Abstract
Practical training is a course that should be completed by all students who took the final semester of Diploma in Building Surveying. Students can choose where company or palace to conduct the practical training. I have selected the state government departments of the TFC Time Future Construction. As a place for the practical training. The site supervisor as a leader in this site had been appointed to be my supervisor during the training. During the practical training, I learned about the use of concrete in construction of apartments. For example, knowing that each type or grade of concrete, know the making and delivery of concrete to the construction site. Practical training will be end after four months the students complete the training. Finally, students will then prepare a report according to the topics that relevant to the work during the practical training that had been done.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Roslam, Mohd Safwan 2010209088 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Ahmad Zawawi, Zuraihana UNSPECIFIED |
Subjects: | T Technology > TH Building construction T Technology > TH Building construction > Details in building design and construction.Including walls, roofs T Technology > TH Building construction > Construction equipment in building |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Programme: | Diploma in Building Surveying |
Keywords: | Piling work; Piling equipment; Construction machinery |
Date: | 2013 |
URI: | https://ir.uitm.edu.my/id/eprint/63813 |