Azhar, Muhammad Norfitri
(2016)
Piling work at Seksyen 25 market project / Muhammad Norfitri Azhar.
Industrial Training.
Universiti Teknologi Mara, Perak, Seri Iskandar, Perak.
(Unpublished)
Abstract
To understand the flow of construction moreover about the piling work on site . Other than that , practical report is mandatory for all UiTM student that undergoing practical training in semester 6. Report also will explain briefly about piling work on the site including the procedure , machineries and also the load test.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Azhar, Muhammad Norfitri 2013316159 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Zaidi, Mohammad Azian UNSPECIFIED |
Subjects: | T Technology > TA Engineering. Civil engineering > Earthwork. Foundations T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Hydraulic filling T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Foundations T Technology > TA Engineering. Civil engineering > Earthwork. Foundations > Foundations > Piles and pile-driving |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Piling work, Piling, Market |
Date: | 2016 |
URI: | https://ir.uitm.edu.my/id/eprint/48976 |