Abstract
This report summarizes the process of preparing quotations for the Giatmara project. The company has 14 to 30 days to complete and submit the quotation. The aim of this report is to identify the quotation process and identify problems in completing the quotation process. In this report, there are two research methods used to obtain information about the process of preparing these citations: primary and secondary. In this study, the primary method was interview. For interviews, interview sessions were conducted with someone with experience preparing project quotations, such as supervisors and contractors. According to the findings of this analysis, the process of completing a quotation begins with registration, purchase, completion, and submission. Problems in perfecting quotations are incorrect costs, spelling and typing errors, inaccurate plant and equipment evaluations. Hopefully this report can provide many advantages and benefits to the reader on how the passage solves the problem situation while preparing the passage.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Shamsudin, Nursyakirah 2019203422 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Hadzaman, Nor Asma Hafizah UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TA Engineering. Civil engineering > Contractors' operations and equipment. Contracting. (General works) T Technology > TH Building construction T Technology > TH Building construction > Buildings: Construction with reference to use.Including public buildings, dwellings |
Divisions: | Universiti Teknologi MARA, Perak > Faculty of Architecture, Planning and Surveying |
Keywords: | Project Giatmara |
Date: | 2022 |
URI: | https://ir.uitm.edu.my/id/eprint/92162 |