Abstract
"Industrialized Building System" (IBS) is a prefabricated construction technique or building construction method. Components are produced under controlled conditions (at the factory or at the construction site) and carried and installed at the building construction site with minimal use of workers. IBS should be used together with a Pre-Approved Plan (PAP) while implementing the project. The objective of this report is to explain the advantages of a construction if using the “Industrial Building Construction System”. Among the objectives of (IBS) are improving the quality and productivity of construction and speeding up the construction period. Government agencies should refer to the Manual for Industrialized document Building System (IBS) Construction Industry Standard (CIS 18: 2018) for IBS calculation method published by the Industrial Development Board Construction (CIDB). The government has decided to make the IBS technique essential for government projects of RM10 million or more, with a minimum rate of 70% IBS score value, as well as to define the modular coordination to be utilised as building design guidelines. The implementation of this IBS is applicable to the procurement of work by tender and negotiations continue. The installation of IBS components shall be carried out by a skilled worker recognized by CIDB. An open IBS system can be used in building construction execution, i.e. an IBS component system that emphasises the design of something building based on the use of the Modular Coordination standard, MS 1064. It is open to all usable structural components adopted from various IBS manufacturers to build a building.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Azri, Fauzan Aizat 2019409454 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Othman, Mohamad Hamdan UNSPECIFIED Thesis advisor Hadzaman, Nor Asma Hafizah UNSPECIFIED Thesis advisor Ismail, Dzulkarnaen UNSPECIFIED |
Subjects: | T Technology > TH Building construction > Details in building design and construction.Including walls, roofs |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | construction work, steel framing system, Industrialized Building System (IBS) |
Date: | 2022 |
URI: | https://ir.uitm.edu.my/id/eprint/83725 |