Method for piling work in Tasek Kenyir / Mohd Safwan Roslam

Roslam, Mohd Safwan (2013) Method for piling work in Tasek Kenyir / Mohd Safwan Roslam. Industrial Training. Universiti Teknologi MARA, Perak.

Abstract

Practical training is a course that should be completed by all students who took the final semester of Diploma in Building Surveying. Students can choose where company or palace to conduct the practical training. I have selected the state government departments of the TFC Time Future Construction. As a place for the practical training. The site supervisor as a leader in this site had been appointed to be my supervisor during the training. During the practical training, I learned about the use of concrete in construction of apartments. For example, knowing that each type or grade of concrete, know the making and delivery of concrete to the construction site. Practical training will be end after four months the students complete the training. Finally, students will then prepare a report according to the topics that relevant to the work during the practical training that had been done.

Metadata

Item Type: Monograph (Industrial Training)
Creators:
Creators
Email / ID Num.
Roslam, Mohd Safwan
2010209088
Contributors:
Contribution
Name
Email / ID Num.
Thesis advisor
Ahmad Zawawi, Zuraihana
UNSPECIFIED
Subjects: T Technology > TH Building construction
T Technology > TH Building construction > Details in building design and construction.Including walls, roofs
T Technology > TH Building construction > Construction equipment in building
Divisions: Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying
Programme: Diploma in Building Surveying
Keywords: Piling work; Piling equipment; Construction machinery
Date: 2013
URI: https://ir.uitm.edu.my/id/eprint/63813
Edit Item
Edit Item

Download

[thumbnail of 63813.pdf] Text
63813.pdf

Download (1MB)

ID Number

63813

Indexing

Statistic

Statistic details