Super structure / Sufian Ashari

Ashari, Sufian (2017) Super structure / Sufian Ashari. Industrial Training. Universiti Teknologi MARA, Perak. (Submitted)

Abstract

Construction developers or project owners comprise both the owner and contractor development project. In either capacity, developers have certain obligations should be clearly stated in the contract documents. The probability of a successful completion of the project can be enhanced if the measure was included. If the first step is not included, the chance for delays and enable increased conflict. Companies Larisan Maju Sdn. Bhd. was established on September 21, 2002. The purpose of the Company is established as the Housing Developers and Building Contractors. PKK Class A license, and Bumiputra status and licensed CIDB G7 Class. Located at No12, Jalan Bunga Matahari, Taman pertama Fasa 4, 45200 Sabak Bernam, Selangor Darul Ehsan

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Ashari, Sufian
2014817486
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Zaidi, Mohd Azian
UNSPECIFIED
Subjects: T Technology > TH Building construction > Details in building design and construction.Including walls, roofs
T Technology > TH Building construction > Construction equipment in building
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Programme: Diploma in Building Surveying
Keywords: Super structure, procedures, materials
Date: 2017
URI: https://ir.uitm.edu.my/id/eprint/65486
Edit Item
Edit Item

Download

[thumbnail of 65486.pdf] Text
65486.pdf

Download (5MB)

ID Number

65486

Indexing

Statistic

Statistic details