Construction of concrete dome structure / Mohd Zulfakarudin Shukri. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Installation of Novec 1230 supression system / Mohd Shazali Che Lah. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The installation of aluminium top hung with fix glass window and aluminium sliding glass door / Mohamad Azuar Mohd Anuar. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pre-contract in construction projects / Nur Fazzira Himsappikeri. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Roof construction / Najwa Asyila Kamal Shahrizan. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Certificate of completion and compliance / Muhammad Firdaus Mohd Arif. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Mechanical and electrical installation / Nur Nabilah Hannah Ghazali. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of In-Situ concrete staircase / Wan Abdul Wafi Wan Abdul Ghani. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pile test method / Azril Aizat Ab Aziz. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Plastering work using pump / Muhammad Hazwan Miden. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of substructure / Muhammad Farhan Ahmad Asri. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pad foundation construction / Nurhamizah Mazlan. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Piling test / Nurul Nor Hidayah Mat Zain. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Kerja-kerja bumbung / Mohamad Adli Mohammad. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method statement for earthwork / Nur Aina Akmal Mohd Noor. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Design of building using AutoCAD / Muhammad Farhan Rusdi. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method statement on testing of pile foundation / Mohamad Nazmi Ghumat. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Reinforcement concrete work on the ground beams and columns / Mohamad Fazli Zamzam. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Certificate of Fitness for Occupation (CFO) / Izatul Akma Ahmad. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Drain closure: method and safety aspects / Ahmad Syahid Adnan. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Safety and health at construction site / Rabiatul Amira Alias. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method construction of reinforcement concrete pile / Muhammad Faiz Yaacob. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Methods involved before and during tender evaluation process / Adlina Hailani. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Method of lock-up construction / Ahmad Zaidi Mohamed Anuar. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The climbing tower crane for construction of a high rise building / Muhammad Zaid Rusli. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Industrialised building system elements: Precast half slab, beam and column / Saifulhisham Mohamad Shaffiee. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Structural works / Nor Suziana Mohamad. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The construction of debris flow barriers / Muhammad Luqman Mohd Ali. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Mivan formwork / Zamirul Azmer Zamri. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The installation of drainage system and staircase for 8 lot double storeys terrace at Laman Annur, Panji, Kota Bharu, Kelantan / Muhamad Iskandar Ismail. (2013) Industrial Training. Universiti Teknologi MARA, Perak.
Building condition survey at Etiqa Twins, Jalan Penang, 50450 Kuala Lumpur / Muhammad Azim Asyraf Mohd Lizah. (2013) Industrial Training. Universiti Teknologi MARA, Perak.
Method for piling work in Tasek Kenyir / Mohd Safwan Roslam. (2013) Industrial Training. Universiti Teknologi MARA, Perak.
Building condition assessment: dampness / Nurdiyana Mohd Sobri. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Pre-contract in construction stage / Muhaamad Haffiz Abd Hamid. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
The installation of water reticulation and drainage system / Siti Nor Fatihah Mohamad Azmi. (2013) Industrial Training. Universiti Teknologi MARA, Perak.
Maintenance planning / Muhamad Nazreen Nazle Asmade. (2013) Industrial Training. Universiti Teknologi MARA, Perak.
Installation of retaining wall at 3 storey house at Tanjung Bungah / Mohd Izham Mohd Zin. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)
Works and maintenance service on air conditioning system at UiTM Seri Iskandar Campus Perak / Saidatul Farhana Harun. (2013) Industrial Training. Universiti Teknologi MARA, Perak.
Site management at Pulau Bayas, Tasik Kenyir / Ahmad Muzammil Zulkeflee. (2013) Industrial Training. Universiti Teknologi MARA, Perak.
Leakage, crack and dampness in building at Universiti Teknologi MARA, Seri Iskandar, Perak Darul Ridzuan / Allif Norhasim. (2013) Industrial Training. Universiti Teknologi MARA, Perak.
