Mohamad Zaki, Mohamad Afif
(2016)
The work process of piles and pile caps / Mohamad Afif Mohamad Zaki.
Industrial Training.
Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
(Unpublished)
Abstract
This report explains about process and how to build a pile cap. Pile cap is an important element in the structural foundation, which the load from column to piles therefore this report will discuss about a piling and pile cap. This reports is divided into several part and start from background of company and background of site project. From observation, pile cap is not easy to build and if there are errors installation during the construction , it will affect the structure in the future. In this project there are have 492 number of pile cap, different shape and different size of pile cap, based on drawing. This report can explain in more detail about the process and method build a precast concrete pile and pile cap.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Mohamad Zaki, Mohamad Afif 2013324465 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Mat Yassin, Mohd Fadzil UNSPECIFIED |
Subjects: | T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Hydraulic filling T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Foundations T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Foundations > Piles and pile-driving |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Process, Piles, Pile caps |
Date: | 2016 |
URI: | https://ir.uitm.edu.my/id/eprint/47745 |