. Universiti Teknologi Mara, Perak, 2018.

Raft foundation process for school construction in Pasir Mas, Kelantan / Muhammad El-Husairi Abdul Roni. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Construction of pile foundation for telecommunication tower / Muhamad Shazwan Nahar Adam. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Foundation works for construction of Heal TH Clinic (type-7) / Ahmad Shafiq Shahmi Ahmad Sabri. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Installation of precast reinforcement concrete (R.C) piles for double-storey building / Noor A’kashah Amir Hamzah. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Piling work at Seksyen 25 market project / Muhammad Norfitri Azhar. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

B

The use of low heat concrete in pile caps construction / Muhammad Nazif Baharuddin. (2014) [Student Project] (Unpublished)

C

Piling works at Pasir Puteh Sentral ( PPS ) / Ahmad Rifai’e Che Daud. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)

D

An evaluation on the performance of the stabilized silty soil using lime and rice husk ash / Rahayu Daud. (2007) [Student Project] (Unpublished)

H

Back analysis for pile bearing capacity using Static Load Test result / Nurharnani Hassan. (2005) [Student Project] (Unpublished)

The process of piling work using drop hammer method / Muhamad Fahmi Hussin. (2015) [Student Project]

I

The study of pile capacity for buildings in UiTM Penang / Budi Iskandar Ibrahim. (2006) [Student Project] (Submitted)

The concept of self-directed piling rig / Nur Syaza Ismail and Noor Azam Yahaya. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

MMC-Gamuda KVMRT (PDP) Sdn Bhd / Nurul Fathiah Ismail. (2014) Industrial Training. UITM Cawangan Johor Kampus Pasir Gudang, UiTM Pasir Gudang. (Unpublished)

J

Installation bored pile: Pembinaan Fakulti Perubatan dan Sains Kesihatan (fpsk), Universiti Sains Islam Malaysia (usim) di Nilai, Negeri Sembilan / Siti Nor Azuren Jamat. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

K

Raft Foundation / Mohamad Nazreen Kamalullail. (2018) [Student Project] (Unpublished)

Pad Foundation / Muhamad Aiman Fahmi Kamaruzaman. (2017) [Student Project] (Unpublished)

M

The process of piling work with bore pile method / Muhamad Afiq Azfar Mat Zin. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

The innovation of pile driver : a review / Mohammad Asyraaf Aqil Mohamad. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

Comparative study on interpreting pile bearing capacity from CPT result / Nydia Mohamad Yatim. (2006) [Student Project] (Unpublished)

The work process of piles and pile caps / Mohamad Afif Mohamad Zaki. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Flexural behaviour of prestressed concrete pile / Azaha Mohammad. (1997) [Student Project] (Unpublished)

Foundation works for toilet at International Islamic University College, Selangor / Muhammad Aliff Fahmi Mohd Saufii. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Load settlement behaviour of bakau pile / Ahmad Fauzi Mohd Yusof. (1993) Advanced Diploma thesis, thesis, Universiti Teknologi MARA (UiTM).

N

Construction of piling works / Haziq Izzuddin Naziron. (2016) [Student Project] (Unpublished)

R

Slope improvement using sheet pile / Muhamad Izzat Rosli. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

S

Reliability of jack-in method in assessing pile Bearing capacity / Mozzi Solomon Sensing. (2006) [Student Project] (Unpublished)

Z

Piling work: multipurpose hall / Noorza Ameleana Zaidi. [Student Project] (Unpublished)

Construction of pile foundation for telecommunication tower / Muhammad Amzarfahmi Zubidi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

This list was generated on Thu Nov 21 19:03:13 2024 UTC.