Tender process for the operation and non-comprehensive maintenance of water features, pools and plumbing systems at common estate, Masjid Asy-Syakirin KLCC and multi level car park at Uda Dayaurus Sdn. Bhd. / Fatin Nabilah Lukman. (2013) Industrial Training. Universiti Teknologi Mara, Perak, Seri Iskandar, Perak. (Unpublished)
Defect at East Block, Politeknik Mersing, Johor Darul Takzim / Mohamad Syazwan Rohazat. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building plan approval and the implementation at MBKT / Muhammad Shaharuddin Ruslan. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)
Tendering process for renovation work case study: Maybank Malayan Banking / Nurul Asyiah Mohamad Fua’at. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Finishing work case study: double storeys terrace at Laman Annur, Panji, Kota Bharu / Noor Aniza Ismail. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Construction management: installation of reinforcement bar & concreting works / Ahmad Firdaus Abd Latif. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Process of building plan approval: housing scheme / Noor Fatehah Mustaffa. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)
Building condition assessment at Dataran Maybank, Jalan Maarof, Bangsar / Muhammad Falihin Abdul Mallek. (2013) Industrial Training. Universiti Teknologi MARA, Perak.
The role of maintaining agent in joint management body / Amirul Ashraf Asrulniza. (2013) Industrial Training. Universiti Teknologi MARA, Perak.
Building plan approval / Asriady Amran. (2013) Industrial Training. Universiti Teknologi MARA, Perak.
Maintenance works of air conditioning at Faculty of Office Management (FPP) Universiti Teknologi MARA (Perak) / Muhammad Khairulazman Khadzali. (2013) Industrial Training. Universiti Teknologi MARA, Perak.
Construction management Qlassic assessment at Idaman Lavender 2 / Nur Khairunnisa Kamal. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)
Certificate of complete and compliance for Maternity Hospital Kuala Terengganu / Nor Salwana Bidin. (2013) Industrial Training. Universiti Teknologi MARA, Perak. (Unpublished)
Student Project
Pelaksanaan agro-pelancongan di Muzium Padi Alor Setar, Kedah dan pengaruhnya terhadap sektor pelancongan / Mohamad Amirul Afif Mohamad Ashri. (2013) [Student Project] (Submitted)
Location criteria for schools in Ipoh central business district / Sabariah Mansor. (2013) [Student Project] (Unpublished)
Ministry of Woman, Family & Community Development / Muhammad Shahrin Safri ... [et al.]. (2013) [Student Project]
Attorney General Chamber (AGC), Putrajaya / Muhammad Nurhamzah Khairi ... [et al.]. (2013) [Student Project] (Unpublished)
National resources and environment (Wisma Sumber Asli) / Azinuddin Azlani ... [et al.]. (2013) [Student Project] (Unpublished)
Menara Majlis Perbandaran Seberang Perai, Pulau Pinang / Nur Adha Radhiah Ab Llah ... [et al.]. (2013) [Student Project] (Unpublished)
Science & Technology Tower 1, UiTM Shah Alam / Michelle Majalap Mojiun ... [et al.]. (2013) [Student Project]
Mechanical in building services: Permaisuri Resort & Hotel / Muhammad Kamil Akram Zainal Abidin. (2013) [Student Project]
Master work programme using Microsoft project / Nur Dalila Mat Desa. (2013) [Student Project]
Dampness penetration through wall in student room / Nur Solehah Salihun. (2013) [Student Project]
Kota Johor Lama sebagai salah satu destinasi pelancongan warisan di Kota Tinggi Johor / Saidah Haziqah Salim. (2013) [Student Project] (Unpublished)
Pelaksanaan kemudahan sokongan rekreasi di Pantai Sepat Kuantan Pahang / Nor Syazwani Mohd Ismail. (2013) [Student Project] (Unpublished)
Transformasi pusat bandar Muar sebagai lokasi pelancongan warisan / Muhammad Haniff Zakaria. (2013) [Student Project] (Unpublished)
Menara Majlis Perbandaran Ampang Jaya / Muhamad Zamir Khairi Ahmad Khairani ... [et al.]. (2013) [Student Project]
Dataran Maybank / Afiq Eqwan Azman ... [et al.]. (2013) [Student Project]
Building condition assessment at Stadium Pengkalan Tentera Laut Diraja Malaysia (TLDM), Lumut / Mohd Rozaimi Shafiee. (2013) [Student Project]
Penyediaan tempat letak kereta di Flat Taman Beringin, Jinjang Utara, Kuala Lumpur / Muhammad Hafizudin Roszai. (2013) [Student Project] (Unpublished)
Method of application waterstop case study: Pembinaan Gabungan Pengusaha Rakyat (GPRC) / Mohd Ariffin Ahmad. (2013) [Student Project]
Construction works for piling system at Infant Jesus Convent School / Mohamad Nur Arif Majid. (2013) [Student Project]