Items where Division is "Faculty of Architecture, Planning and Surveying" and Year is 2013

Group by: Creators | Item Type | No Grouping
Number of items: 72.

Monograph

Construction of concrete dome structure / Mohd Zulfakarudin Shukri. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Installation of Novec 1230 supression system / Mohd Shazali Che Lah. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The installation of aluminium top hung with fix glass window and aluminium sliding glass door / Mohamad Azuar Mohd Anuar. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pre-contract in construction projects / Nur Fazzira Himsappikeri. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Roof construction / Najwa Asyila Kamal Shahrizan. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Certificate of completion and compliance / Muhammad Firdaus Mohd Arif. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Mechanical and electrical installation / Nur Nabilah Hannah Ghazali. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction of In-Situ concrete staircase / Wan Abdul Wafi Wan Abdul Ghani. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pile test method / Azril Aizat Ab Aziz. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Plastering work using pump / Muhammad Hazwan Miden. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction of substructure / Muhammad Farhan Ahmad Asri. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pad foundation construction / Nurhamizah Mazlan. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Piling test / Nurul Nor Hidayah Mat Zain. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Kerja-kerja bumbung / Mohamad Adli Mohammad. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method statement for earthwork / Nur Aina Akmal Mohd Noor. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Design of building using AutoCAD / Muhammad Farhan Rusdi. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method statement on testing of pile foundation / Mohamad Nazmi Ghumat. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Reinforcement concrete work on the ground beams and columns / Mohamad Fazli Zamzam. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Certificate of Fitness for Occupation (CFO) / Izatul Akma Ahmad. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Drain closure: method and safety aspects / Ahmad Syahid Adnan. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Safety and health at construction site / Rabiatul Amira Alias. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method construction of reinforcement concrete pile / Muhammad Faiz Yaacob. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Methods involved before and during tender evaluation process / Adlina Hailani. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Method of lock-up construction / Ahmad Zaidi Mohamed Anuar. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The climbing tower crane for construction of a high rise building / Muhammad Zaid Rusli. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Industrialised building system elements: Precast half slab, beam and column / Saifulhisham Mohamad Shaffiee. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Structural works / Nor Suziana Mohamad. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The construction of debris flow barriers / Muhammad Luqman Mohd Ali. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Mivan formwork / Zamirul Azmer Zamri. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The installation of drainage system and staircase for 8 lot double storeys terrace at Laman Annur, Panji, Kota Bharu, Kelantan / Muhamad Iskandar Ismail. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Building condition survey at Etiqa Twins, Jalan Penang, 50450 Kuala Lumpur / Muhammad Azim Asyraf Mohd Lizah. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Method for piling work in Tasek Kenyir / Mohd Safwan Roslam. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Building condition assessment: dampness / Nurdiyana Mohd Sobri. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Pre-contract in construction stage / Muhaamad Haffiz Abd Hamid. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

The installation of water reticulation and drainage system / Siti Nor Fatihah Mohamad Azmi. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Maintenance planning / Muhamad Nazreen Nazle Asmade. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Installation of retaining wall at 3 storey house at Tanjung Bungah / Mohd Izham Mohd Zin. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)

Works and maintenance service on air conditioning system at UiTM Seri Iskandar Campus Perak / Saidatul Farhana Harun. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Site management at Pulau Bayas, Tasik Kenyir / Ahmad Muzammil Zulkeflee. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Leakage, crack and dampness in building at Universiti Teknologi MARA, Seri Iskandar, Perak Darul Ridzuan / Allif Norhasim. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Tender process for the operation and non-comprehensive maintenance of water features, pools and plumbing systems at common estate, Masjid Asy-Syakirin KLCC and multi level car park at Uda Dayaurus Sdn. Bhd. / Fatin Nabilah Lukman. (2013) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)

Defect at East Block, Politeknik Mersing, Johor Darul Takzim / Mohamad Syazwan Rohazat. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Building plan approval and the implementation at MBKT / Muhammad Shaharuddin Ruslan. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)

