Items where Subject is "Piles and pile-driving"

Group by: Creators | Item Type
Number of items at this level: 32.

Monograph

Abd Khalib, Mohd Hafiz (2003) Kerja-kerja cerucuk untuk pembinaan bangunan pejabat dan makmal bioteknologi / Mohd Hafiz Abd Khalib. (2003) Industrial Training. Universiti Teknologi MARA (UiTM). (Unpublished)

Abdul Halim, Fatin Nabiela (2014) Foundation and wall construction case study : Musolla at Tanjung Lumpur, Kuantan, Pahang / Fatin Nabiela Abdul Halim. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Abdul Rahman, Anis Shakirah (2016) Implementation of piling work / Anis Shakirah Abdul Rahman. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Abdul Rahman, Nur Ashikin (2018) The installation of bored pile foundation / Nur Ashikin Abdul Rahman. (2018) Industrial Training. Universiti Teknologi Mara, Perak, 2018.

Abdul Roni, Muhammad El-Husairi (2018) Raft foundation process for school construction in Pasir Mas, Kelantan / Muhammad El-Husairi Abdul Roni. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Adam, Muhamad Shazwan Nahar (2017) Construction of pile foundation for telecommunication tower / Muhamad Shazwan Nahar Adam. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Ahmad Sabri, Ahmad Shafiq Shahmi (2018) Foundation works for construction of Heal TH Clinic (type-7) / Ahmad Shafiq Shahmi Ahmad Sabri. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Amir Hamzah, Noor A’kashah (2018) Installation of precast reinforcement concrete (R.C) piles for double-storey building / Noor A’kashah Amir Hamzah. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Azhar, Muhammad Norfitri (2016) Piling work at Seksyen 25 market project / Muhammad Norfitri Azhar. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Che Daud, Ahmad Rifai’e (2014) Piling works at Pasir Puteh Sentral ( PPS ) / Ahmad Rifai’e Che Daud. (2014) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)

Ismail, Nurul Fathiah (2014) MMC-Gamuda KVMRT (PDP) Sdn Bhd / Nurul Fathiah Ismail. (2014) Industrial Training. UITM Cawangan Johor Kampus Pasir Gudang, UiTM Pasir Gudang. (Unpublished)

Jamat, Siti Nor Azuren (2017) Installation bored pile: Pembinaan Fakulti Perubatan dan Sains Kesihatan (fpsk), Universiti Sains Islam Malaysia (usim) di Nilai, Negeri Sembilan / Siti Nor Azuren Jamat. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Mat Zin, Muhamad Afiq Azfar (2014) The process of piling work with bore pile method / Muhamad Afiq Azfar Mat Zin. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.

Mohamad Zaki, Mohamad Afif (2016) The work process of piles and pile caps / Mohamad Afif Mohamad Zaki. (2016) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Mohd Saufii, Muhammad Aliff Fahmi (2018) Foundation works for toilet at International Islamic University College, Selangor / Muhammad Aliff Fahmi Mohd Saufii. (2018) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Rosli, Muhamad Izzat (2014) Slope improvement using sheet pile / Muhamad Izzat Rosli. (2014) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Zubidi, Muhammad Amzarfahmi (2017) Construction of pile foundation for telecommunication tower / Muhammad Amzarfahmi Zubidi. (2017) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Conference or Workshop Item

Ismail, Nur Syaza and Yahaya, Noor Azam (2019) The concept of self-directed piling rig / Nur Syaza Ismail and Noor Azam Yahaya. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

Mohamad, Mohammad Asyraaf Aqil (2019) The innovation of pile driver : a review / Mohammad Asyraaf Aqil Mohamad. (2019) In: 4th Undergraduate Seminar on Built Environment and Technology 2019, 12th June 2019, Universiti Teknologi Mara Perak Branch.

Thesis

Mohd Yusof, Ahmad Fauzi (1993) Load settlement behaviour of bakau pile / Ahmad Fauzi Mohd Yusof. (1993) Advanced Diploma thesis, thesis, Universiti Teknologi MARA (UiTM).

Student Project

Baharuddin, Muhammad Nazif (2014) The use of low heat concrete in pile caps construction / Muhammad Nazif Baharuddin. (2014) [Student Project] (Unpublished)

Daud, Rahayu (2007) An evaluation on the performance of the stabilized silty soil using lime and rice husk ash / Rahayu Daud. (2007) [Student Project] (Unpublished)

Hassan, Nurharnani (2005) Back analysis for pile bearing capacity using Static Load Test result / Nurharnani Hassan. (2005) [Student Project] (Unpublished)

Hussin, Muhamad Fahmi (2015) The process of piling work using drop hammer method / Muhamad Fahmi Hussin. (2015) [Student Project]

Ibrahim, Budi iskandar (2006) The study of pile capacity for buildings in UiTM Penang / Budi Iskandar Ibrahim. (2006) [Student Project] (Submitted)

Kamalullail, Mohamad Nazreen (2018) Raft Foundation / Mohamad Nazreen Kamalullail. (2018) [Student Project] (Unpublished)

Kamaruzaman, Muhamad Aiman Fahmi (2017) Pad Foundation / Muhamad Aiman Fahmi Kamaruzaman. (2017) [Student Project] (Unpublished)

Mohamad Yatim, Nydia (2006) Comparative study on interpreting pile bearing capacity from CPT result / Nydia Mohamad Yatim. (2006) [Student Project] (Unpublished)

Mohammad, Azaha (1997) Flexural behaviour of prestressed concrete pile / Azaha Mohammad. (1997) [Student Project] (Unpublished)

Naziron, Haziq Izzuddin (2016) Construction of piling works / Haziq Izzuddin Naziron. (2016) [Student Project] (Unpublished)

Sensing, Mozzi Solomon (2006) Reliability of jack-in method in assessing pile Bearing capacity / Mozzi Solomon Sensing. (2006) [Student Project] (Unpublished)

Zaidi, Noorza Ameleana Piling work: multipurpose hall / Noorza Ameleana Zaidi. [Student Project] (Unpublished)

This list was generated on Sun Jul 27 08:06:21 2025 UTC.