Abstract
The purpose of this industrial training is to make sure that what I had learned from the first semester to the last semester at UiTM be applied during the internship session. It also give more new experience and knowledge and also
improving the communication skill to make sure that we can speak with confidence with people and also other staff. It is compulsory for building survey to carry this report because it give 40% from the total mark for this semester.
As a conclusion, by doing this industrial training, I had gain more information and knowledge about how to manage the construction site and workers at site. I fell so glad because from this internship, I have knew many thing such as how to solve a problem at site and to work with the professionals. I hope this report which has be done are following the requirement and lecturer are sastified with
my report.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Mohd Saufii, Muhammad Aliff Fahmi 2015888266 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Mohammad Ali, Irwan UNSPECIFIED |
Subjects: | T Technology > TA Engineering. Civil engineering > Earthwork. Foundations T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Hydraulic filling T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Foundations T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Foundations > Piles and pile-driving |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Building, Foundation, International Islamic University College |
Date: | 2018 |
URI: | https://ir.uitm.edu.my/id/eprint/49092 |