Tendering process for renovation work case study: Maybank Malayan Banking / Nurul Asyiah Mohamad Fua’at. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Finishing work case study: double storeys terrace at Laman Annur, Panji, Kota Bharu / Noor Aniza Ismail. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Construction management: installation of reinforcement bar & concreting works / Ahmad Firdaus Abd Latif. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Process of building plan approval: housing scheme / Noor Fatehah Mustaffa. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Building condition assessment at Dataran Maybank, Jalan Maarof, Bangsar / Muhammad Falihin Abdul Mallek. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

The role of maintaining agent in joint management body / Amirul Ashraf Asrulniza. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Building plan approval / Asriady Amran. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Maintenance works of air conditioning at Faculty of Office Management (FPP) Universiti Teknologi MARA (Perak) / Muhammad Khairulazman Khadzali. (2013) Industrial Training. Universiti Teknologi MARA, Perak.

Construction management Qlassic assessment at Idaman Lavender 2 / Nur Khairunnisa Kamal. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)

Certificate of complete and compliance for Maternity Hospital Kuala Terengganu / Nor Salwana Bidin. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)

Student Project

Pelaksanaan agro-pelancongan di Muzium Padi Alor Setar, Kedah dan pengaruhnya terhadap sektor pelancongan / Mohamad Amirul Afif Mohamad Ashri. (2013) [Student Project] (Submitted)

Location criteria for schools in Ipoh central business district / Sabariah Mansor. (2013) [Student Project] (Unpublished)

Ministry of Woman, Family & Community Development / Muhammad Shahrin Safri ... [et al.]. (2013) [Student Project]

Attorney General Chamber (AGC), Putrajaya / Muhammad Nurhamzah Khairi ... [et al.]. (2013) [Student Project] (Unpublished)

National resources and environment (Wisma Sumber Asli) / Azinuddin Azlani ... [et al.]. (2013) [Student Project] (Unpublished)

Menara Majlis Perbandaran Seberang Perai, Pulau Pinang / Nur Adha Radhiah Ab Llah ... [et al.]. (2013) [Student Project] (Unpublished)

Science & Technology Tower 1, UiTM Shah Alam / Michelle Majalap Mojiun ... [et al.]. (2013) [Student Project]

Mechanical in building services: Permaisuri Resort & Hotel / Muhammad Kamil Akram Zainal Abidin. (2013) [Student Project]

Master work programme using Microsoft project / Nur Dalila Mat Desa. (2013) [Student Project]

Dampness penetration through wall in student room / Nur Solehah Salihun. (2013) [Student Project]

Kota Johor Lama sebagai salah satu destinasi pelancongan warisan di Kota Tinggi Johor / Saidah Haziqah Salim. (2013) [Student Project] (Unpublished)

Pelaksanaan kemudahan sokongan rekreasi di Pantai Sepat Kuantan Pahang / Nor Syazwani Mohd Ismail. (2013) [Student Project] (Unpublished)

Transformasi pusat bandar Muar sebagai lokasi pelancongan warisan / Muhammad Haniff Zakaria. (2013) [Student Project] (Unpublished)

Menara Majlis Perbandaran Ampang Jaya / Muhamad Zamir Khairi Ahmad Khairani ... [et al.]. (2013) [Student Project]

Dataran Maybank / Afiq Eqwan Azman ... [et al.]. (2013) [Student Project]

Building condition assessment at Stadium Pengkalan Tentera Laut Diraja Malaysia (TLDM), Lumut / Mohd Rozaimi Shafiee. (2013) [Student Project]

Penyediaan tempat letak kereta di Flat Taman Beringin, Jinjang Utara, Kuala Lumpur / Muhammad Hafizudin Roszai. (2013) [Student Project] (Unpublished)

Method of application waterstop case study: Pembinaan Gabungan Pengusaha Rakyat (GPRC) / Mohd Ariffin Ahmad. (2013) [Student Project]

Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid. (2013) [Student Project]

This list was generated on Sat Dec 21 23:36:58 2024 UTC.