Abstract
Practical exercises give space and opportunities for students to recognize that the real world of work before graduation. In this way students can adapt all lessons that will be used in the training industry. In addition, it also can test students to overcome challenges to communicate
with people outside the farm that is designed to ensure a proper schedule. This program is the student must complete at least 16 weeks of practical training. Starting from December 30, 2015 until March 31, 2016. In the last four months in the Kembang Serantau Sdn Bhd I have this
theory and practical learning can be shared at the same time that it is useful to understand. The industrial training for 4 months I can distinguish academic and practical training can be combined to improve the construction sector to cooperate with each other knowledge. To adapt
to the atmosphere of a real job and dynamic. To adjust the knowledge learned at university in challenges in the workplace. Experience in the training industry for future learning. To build effective interaction and communication capabilities at all levels. foster teamwork and collaboration with universities and industry. Generate reports related to the right to run industry.
Metadata
Item Type: | Monograph (Industrial Training) |
---|---|
Creators: | Creators Email / ID Num. Mohd Razali, Siti Nur Syafhiqah 2013285308 |
Contributors: | Contribution Name Email / ID Num. Thesis advisor Jamaludin, Nazhatulzalkis UNSPECIFIED |
Subjects: | T Technology > TA Engineering. Civil engineering > Structural engineering > Specific structural forms, analysis, and design T Technology > TA Engineering. Civil engineering > Structural engineering > Specific structural forms, analysis, and design > Walls T Technology > TH Building construction > Walls T Technology > TH Building construction > Wall panels T Technology > TH Building construction > Wall panels > Malaysia |
Divisions: | Universiti Teknologi MARA, Perak > Seri Iskandar Campus > Faculty of Architecture, Planning and Surveying |
Keywords: | Wall system, Wall, Solid wall |
Date: | 2016 |
URI: | https://ir.uitm.edu.my/id/eprint/47167 |